← Back
Two family frame
46-43 206 STREET
QUEENS · Bayside · BIN 4156987
💬 Discuss this project
2023Year Built
2.5Stories
B2Building Class
R3-1Zoning
3,294 sfGross Floor Area
2Units
Two family frame · Owner of record: QUEENS Z & X LLC · 4,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof2p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/11/2022$950K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS102/06/2024
MEHDI GHAZI, P.E., P.C.412/15/2023
MEI ARCHITECT PLLC103/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC803/21/2026
IBUILD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor1203/21/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor303/21/2026
KJK ELECTRIC INCElectrical103/22/2026
ACCORD POWER INCGeneral Contractor107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561102/06/2024
MEHDI GHAZI, P.E. P.C.7129412/15/2023
TRIANGLE INSPECTION & TES7495212/15/2023
Building Lifecycle
All (60)Filed (6)Permit Issued (7)Signed Off (5)Inspection (9)Objection (6)Special Inspection (27)
07/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/07/2025
Signed off — Alteration
INSTALLATION OF NEW CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08021811-I1
03/05/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/04/2024
Permit issued — Curb Cut
Q08021811-I1-CC
10/29/2024
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q08009114 AND GAR #Q00901313. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08009114-S2
10/29/2024
Signed off — Alteration
Q07998787-I1
08/20/2024
Signed off — Alteration
Installation of 7.38 kw solar energy system on roof. No change of occupancy, use or egress.
Q01000864-I1
08/19/2024
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q08009114 AND GAR #Q00901313. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08009114-S3
08/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/03/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/08/2024
Permit issued — Solar
Q01000864-I1-SL
02/06/2024
Filed — Alteration
Installation of 7.38 kw solar energy system on roof. No change of occupancy, use or egress.
Q01000864-I1
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
02/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
02/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
02/05/2024
Special inspection requirement — Final
Malathi Ananthakrishnan
02/05/2024
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
12/22/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/15/2023
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q08009114 AND GAR #Q00901313. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08009114-P1
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
12/15/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
12/15/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/15/2023
Special inspection requirement — Sprinkler Systems
MEHDI GHAZI
12/15/2023
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
12/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
12/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
12/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
10/20/2023
Permit issued — Plumbing
Q08009114-S3-PL
07/20/2023
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q08009114 AND GAR #Q00901313. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08009114-S3
07/18/2023
Permit issued — Structural
Q08009114-S2-FO-EA
07/18/2023
Permit issued — General Construction
Q08009114-S2-GC
07/18/2023
Permit issued — Earth Work
Q08009114-S2-ST
05/31/2023
Permit issued — Construction Fence
Q07998787-I1-FN
03/29/2023
Objection raised — Scope
03/29/2023
Objection resolved — Addressed
03/29/2023
Objection raised — Structural
03/29/2023
Objection resolved — Addressed
03/29/2023
Objection raised — Inspections
03/29/2023
Objection resolved — Addressed
03/21/2023
Filed — Alteration
INSTALLATION OF NEW CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08021811-I1
03/20/2023
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q08009114 AND GAR #Q00901313. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08009114-S2
02/23/2023
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
02/23/2023
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
02/23/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
02/23/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
02/23/2023
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
02/23/2023
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
02/23/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/23/2023
Special inspection requirement — Masonry
MEHDI GHAZI
02/23/2023
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
02/23/2023
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
02/23/2023
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
02/23/2023
Special inspection requirement — Final
MEHDI GHAZI
02/23/2023
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
02/23/2023
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
09/16/2022
Filed — Alteration
Q07998787-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offL&L CONSTRUCTION DEVELOP11/04/2024
DOB NOWSolarSigned-offACCORD POWER INC04/08/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC10/20/2023
DOB NOWStructuralSigned-offPRIMROSE SERVICE INC07/18/2023
