← Back
One story - permanent living quarter
46 PINE TERRACE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5080424
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R3XZoning
1,973 sfGross Floor Area
1Units
One story - permanent living quarter · 4,700 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/10/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/07/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01151523-I1
12/19/2024
Permit issued — Solar
S01151523-I1-SL
12/10/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01151523-I1
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/05/2024
Special inspection requirement — Final
Walid Abdulla
12/05/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/19/2024
2 projects · most recent 12/10/2024
General Wiring
FiledStatusContractorScope
12/10/2024CompleteSUNRUN SOLAR ELECTL CORP—
10/31/2024CompleteDAVEN ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/05/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/05/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/05/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/05/2024FinalWalid Abdullaprogress
12/05/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01151523-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S01151523-I1Open ↗
08/26/2026S01151523-I1Open ↗
08/26/2026S01151523-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S01151523-I1Open ↗
08/26/2026S01151523-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01151523-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01151523-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01151523-I1Open ↗