← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
46 WHITE STREET
MANHATTAN · BIN 1002198
💬 Discuss this project
1867Year Built
5Stories
RMBuilding Class
C6-2AZoning
20,631 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 3,786 sf lot · 5.45 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 18 docs
Floor 71p · 1 filing · 18 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XL REAL PROPERTY MANAGEMENT507/08/2026
CANIDO BASONAS CONSTRUCTION607/08/2026
PLATINUM SERVICES NY503/22/2026
46 WHITE STREET6003/22/2026
METRO CONTRACTNG NY INC503/22/2026
48-50 WHITE ST CORP C/103/22/2026
40 WHITE ST LLC103/22/2026
46 WHITE LLCC OPETER MOORE ASSO603/21/2026
46 WHITE1603/21/2026
46 WHITE STREET CONDOMINIUM403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SILMAN110/09/2025
SPIELER BOEHMKE ARCHITECTS PLLC110/07/2025
ASHRAF CORP107/09/2024
TABULA ARCHITECTURE STUDIO405/27/2021
SYED ENGINEERING, P.C.209/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
ANZALONE ARCHITECTURE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPIRE SCAFFOLDING & HOISTGeneral Contractor707/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
RED OAK RENOVATIONS CORPGeneral Contractor207/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES9731110/09/2025
RYAN SPECIAL ENGINEERING2018210/09/2025
TABULA ARCHITECTURE STUDI6296405/27/2021
Building Lifecycle
All (108)Filed (9)Permit Issued (9)Signed Off (5)Facade (FISP) (6)Violation (56)Objection (6)Special Inspection (17)
08/19/2026
Violation issued (ECB, open)
Construction
10/09/2025
Filed — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH CONSTRUCTION OF NEW ACCESS STAIR AND BULKHEAD TO ROOF TERRACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01241771-S1
10/07/2025
Filed — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH CONSTRUCTION OF NEW ACCESS STAIR AND BULKHEAD TO ROOF TERRACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01241771-I1
09/19/2025
Special inspection requirement — Structural Steel - Welding
EDWIN HOPKINS
09/19/2025
Special inspection requirement — Concrete - Cast-In-Place
EDWIN HOPKINS
09/19/2025
Special inspection requirement — Structural Steel - High Strength Bolting
EDWIN HOPKINS
09/19/2025
Special inspection requirement — Structural Steel - Details
EDWIN HOPKINS
09/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
STEPHEN BOEHMKE
06/16/2025
Special inspection requirement — Final
STEPHEN BOEHMKE
06/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
06/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
06/16/2025
Special inspection requirement — Final
William Ryan
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
06/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
06/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
10/16/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01066282-I1
07/25/2024
Cycle 9 facade report signed — SAFE
07/09/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01066282-I1
07/09/2024
Permit issued — Sidewalk Shed
M01066282-I1-SH
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade inspection completed
04/11/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00129240-I1
04/11/2023
Signed off — Alteration
M00226181-I1
11/02/2022
Violation issued (HPD, closed)
I
07/02/2021
Violation issued (FDNY_NOV, closed)
06/29/2021
Signed off — Alteration
REMODEL KITCHEN, BATHROOM AND LAUNDRY AND INSTALL NEW BBQ GRILL ON TERRACE IN CONJUNCTION WITH APARTMENT RENOVATION AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. RELATED GENERAL CONSTRUCTION AND MECHANICAL FILED SEPARATELY
M00344274-I1
06/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CATHERINE SPIELER
05/28/2021
Signed off — Alteration
INSTALL NEW MECHANICAL EXHAUST FOR MASTER BATHROOM, KITCHEN RANGE AND DRYER AND CONNECT TO EXISTING VENTS IN CONJUNCTION WITH APARTMENT RENOVATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS. RELATED GENERAL CONSTRUCTION AND PLUMBING FILED SEPARATELY.
