← Back
Elevator apt, semi-fireproof without stores
46 WEST 86 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031385
💬 Discuss this project
1911Year Built
5Stories
D1Building Class
R10AZoning
9,205 sfGross Floor Area
9Units
Rent Stabilized6 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: THE 46 WEST 86TH STREET LLC · 2,554 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
46TH W 86TH STREET807/08/2026
THE 46 WEST 86TH STREET LLC103/22/2026
DR. TRAYKOVSKI MD P.C.103/22/2026
THE 46 WEST 86 STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.207/28/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RALEIGH POWELL LIC ELECElectrical103/22/2026
ACE-ATLAS PLBING & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808207/28/2025
Building Lifecycle
All (46)Filed (2)Permit Issued (2)Signed Off (2)Violation (34)Inspection (3)Special Inspection (3)
04/29/2026
Violation issued (HPD, closed)
A
12/03/2025
Signed off — Alteration
REPLACE GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01243992-I1
12/03/2025
Signed off — Alteration
REPLACE GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01243992-S1
10/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/12/2025
Permit issued — Plumbing
M01243992-S1-PL
08/06/2025
Permit issued — Boiler Equipment
M01243992-I1-BE
07/28/2025
Filed — Alteration
REPLACE GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01243992-I1
07/28/2025
Filed — Alteration
REPLACE GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01243992-S1
07/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
06/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
06/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
11/22/2024
Violation issued (HPD, closed)
I
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
06/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/10/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/02/2015
Violation issued (HPD, closed)
I
05/27/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/20/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/21/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/20/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/27/2008
Violation issued (HPD, open)
B
07/23/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/07/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/26/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2001
Violation issued (ECB, closed)
Elevators
01/04/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/15/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/08/1996
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/17/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offACE-ATLAS PLBING & HTG08/12/2025
DOB NOWBoiler EquipmentSigned-offROCKWAY FUEL OIL CORP08/06/2025
BISPLISSUEDDEPIETRO PLUMBING05/20/1994
BISMHISSUEDMILLINIUM BUILDIERS CORP.04/29/1994
1 project · most recent 08/04/2025
Boiler Controls
FiledStatusContractorScope
08/04/2025CompleteRALEIGH POWELL LIC ELECBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/28/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
06/19/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
06/19/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026M01243992-I1Request digital key ↗
08/22/2026M01243992-S1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M01243992-S1Open ↗
08/13/2026M01243992-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M01243992-I1Open ↗
08/26/2026M01243992-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M01243992-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M01243992-I1Open ↗
08/13/2026M01243992-S1Open ↗