← Back
Condo, residential unit in 1-3 story building
Horizon Village Condominium
460/1 CASWELL AVENUE · Westerleigh-Castleton Corners · BIN 5130216
💬 Discuss this project
0Year Built
2Stories
R3Building Class
—Zoning
87,272 sfGross Floor Area
64Units
2 Open Violations ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · Owner of record: HORIZON VILLAGE CONDOMINIUM # 1 · 125,091 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Cellar1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RONALD D.VICTORIO R.A.104/20/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JON ADAMOGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RELIANCE ENGINEERING, P.C322104/20/2022
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
01/11/2023
Signed off — Alteration
Removal and replacement of interior fire rated bearing wall at CEL level for dwelling unit 458-2 Caswell Ave only which was damaged during Hurricane Ida Storm. 458-1 unit requires replacement of fire rated partition only.
S00721392-I1
05/14/2022
Permit issued — Structural
S00721392-I1-GC-CX
04/20/2022
Filed — Alteration
Removal and replacement of interior fire rated bearing wall at CEL level for dwelling unit 458-2 Caswell Ave only which was damaged during Hurricane Ida Storm. 458-1 unit requires replacement of fire rated partition only.
S00721392-I1
04/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
04/19/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Giorgio
04/19/2022
Special inspection requirement — Final
Ronald Victorio
04/19/2022
Special inspection requirement — Fire-Resistance Rated Construction
Ralph Giorgio
04/19/2022
Special inspection requirement — Structural Wood Frame
Ralph Giorgio
05/03/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJON ADAMO05/14/2022
2 projects · most recent 09/24/2021
General Wiring
FiledStatusContractorScope
09/24/2021Permit IssuedSTATEN ISLAND ELEC CONT.General Wiring
09/21/2021Permit IssuedMACK ELECTRICAL INC2 meters, 2 new_meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/19/2022Fire-Resistant Penetrations and JointsRalph Giorgiospecial
04/19/2022Structural Stability – Alterations of existing buildingsRalph Giorgiospecial
04/19/2022FinalRonald Victorioprogress
04/19/2022Fire-Resistance Rated ConstructionRalph Giorgioprogress
04/19/2022Structural Wood FrameRalph Giorgioprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026S00721392-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026S00721392-I1Open ↗
08/28/2026S00721392-I1Open ↗
08/28/2026S00721392-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S00721392-I1Open ↗
08/28/2026S00721392-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/24/2026S00721392-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026S00721392-I1Open ↗