← Back
Predominantly retail with other uses
460 DRIGGS AVENUE
BROOKLYN · BIN 3061623
💬 Discuss this project
1950Year Built
2Stories
K4Building Class
M1-2/R6AZoning
19,755 sfGross Floor Area
13Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 460 DRIGGS AVE LLC · 10,000 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
460 DRIGGS AVE LLC403/22/2026
DYR HOLDINGS LLC703/22/2026
ROSE REALTY ASSOCIATE403/22/2026
DAVBEL PROPERTY1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SMBT CONSULTANTS LLC807/09/2026
YOU GAO312/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.1003/21/2026
INDESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TINO CONSTRUCTION CORPGeneral Contractor607/08/2026
SIGN MASTER USA INCGeneral Contractor303/21/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519607/09/2026
YOU GAO9407212/15/2025
Building Lifecycle
All (99)Filed (11)Permit Issued (8)Violation (49)Inspection (7)Special Inspection (24)
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/09/2026
Filed — Alteration
Propose Construction Fence
B01240000-P4
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/19/2026
Filed — Alteration
Propose Construction Fence
B01240000-S4
05/19/2026
Filed — Alteration
Propose Construction Fence
B01240000-P3
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2026
Permit issued — Sign
B01331934-I1-SG
01/12/2026
Permit issued — Sign
B01331972-I1-SG
01/09/2026
Permit issued — General Construction
B01334191-I1-GC
12/15/2025
Filed — Alteration
INSTALL NEW AWNING & FACADE WORK AT OSP AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01334191-I1
12/15/2025
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01331934-I1
12/15/2025
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01331972-I1
12/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
You Gao
12/15/2025
Special inspection requirement — Final
You Gao
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
10/20/2025
Special inspection requirement — Final
NAVEEN KUMAR
10/20/2025
Special inspection requirement — Concrete - Cast-In-Place
10/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/17/2025
Filed — Alteration
Propose Construction Fence
B01240000-P2
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/15/2025
Special inspection requirement — Concrete - Cast-In-Place
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/15/2025
Special inspection requirement — Final
NAVEEN KUMAR
10/03/2025
Filed — Alteration
Propose Construction Fence
B01240000-P1
10/03/2025
Permit issued — General Construction
B01240000-I1-GC
10/03/2025
Permit issued — Construction Fence
B01240000-S1-FN
10/03/2025
Special inspection requirement — Concrete - Cast-In-Place
10/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/01/2025
Special inspection requirement — Final
NAVEEN KUMAR
09/29/2025
Violation issued (ECB, closed)
Construction
09/29/2025
Violation issued (ECB, closed)
Construction
09/24/2025
Violation issued (ECB, closed)
Construction
09/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/15/2025
Permit issued — Plumbing
B01240000-S2-PL
07/31/2025
Filed — Alteration
Propose Construction Fence
B01240000-S2
07/10/2025
Permit issued — Construction Fence
B01240000-S1-FN
07/07/2025
Filed — Alteration
Propose Construction Fence
B01240000-S1
07/02/2025
Permit issued — General Construction
B01240000-I1-GC
06/18/2025
Filed — Alteration
Propose Construction Fence
B01240000-I1
05/21/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/19/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/24/2022
Violation issued (HPD, closed)
A
10/03/2019
Violation issued (ECB, closed)
Construction
03/14/2018
Violation issued (HPD, closed)
C
03/14/2018
Violation issued (HPD, closed)
B
03/14/2018
Violation issued (HPD, closed)
B
03/14/2018
Violation issued (HPD, closed)
C
03/06/2018
Violation issued (HPD, closed)
B
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedDESTHERS, JOSEPH01/13/2026
DOB NOWSignPermit IssuedDESTHERS, JOSEPH01/12/2026
DOB NOWGeneral ConstructionPermit IssuedSIGN MASTER USA INC01/09/2026
DOB NOWGeneral ConstructionPermit IssuedTINO CONSTRUCTION CORP10/03/2025
DOB NOWConstruction FencePermit IssuedTINO CONSTRUCTION CORP10/03/2025
DOB NOWPlumbingPermit IssuedSUPERIOR PLUMBING & HEATI08/15/2025
DOB NOWConstruction FencePermit IssuedTINO CONSTRUCTION CORP07/10/2025
DOB NOWGeneral ConstructionPermit IssuedTINO CONSTRUCTION CORP07/02/2025
BIS—ISSUEDUNITED INDUSTRIES & CONST05/17/2012
BISSPISSUEDPETER PLUMBING ASSOC. INC.01/13/2011
BISOTISSUEDEXPRESS BUILDERS JB, INC05/28/2009
BIS—ISSUEDUNITECH DESIGN INC03/03/2009
BISOTISSUEDUNITECH DESIGN INC02/06/2009
BISSPISSUEDPETER PLUMBING ASSOC. INC.01/08/2009
BISOTISSUEDGRACECON CORP12/03/2008
BISEQISSUEDGRACECON CORP12/03/2008
BISPLISSUEDPETER PLUMBING ASSOC. INC.09/22/2008
BISOTISSUEDGRACECON CORP.D/B/A NEO P&C CO.09/18/2008
BISMHISSUEDEDEN TRADING CORP.09/11/2008
BISPLISSUEDPREMIER SEWER & WATERMAIN LLC,06/17/2008
1 project · most recent 07/09/2026
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2026Permit IssuedTINO CONSTRUCTION CORPHeating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MODEL NO. PEFY-P72NMHSU-E 80,000 BTU · Vrf Indoor ×4
MODEL NO. PUHY-EP144TNU-A1 160,000 BTU · Vrf Outdoor ×2
Ventilation
— MODEL NO. DU50HFA 1,500 CFM · Exhaust Fan ×1
MODEL NO. SIS-12 SERIAL NO. 9572003 2,100 CFM ×1
Dayton MODEL NO. 56JN95 7,203 CFM · Exhaust Fan ×1
Refrigeration
Krack MODEL NO. LAV25410 83,140 CFM · Refrigeration Unit ×1
