← Back
BuildNYC
Condo, residential unit in 1-3 story building
Horizon Village Condominium
460-1 CASWELL AVENUE · BIN 5130220
💬 Discuss this project
0Year Built
2Stories
R3Building Class
—Zoning
87,272 sfGross Floor Area
64Units
0 Active ViolationsFDNY Report ↗
Condo, residential unit in 1-3 story building · Owner of record: Horizon Village Condominium # 1 · 125,091 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarReplacement of interior bearing wall1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ronald D.victorio R.A104/12/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jon AdamoGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Reliance Engineering322104/12/2022
Building Lifecycle
12/13/2022
Signed off — Alteration
Removal of interior fire rated bearing wall at cellar level which was damaged in Hurricane Ida Storm. Wall reconstruction required & interior fire rated finishes on wall to underside of 1st floor plywood.
S00705660-I1
04/14/2022
Permit issued — Structural
S00705660-I1-GC-CX
04/12/2022
Filed — Alteration
Removal of interior fire rated bearing wall at cellar level which was damaged in Hurricane Ida Storm. Wall reconstruction required & interior fire rated finishes on wall to underside of 1st floor plywood.
S00705660-I1
03/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
03/24/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Giorgio
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJon Adamo04/14/2022
2 projects · most recent 10/12/2021
General Wiring
FiledStatusContractorScope
10/12/2021Permit IssuedHigh Beam ElectricGeneral Wiring
10/08/2021Permit IssuedHigh Beam ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/24/2022Fire-Resistant Penetrations and JointsRalph Giorgiospecial
03/24/2022Structural Stability – Alterations of existing buildingsRalph Giorgiospecial
03/24/2022FinalRonald Victorioprogress
03/24/2022Fire-Resistance Rated ConstructionRalph Giorgioprogress
03/24/2022Structural Wood FrameRalph Giorgioprogress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account