← Back
Gas station with retail store
46 FURMAN AVENUE
BROOKLYN · BIN 3861637
💬 Discuss this project
1986Year Built
1Stories
G3Building Class
C8-1Zoning
170 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Gas station with retail store · Owner of record: BUSHWICK GROUP 26 LLC · 4,400 sf lot · 0.04 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATOMIC CONTRACTING1207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/06/2024$2.9M—BUSHWICK BH LLC → UNITED GROUP 555 LLC$16,776/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC403/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING P C403/21/2026
RAD DEVELOPMENT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor303/21/2026
LEVEL 10 CONSTRUCTION GR*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108108/15/2024
Building Lifecycle
All (8)Filed (4)Permit Issued (1)Signed Off (1)Special Inspection (2)
04/16/2025
Signed off — Full Demolition
Full Demolition of Gas station Metal Roof exempt from plans
B01096520-I1
03/31/2025
Filed — Full Demolition
Full Demolition of Gas station Metal Roof exempt from plans
B01096520-P2
02/27/2025
Permit issued — Full Demolition
B01096520-I1-FD
02/04/2025
Special inspection requirement — Demolition
sion hourizadeh
02/04/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
sion hourizadeh
01/24/2025
Filed — Full Demolition
Full Demolition of Gas station Metal Roof exempt from plans
B01096520-P1
01/16/2025
Filed — Full Demolition
Full Demolition of Gas station Metal Roof exempt from plans
B01096520-S1
08/15/2024
Filed — Full Demolition
Full Demolition of Gas station Metal Roof exempt from plans
B01096520-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offLEVEL 10 CONSTRUCTION02/27/2025
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC—
1 project · most recent 03/31/2025
Fence
FiledStatusContractorScope
03/31/2025Signed-offLEVEL 10 CONSTRUCTION GR*Fence
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/04/2025Demolitionsion hourizadehspecial
02/04/2025Structural Stability – Alterations of existing Buildingssion hourizadehspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B01096520-S1Request digital key ↗
08/23/2026B01096520-P2Request digital key ↗
08/23/2026B01096520-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01096520-P2Open ↗
08/23/2026B01096520-P1Open ↗
08/23/2026B01096520-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B01096520-I1Open ↗
08/23/2026B01096520-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026B01096520-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01096520-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01096520-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01096520-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01096520-P1Open ↗
08/23/2026B01096520-S1Open ↗
08/23/2026B01096520-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRodent Control1
08/13/2026B01096520-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification2
08/23/2026B01096520-P1Open ↗
08/23/2026B01096520-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026B01096520-P1Open ↗
08/13/2026B01096520-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01096520-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01096520-I1Open ↗