M00344312-I1
05/28/2021
Permit issued — Mechanical Systems
M00344312-I1-MS
05/27/2021
Filed — Alteration
REMODEL KITCHEN, BATHROOM AND LAUNDRY AND INSTALL NEW BBQ GRILL ON TERRACE IN CONJUNCTION WITH APARTMENT RENOVATION AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. RELATED GENERAL CONSTRUCTION AND MECHANICAL FILED SEPARATELY
M00344274-P2
05/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CATHERINE SPIELER
03/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/10/2020
Objection resolved — Addressed
12/08/2020
Objection raised — Plumbing
12/07/2020
Filed — Alteration
REMODEL KITCHEN, BATHROOM AND LAUNDRY AND INSTALL NEW BBQ GRILL ON TERRACE IN CONJUNCTION WITH APARTMENT RENOVATION AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. RELATED GENERAL CONSTRUCTION AND MECHANICAL FILED SEPARATELY
M00344274-P1
11/23/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
CATHERINE SPIELER
10/28/2020
Violation issued (FDNY_NOV, closed)
08/06/2020
Permit issued — Plumbing
M00344274-I1-PL
08/05/2020
Permit issued — Mechanical Systems
M00344312-I1-MS
08/03/2020
Objection resolved — Addressed
07/21/2020
Violation issued (FDNY_NOV, closed)
07/10/2020
Objection resolved — Addressed
07/09/2020
Objection raised — Other
07/07/2020
Filed — Alteration
REMODEL KITCHEN, BATHROOM AND LAUNDRY AND INSTALL NEW BBQ GRILL ON TERRACE IN CONJUNCTION WITH APARTMENT RENOVATION AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. RELATED GENERAL CONSTRUCTION AND MECHANICAL FILED SEPARATELY
M00344274-I1
07/07/2020
Filed — Alteration
INSTALL NEW MECHANICAL EXHAUST FOR MASTER BATHROOM, KITCHEN RANGE AND DRYER AND CONNECT TO EXISTING VENTS IN CONJUNCTION WITH APARTMENT RENOVATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS. RELATED GENERAL CONSTRUCTION AND PLUMBING FILED SEPARATELY.
M00344312-I1
07/07/2020
Objection raised — Plumbing
04/30/2020
Permit issued — Sidewalk Shed
M00129240-I1-SH
04/30/2020
Permit issued — Supported Scaffold
M00226181-I1-SF
04/24/2020
Special inspection requirement — Mechanical Systems
CATHERINE SPIELER
04/24/2020
Special inspection requirement — Final
CATHERINE SPIELER
04/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/17/2019
Filed — Alteration
M00226181-I1
09/17/2019
Permit issued — Supported Scaffold
M00226181-I1-SF
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2019
Cycle 8 facade inspection completed
07/25/2019
Cycle 8 facade report signed — SWARMP
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2019
Permit issued — Sidewalk Shed
M00129240-I1-SH
03/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/01/2019
Cycle 8 facade report submitted
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/09/2024
DOB NOWMechanical SystemsSigned-offRED OAK RENOVATIONS CORP05/28/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/06/2020
DOB NOWMechanical SystemsSigned-offRED OAK RENOVATIONS CORP08/05/2020
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST04/30/2020
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST04/30/2020
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST09/17/2019
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST04/17/2019
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST02/15/2019
BISOTISSUEDRED OAK RENOVATIONS CORP02/25/2021
BISOTISSUEDRED OAK RENOVATIONS CORP08/05/2020
BISOTISSUEDCANIDO BASONAS CONST SVC02/27/2020
BISOTISSUEDCANIDO BASONAS CONST SVC09/16/2019
BISPLISSUEDARCON PLBG SOLUTIONS07/01/2019
BIS—ISSUEDCERTIFIED OF N.Y. INC01/31/2019
BISSPISSUEDKG SPRINKLER CORP12/15/2018
BISPLISSUEDARCON PLBG SOLUTIONS06/19/2018
BIS—ISSUEDCERTIFIED OF N.Y. INC05/09/2018
BISSDISSUEDAAA TOTAL PLUMBING INC12/16/2010
BISSPISSUEDAAA TOTAL PLUMBING INC09/15/2009
BISPLISSUEDAAA TOTAL PLUMBING, INC09/15/2009
BISPLISSUEDAAA TOTAL PLUMBING, INC09/15/2009
BISEQISSUEDMETRO CONTRACTING NY, INC.06/22/2009
BISPLISSUEDR&A HEATING & CONTRG CO.I06/12/2009
BISOTISSUEDFRED HARRIS CONSTRUCTION03/27/2009
BISMHISSUEDFRED HARRIS CONSTRUCTION03/27/2009
BISSPISSUEDAAA TOTAL PLUMBING INC03/18/2009
BIS—ISSUEDFRED HARRIS CONSTRUCTION03/05/2009
BISPLISSUEDAMOK INC03/03/2009
BISPLISSUEDAAA TOTAL PLUMBING, INC02/20/2009
BISOTISSUEDFULTON GENERAL CONTRACTOR02/20/2009
BISOTISSUEDFULTON GENERAL CONTRACTOR02/20/2009