1 project · most recent 07/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/09/2026Permit IssuedSUPERIOR PLUMBING & HEATIGas, Water/Sanitary
4 projects · most recent 03/25/2026
General Wiring
FiledStatusContractorScope
03/25/2026CompleteASKO ELEC CONST & MAIN IN—
03/25/2026CompleteASKO ELEC CONST & MAIN IN—
07/17/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
08/23/2018CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 07/09/2026
Steel
FiledStatusContractorScope
07/09/2026Permit IssuedTINO CONSTRUCTION CORPSteel
1 project · most recent 07/09/2026
Fence
FiledStatusContractorScope
07/09/2026Permit IssuedTINO CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/21/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/21/2026Tenant Protection Plan Compliance—special
06/25/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/25/2026Tenant Protection Plan Compliance—special
05/13/2026Tenant Protection Plan Compliance—special
05/13/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/15/2025Structural Stability – Alterations of existing buildingsYou Gaospecial
12/15/2025Fire-Resistant Penetrations and JointsYou Gaospecial
12/15/2025Energy Code Compliance InspectionsYou Gaoprogress
12/15/2025Fire-Resistance Rated ConstructionYou Gaoprogress
12/15/2025FinalYou Gaoprogress
12/11/2025Structural Stability – Alterations of existing buildingsYou Gaospecial
10/20/2025FinalNAVEEN KUMARprogress
10/20/2025Concrete - Cast-In-Place—special
10/20/2025Tenant Protection Plan Compliance—special
10/20/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/15/2025Tenant Protection Plan Compliance—special
10/15/2025Concrete - Cast-In-Place—special
10/15/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/15/2025FinalNAVEEN KUMARprogress
10/03/2025Concrete - Cast-In-Place—special
10/01/2025Tenant Protection Plan Compliance—special
10/01/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/01/2025FinalNAVEEN KUMARprogress
▾Documents — 187 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/19/2026B01334191-I1Request digital key ↗
08/19/2026B01331972-I1Request digital key ↗
08/19/2026B01331934-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION18
05/08/2012310184056Open ↗
02/14/2011310233985Open ↗
02/14/2011310233985Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION15
06/05/2012310184056Open ↗
11/25/2009320073969Open ↗
06/04/2009310138017Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026B01334191-I1Open ↗
▸Seals & Professional Certifications45
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
09/28/2011310233985Open ↗
04/20/2010320073969Open ↗
02/24/2010320073969Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/19/2026B01334191-I1Open ↗
08/17/2026B01240000-P1Open ↗
08/17/2026B01240000-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B01240000-S2Open ↗
09/01/2026B01334191-I1Open ↗
08/29/2026B01240000-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
12/02/2008310233985Open ↗
11/06/2008310189505Open ↗
11/03/2008310189505Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01334191-I1Open ↗
08/29/2026B01240000-P2Open ↗
08/24/2026B01240000-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/02/2008310233985Open ↗
08/26/2008310189505Open ↗
05/14/2008310138017Open ↗
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING12
02/14/2011310233985Open ↗
09/15/2009320073969Open ↗
06/09/2009310189505Open ↗
Showing 3 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
04/11/2011310233985Open ↗
03/07/2011310233985Open ↗
05/06/2010320073969Open ↗
Showing 3 of 9 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
04/11/2011310233985Open ↗
05/05/2010320073969Open ↗
▸Safety & Tenant Protection19
▸DOB NOWHPD-1: Anti-Harassment Area Checklist11
08/17/2026B01240000-P4Open ↗
08/17/2026B01240000-S4Open ↗
08/17/2026B01240000-P3Open ↗
Showing 3 of 11 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
12/02/2008310233985Open ↗
08/26/2008310189505Open ↗
06/03/2008310138017Open ↗
▸BISHPD-1: Anti-Harassment Area Checklist3
02/05/2009310250180Open ↗
09/18/2008310184056Open ↗
02/27/2009310250199Open ↗
▸BISST-1: Street Tree Checklist1
09/18/2008310184056Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026B01334191-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/19/2026B01334191-I1Open ↗
08/17/2026B01240000-P1Open ↗
08/17/2026B01240000-S2Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
01/24/2009310250180Open ↗
01/23/2009310250199Open ↗
12/02/2008310233985Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
09/15/2009320073969Open ↗
08/26/2008310189505Open ↗
05/14/2008310138017Open ↗
▸Approvals, Objections & Sign-offs16
▸BISADMINISTRATIVE OBJECTIONS7
09/15/2009320073969Open ↗
01/28/2009310250180Open ↗
01/23/2009310250199Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/28/2011310233985Open ↗
11/05/2008310189505Open ↗
06/17/2008310138017Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/28/2011310233985Open ↗
06/07/2011310233985Open ↗
06/08/2010320073969Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
05/08/2012310184056Open ↗
08/19/2008310184056Open ↗
▸BISSUPERSEDING LETTER1
11/03/2008310189505Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
09/28/2011310233985Open ↗
06/07/2011310233985Open ↗
06/08/2010320073969Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET7
09/15/2009320073969Open ↗
01/28/2009310250180Open ↗
01/23/2009310250199Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION1
08/19/2008310184056Open ↗