← Back
Primarily 2 family with 1 store or office
46 WEST 11 STREET
MANHATTAN · Greenwich Village · BIN 1009521
💬 Discuss this project
1841Year Built
3Stories
S2Building Class
R6Zoning
4,932 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,061 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M WOODS ASSOCIATES503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC106/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LLOYD NOEL BUILDING CONSULTANT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BREFFNI MECHANICAL INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292106/16/2022
Building Lifecycle
All (15)Filed (1)Permit Issued (1)Signed Off (1)Violation (5)Special Inspection (7)
10/13/2023
Signed off — Alteration
Direct replac. of (2) package rooftop units mounted on existing dunnage, replace rooftop ductwork only. Install (2) split systems AC units, condensers to be mounted on existing steel dunnage & to connect to dunnage. Note: No demo work to carried out
M00734578-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2022
Permit issued — Mechanical Systems
M00734578-I1-MS
06/16/2022
Filed — Alteration
Direct replac. of (2) package rooftop units mounted on existing dunnage, replace rooftop ductwork only. Install (2) split systems AC units, condensers to be mounted on existing steel dunnage & to connect to dunnage. Note: No demo work to carried out
M00734578-I1
05/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
05/09/2022
Special inspection requirement — Final
Yahaira Volquez Colombo
05/09/2022
Special inspection requirement — Mechanical Systems
Jose Santos
05/09/2022
Special inspection requirement — Maintenance information
Jose Santos
05/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
05/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
05/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/18/2007
Violation issued (ECB, closed)
Boilers
08/09/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBREFFNI MECHANICAL07/09/2022
BISBLISSUEDALL AMERICAN PLBG&HTG INC10/15/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/31/2005
BISMHISSUEDMARLIN MEHCNIAL CORP10/17/1995
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/10/2022Energy Code Compliance InspectionsJose Santosprogress
05/09/2022FinalYahaira Volquez Colomboprogress
05/09/2022Mechanical SystemsJose Santosspecial
05/09/2022Maintenance informationJose Santosenergy_progress
05/09/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
05/09/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
05/09/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/02/2026M00734578-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
09/02/2026M00734578-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00734578-I1Open ↗
09/01/2026M00734578-I1Open ↗
09/01/2026M00734578-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/02/2026M00734578-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M00734578-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026M00734578-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00734578-I1Open ↗