BISMHISSUEDFULTON GENERAL CONTRACTOR02/20/2009
BISMHISSUEDFULTON GENERAL CONTRACTOR02/20/2009
BISMHISSUEDFULTON GENERAL CONTRACTOR02/19/2009
BISOTISSUEDFRED HARRIS CONSTRUCTION02/19/2009
BISOTISSUEDFULTON GENERAL CONTRACTOR02/19/2009
BISMHISSUEDHORIZON FINE INTERIOR,INC12/16/2008
BISPLISSUEDAAA TOTAL PLUMBING, INC12/16/2008
BIS—ISSUEDFULLERTON GENERAL CONTRAC11/26/2008
+ 19 more permits on file
5 projects · most recent 06/20/2024
General Wiring Lighting
FiledStatusContractorScope
06/20/2024CompleteILLUMINOUS ELECTRIC CORP.—
11/02/2020CompleteBELMONT ELECTRICAL, INCGeneral Wiring
02/13/2019CompleteAUJLA ELECTRIC CORP—
02/11/2019CompleteTOP SHELF ELECTRIC CORP—
05/16/2018CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring, Lighting
1 project · most recent 10/09/2025
Steel Concrete
FiledStatusContractorScope
10/09/2025——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/19/2025Structural Steel - WeldingEDWIN HOPKINSspecial
09/19/2025Concrete - Cast-In-PlaceEDWIN HOPKINSspecial
09/19/2025Structural Steel - High Strength BoltingEDWIN HOPKINSspecial
09/19/2025Structural Steel - DetailsEDWIN HOPKINSspecial
09/18/2025Fire-Resistance Rated ConstructionSTEPHEN BOEHMKEprogress
06/16/2025FinalSTEPHEN BOEHMKEprogress
06/16/2025Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
06/16/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
06/16/2025FinalWilliam Ryanprogress
06/16/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/16/2025Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
06/16/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
06/08/2021Fire-Resistant Penetrations and JointsCATHERINE SPIELERspecial
05/19/2021Fire-Resistant Penetrations and JointsCATHERINE SPIELERspecial
11/23/2020Fire-Resistant Penetrations and JointsCATHERINE SPIELERspecial
04/24/2020Mechanical SystemsCATHERINE SPIELERspecial
04/24/2020FinalCATHERINE SPIELERprogress
▾Documents — 540 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch3
08/26/2026M01066282-I1Request digital key ↗
08/21/2026M01241771-S1Request digital key ↗
08/21/2026M01241771-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00344274-I1Request digital key ↗
08/15/2026M00344274-P2Request digital key ↗
08/15/2026M00344274-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00129240-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00226181-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00344312-I1Request digital key ↗
▸Applications & Permits103
▸BISWORK PERMIT APPLICATION51
08/05/2020123831318Open ↗
03/02/2020140863545Open ↗
09/16/2019140863545Open ↗
Showing 3 of 51 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION40
12/11/2020123831318Open ↗
07/08/2020123831318Open ↗
10/09/2019123239325Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M00344274-I1Open ↗
08/13/2026M00344274-P2Open ↗
08/13/2026M00344274-P1Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
04/07/2011120460508Open ↗
04/06/2011120459869Open ↗
10/12/2010120065142Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
04/02/2019123239325Open ↗
Showing 1 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/11/2020123831318Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
08/09/2023123239325Open ↗
▸Seals & Professional Certifications113
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION65
06/24/2019140716296Open ↗
06/24/2019140716296Open ↗
05/10/2018140716296Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M01241771-S1Open ↗
09/01/2026M01241771-S1Open ↗
09/01/2026M01241771-S1Open ↗
Showing 3 of 10 on file for this type
▸BISPC FULL REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00226181-I1Open ↗
08/26/2026M01066282-I1Open ↗
08/21/2026M01241771-S1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
09/13/2010120460508Open ↗
09/10/2010120459869Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/13/2010120460508Open ↗
09/10/2010120459869Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M01241771-S1Open ↗
08/26/2026M01241771-I1Open ↗
08/26/2026M01241771-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/07/2019140863545Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/17/2017140716296Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/07/2019140863545Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/07/2019140863545Open ↗
