← Back
BuildNYC
Two stories - detached, small or mid-size
46-40 KISSENA BOULEVARD
QUEENS · BIN 4116553
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,272 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · Owner of record: 4640 Kissena · 3,900 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential Rooftop Grid-tied Solar PV System3p · 2 filings · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
Site & exterior30p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4640 Kissena1907/08/2026
13214 Realty404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/21/2024$1.2M—Private party → 4640 Kissena$943/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edward Lui Architect602/19/2026
Square Arch108/04/2025
Cherico King Architect206/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cherico King Architect P403/21/2026
Amergy Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Excellent Metropolitanspecialty_contractor303/21/2026
Excellent MetropolitanScaffold107/08/2026
Amergy Solarspecialty_contractor104/09/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G Engineering7778702/19/2026
Sq. Arch4802108/04/2025
Triangle Inspection & Tes7495110/02/2024
Cherico King Architect5674206/18/2022
Building Lifecycle
04/28/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION AND CONVERSION OF A DETACHED 2-STORY 2-FAMILY HOUSE WITH 2-STORY PLUS CELLAR HORIZONTAL EXPANSION.
Q01076535-I1
04/08/2026
Objection resolved — Addressed
04/06/2026
Objection raised — Scope
03/10/2026
Objection resolved — Addressed
03/06/2026
Objection raised — Admin
74 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAmergy Solar08/06/2025
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building02/04/2025
DOB NOWMechanical SystemsPermit IssuedExcellent Metropolitan11/06/2024
DOB NOWConstruction FenceSigned-offExcellent Metropolitan10/31/2024
1 project · most recent 02/19/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
02/19/2026Permit IssuedExcellent MetropolitanHeating and Air Conditioning Systems, Ventilation Systems
2 projects · most recent 02/19/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
02/19/2026Signed-offWatson's Plumbing, Heating, & BuildingStorm, Water/Sanitary
06/18/2022——Gas, Water/Sanitary
2 projects · most recent 08/08/2025
General Wiring
FiledStatusContractorScope
08/08/2025CompleteKJK ElectricGeneral Wiring
08/04/2025CompleteI.P. Electric—
1 project · most recent 02/19/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
02/19/2026Signed-offWatson's Plumbing, Heating, & BuildingSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/18/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
07/21/2025Air barrier — testing XIONGCAI GUenergy_progress
07/21/2025Mechanical SystemsXIONGCAI GUspecial
07/21/2025Concrete - Cast-In-PlaceXIONGCAI GUspecial
07/21/2025Excavations - Sheeting, Shoring, and BracingXIONGCAI GUspecial
07/21/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
07/21/2025Heating SystemsXIONGCAI GUspecial
07/21/2025MasonryXIONGCAI GUspecial
07/21/2025Structural Stability – Alterations of existing buildingsXIONGCAI GUspecial
07/21/2025Structural Steel - DetailsXIONGCAI GUspecial
07/21/2025Structural Steel - High Strength BoltingXIONGCAI GUspecial
07/21/2025Structural Steel - WeldingXIONGCAI GUspecial
07/21/2025Subgrade InspectionsXIONGCAI GUspecial
07/21/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/21/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
07/21/2025FinalYIPENG LUANprogress
07/21/2025Fire-Resistance Rated ConstructionXIONGCAI GUprogress
07/21/2025Footing and FoundationXIONGCAI GUprogress
07/21/2025Structural Wood FrameXIONGCAI GUprogress
07/21/2025MeteringXIONGCAI GUenergy_progress
07/21/2025Fenestration areasXIONGCAI GUenergy_progress
07/21/2025Insulation placement and R valuesXIONGCAI GUenergy_progress
07/21/2025Fenestration air leakageXIONGCAI GUenergy_progress
07/21/2025Interior lighting powerXIONGCAI GUenergy_progress
07/21/2025HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
07/21/2025Permanent certificateXIONGCAI GUenergy_progress
Latest 25 of 72.
178 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account