DOB01/15/2025PARTIAL VACATE ORDER DUE TO CONCRETE CRACK @ BEAMS SUPPORTING EXTERIOR BALACONIES @ N & W ELEV, EXP 1&4. THESE CONDITIONS HAVE THEREFORE MADE ALL BALACONIES @ N & W ELEV PLUS THE ENTIRE ROOF @ 2ND FL UNABLE TO BE OCCUPIED. REMEDY: VACATE ALL BALACONIES AT N AND W ELEV EXP 1&4 ALSO THE ENTIRE ROOF @ 2ND FLR
DOB07/05/2024CYCLE 9B UNSAFE REPORT FILED
ECB05/06/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #900590. REMEDY: SUBMIT ACCEPTABLE REQU$1K due
DOB12/01/2023FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB02/22/2023FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB06/17/2019V-DOB VIOLATION - ACTIVE
DOB05/20/2019FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB01/31/2019FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
ECB01/24/2018FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. AT TIMEOF INSPECTION 9 OBSRVED AN EXPOSURE #2 NORTH ELEVATION: BULGING BRICKSON BULKHEAD NORTH ELEVATION. EXP#4 SOUTH ELEVATION: CRACKS ON BALCONI$250 due
DOB04/15/2016V-DOB VIOLATION - ACTIVE
DOB05/30/2014VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
DOB03/12/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
HPD09/22/2000SECTION 27-2050 ADM CODE PROVIDE 3 EXTRA SPRINKLER HEADS AND SUITABLE WRENCH FOR EMERGENCY PURPOSES AT O.S.Y. VALVE OF SPRINKLER IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT CELLAR
HPD09/22/2000SECTION 27-2050 ADM CODE SEAL IN OPEN POSITION THE O.S.Y. VALVE OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT CELLAR
HPD09/22/2000SECTION 27-2050 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM.
DOB05/31/1994V-DOB VIOLATION - ACTIVE
DOB03/18/1993V-DOB VIOLATION - ACTIVE
DOB04/07/19921
ECB04/20/2026FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#900590.REM:FILE ACCEPTABLE REPORT.Hearing held — result not yet published
ECB01/03/2025FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT A DESIGNATED UNSAFE BUILDING FACADE AS PER TECHNICAL REPORT #7R6-900590-9B-1 07/05/2024. NOTE: AT TIME OF ISNPECTION I OBSERVED NO SAFETY MEASURES INothing owed — awaiting certificate of correction
ECB02/22/2019FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/ VIOLATION #3265087N ISSUED ON 1/18/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLENothing owed — awaiting certificate of correction
ECB08/25/2009FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT STAIRWAY C WHICH LEADS BACK INTO PUBLIC FOYER (LOBBY) FROM CELLAR,BEING USED AS GARBAGE ROOM GARBAGE BLOCKING EXIT DOOR FROM CELLAR UNABLE TO DISCHARGE OUNothing owed — awaiting certificate of correction