▸Trade Schedules & Equipment87
▸BISSELF-CERT PLUMBING NOTICE29
06/10/2011110024571Open ↗
02/03/2010110024571Open ↗
12/31/2009110024571Open ↗
Showing 3 of 29 on file for this type
▸BISEQUIPMENT USE PERMITS24
08/24/2010110187306Open ↗
08/24/2010110187306Open ↗
01/05/2010110278930Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING12
11/17/2017140716296Open ↗
Showing 1 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT8
08/24/2010110187306Open ↗
08/24/2010110187306Open ↗
01/05/2010110278930Open ↗
Showing 3 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
10/09/2019123239325Open ↗
03/06/2019123239325Open ↗
09/17/2018123239325Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
06/10/2011110024571Open ↗
06/10/2011110024571Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/17/2023123239325Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
01/29/2018123239325Open ↗
11/20/2017123239325Open ↗
Showing 2 of 3 on file for this type
▸BISTenant Protection Plan and Notes3
02/16/2018140716296Open ↗
12/21/2017123239325Open ↗
08/07/2019140863545Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/11/2020123831318Open ↗
▸Environmental & Asbestos31
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
09/08/2010120460508Open ↗
Showing 1 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
09/10/2010120459869Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026M01241771-I1Open ↗
08/21/2026M01241771-S1Open ↗
08/13/2026M00344274-P2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/08/2020123831318Open ↗
08/07/2019140863545Open ↗
11/20/2017123239325Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/01/2021123831318Open ↗
10/21/2020140863545Open ↗
05/11/2020123831318Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/01/2021123831318Open ↗
10/21/2020140863545Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/07/2019140863545Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY9
07/01/2021123831318Open ↗
07/01/2021123831318Open ↗
12/17/2020123831318Open ↗
Showing 3 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
02/16/2018140716296Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/10/2023123239325Open ↗
▸BISMECHANICAL SYSTEMS1
08/10/2023123239325Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
03/07/2019140716296Open ↗
▸Approvals, Objections & Sign-offs72
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
07/01/2021123831318Open ↗
10/21/2020140863545Open ↗
06/24/2019140716296Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
09/13/2010120460508Open ↗
09/10/2010120459869Open ↗
Showing 2 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
02/02/2018123239325Open ↗
01/06/2010110195495Open ↗
01/05/2010110278930Open ↗
Showing 3 of 11 on file for this type
▸BISLANDMARKS APPROVAL10
07/08/2020123831318Open ↗
08/07/2019140863545Open ↗
10/10/2018123239325Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
02/07/2019123239325Open ↗
02/02/2018123239325Open ↗
11/20/2017123239325Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF2
08/14/2023123239325Open ↗
07/01/2021123831318Open ↗
▸Cost, Insurance & Ownership39
▸BISCOST AFFIDAVIT38
07/01/2021123831318Open ↗
10/21/2020140863545Open ↗
05/11/2020123831318Open ↗
Showing 3 of 38 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/08/2023123239325Open ↗
▸Filing & Intake Forms45
▸BISEFILING COVER SHEET18
05/11/2020123831318Open ↗
02/02/2018123239325Open ↗
11/20/2017123239325Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION13
12/17/2020123831318Open ↗
07/23/2020123831318Open ↗
10/11/2019123239325Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM9
08/05/2020123831318Open ↗
05/11/2020123831318Open ↗
10/09/2019123239325Open ↗
Showing 3 of 9 on file for this type
▸BISeFiling Job Application Cover Sheet5
09/13/2010120460508Open ↗
08/07/2019140863545Open ↗
11/17/2017140716296Open ↗
Showing 3 of 5 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
05/09/2018123239325Open ↗
04/07/2011120460508Open ↗
04/06/2011120459869Open ↗
Showing 3 of 10 on file for this type
▸BISPLOT DIAGRAM1
11/20/2017123239325Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026M01241771-I1Open ↗