← Back
BuildNYC
Condo, residential unit in 2-10 unit building
460 EAST NEW YORK AVENUE
BROOKLYN · BIN 3106519
💬 Discuss this project
1920Year Built
5Stories
R1Building Class
R6Zoning
5,168 sfGross Floor Area
8Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: 460 Eny Ave · 2,000 sf lot · 2.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
PenthouseProposed sprinkler system installation68p · 4 filings · 20 docs
Floor 4Proposed sprinkler system installation61p · 4 filings · 20 docs
Floor 3Proposed sprinkler system installation65p · 4 filings · 20 docs
Floor 2Proposed sprinkler system installation60p · 4 filings · 20 docs
Floor 1Proposed sprinkler system installation65p · 4 filings · 20 docs
CellarProposed sprinkler system installation60p · 4 filings · 20 docs
Site & exteriorSidewalk scaffold with debris netting63p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
460 Eny Ave703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jimenez Building Consulting406/07/2022
HPL Engineering1103/07/2022
Basic Groups101/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z Building NY2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H&Z Building Consulting IGeneral Contractor707/08/2026
Winway DevelopmentScaffold407/08/2026
United Electrical ContgGeneral Contractor303/22/2026
H&Z Building Consulting IScaffold307/08/2026
Smart Plumbing & HeatingPlumbing207/08/2026
Joseph Weinstein ElectricGeneral Contractor103/22/2026
HPL Engineering P CGeneral Contractor103/22/2026
HF Group Plumbing & SpnklerFire Protection107/08/2026
Fran HuangElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL Engineering5613903/07/2022
Building Lifecycle
05/04/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
06/09/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
12/04/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/28/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
05/25/2023
Apartment 4A sold
89 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offH&Z Building Consulting I01/28/2022
DOB NOWPlumbingSigned-offSmart Plumbing & Heating10/20/2021
DOB NOWSupported ScaffoldSigned-offWinway Development03/30/2021
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler01/25/2021
DOB NOWStructuralSigned-offH&Z Building Consulting I01/20/2021
DOB NOWConstruction FenceSigned-offH&Z Building Consulting I01/20/2021
DOB NOWSidewalk ShedSigned-offWinway Development10/30/2020
DOB NOWStructuralSigned-offH&Z Building Consulting I09/25/2020
DOB NOWConstruction FenceSigned-offH&Z Building Consulting I09/24/2020
DOB NOWStructuralSigned-offH&Z Building Consulting I09/14/2020
DOB NOWPlumbingSigned-offSmart Plumbing & Heating09/09/2020
DOB NOWConstruction FenceSigned-offH&Z Building Consulting I07/23/2020
BIS—ISSUEDH&Z Building Consulting I08/02/2021
BIS—ISSUEDH&Z Building Consulting I01/19/2021
BIS—ISSUEDH&Z Building Consulting I09/21/2020
BIS—ISSUEDH&Z Building Consulting I07/31/2020
4 projects · most recent 06/23/2021
General Wiring
FiledStatusContractorScope
06/23/2021CompleteUnited Electrical Cont'g—
11/03/2020CompleteA.C. Morgan Electric—
10/27/2020CompleteA.C. Morgan ElectricGeneral Wiring
10/09/2018CompleteJoseph Weinstein Electric—
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
06/08/2022FinalJian Yangprogress
03/04/2022HVAC and service water heating equipment Fran Huangenergy_progress
03/04/2022Fire-Resistant Penetrations and JointsFran Huangspecial
03/04/2022Heating SystemsFran Huangspecial
03/04/2022Mechanical SystemsFran Huangspecial
03/04/2022Energy Code Compliance InspectionsFran Huangprogress
03/04/2022FinalFran Huangprogress
03/04/2022HVAC insulation and sealing Fran Huangenergy_progress
03/04/2022Shutoff dampersFran Huangenergy_progress
03/04/2022HVAC and service water heating system controls Fran Huangenergy_progress
03/04/2022Maintenance informationFran Huangenergy_progress
02/04/2022Energy Code Compliance InspectionsFran Huangprogress
02/04/2022HVAC and service water heating equipment Fran Huangenergy_progress
02/04/2022HVAC and service water heating system controls Fran Huangenergy_progress
02/04/2022HVAC insulation and sealing Fran Huangenergy_progress
02/04/2022Fire-Resistant Penetrations and JointsFran Huangspecial
02/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFran Huangspecial
12/17/2021Fire-Resistant Penetrations and JointsFran Huangspecial
12/17/2021Sprinkler SystemsFran Huangspecial
12/01/2021Sprinkler SystemsFran Huangspecial
12/01/2021Fire-Resistant Penetrations and JointsFran Huangspecial
10/22/2020HVAC and service water heating equipment Fran Huangenergy_progress
10/22/2020Fire-Resistant Penetrations and JointsFran Huangspecial
10/22/2020Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFran Huangspecial
10/22/2020Energy Code Compliance InspectionsFran Huangprogress
Latest 25 of 35.
199 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account