DOB NOWGeneral ConstructionSigned-offPRIMROSE SERVICE INC07/18/2023
DOB NOWEarth WorkSigned-offPRIMROSE SERVICE INC07/18/2023
DOB NOWConstruction FenceSigned-offPRIMROSE SERVICE INC05/31/2023
BIS—ISSUEDPRIMROSE SERVICE INC06/22/2023
1 project · most recent 04/05/2024
FiledStatusContractorScope
04/05/2024CompletePOWER SURGE ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/05/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
02/05/2024Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
02/05/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
02/05/2024Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
02/05/2024FinalMalathi Ananthakrishnanprogress
02/05/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
12/15/2023Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
12/15/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
12/15/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/15/2023Sprinkler SystemsMEHDI GHAZIspecial
12/15/2023Energy Code Compliance InspectionsMEHDI GHAZIprogress
12/15/2023HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
12/15/2023HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
12/15/2023HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
02/23/2023Concrete - Cast-In-PlaceMEHDI GHAZIspecial
02/23/2023Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
02/23/2023Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
02/23/2023Structural Steel - High Strength BoltingMEHDI GHAZIspecial
02/23/2023Structural Steel - WeldingMEHDI GHAZIspecial
02/23/2023Subgrade InspectionsMEHDI GHAZIspecial
02/23/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/23/2023MasonryMEHDI GHAZIspecial
02/23/2023Structural Steel - DetailsMEHDI GHAZIspecial
02/23/2023Energy Code Compliance InspectionsMEHDI GHAZIprogress
02/23/2023Structural Wood FrameMEHDI GHAZIprogress
02/23/2023FinalMEHDI GHAZIprogress
Latest 25 of 27.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q07998787-I1Request digital key ↗
08/23/2026Q01000864-I1Request digital key ↗
08/15/2026Q08021811-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION2
10/13/2022421805041Open ↗
10/08/2022440749709Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
09/15/2023440749709Open ↗
10/08/2022440749709Open ↗
▸BISWORK PERMIT APPLICATION1
07/20/2023421805041Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
03/18/2025440749709Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08009114-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q07998787-I1Open ↗
08/25/2026Q08021811-I1Open ↗
08/13/2026Q01000864-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01000864-I1Open ↗
08/23/2026Q01000864-I1Open ↗
08/23/2026Q01000864-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01000864-I1Open ↗
08/23/2026Q01000864-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/08/2022440749709Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/08/2022440749709Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q08009114-S2Open ↗
08/13/2026Q08009114-P3Open ↗
▸BISSEWER CUT-OFF1
07/20/2023421805041Open ↗
▸BISGAS CUT-OFF1
07/20/2023421805041Open ↗
▸Safety & Tenant Protection9
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/20/2023421805041Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
07/20/2023421805041Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/20/2023421805041Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/15/2023440749709Open ↗
▸BISSTREET TREE CHECKLIST1
10/08/2022440749709Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/20/2023421805041Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q08009114-S2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08009114-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08009114-S2Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/20/2023421805041Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q08009114-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q08009114-S2Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/20/2023421805041Open ↗
07/20/2023421805041Open ↗
07/20/2023421805041Open ↗
Showing 3 of 5 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
07/20/2023421805041Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/18/2025440749709Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01000864-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
07/20/2023421805041Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
03/18/2025440749709Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
07/20/2023421805041Open ↗
10/13/2022421805041Open ↗
▸BISADDITIONAL INFORMATION1
09/15/2023440749709Open ↗
▸BISEFILING COVER SHEET1
10/13/2022421805041Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/08/2022440749709Open ↗
▸Other Documents12
▸BISBPP - SUPPORTING DOCUMENTATION4
03/18/2025440749709Open ↗
03/18/2025440749709Open ↗
03/18/2025440749709Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q08009114-I1Open ↗
08/13/2026Q08009114-S2Open ↗
08/13/2026Q08009114-P3Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/18/2025440749709Open ↗
10/08/2022440749709Open ↗
▸BISDOT COMPLIANCES FOR OPPOSITE CORNER PED- RAMP IMPROVEMENT1
04/29/2025440749709Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q08009114-S2Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q08009114-P3Open ↗