RoofUnder Construction33p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Supported Scaffold
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents · 5 drawing sheets
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
INSTALLATION OF A SUPPORTED SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this job
2 documents
Latest 3 of 4 filings on this floor.
Bulkhead6p · 2 filings · 20 docs
ArchitectureDMMechanicalPlumbing
No filed description on record for this job.
On file for this job
16 documents · 5 drawing sheets
No filed description on record for this job.
On file for this job
5 documents · 1 drawing sheet
Floor 22Under Construction31p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Filing herewith Mechanical work as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 21Under Construction42p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 20Under Construction27p · 2 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 19Under Construction32p · 6 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Latest 3 of 6 filings on this floor.
Floor 18Under Construction27p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 17Under Construction30p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Latest 3 of 6 filings on this floor.
Floor 16Under Construction27p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 15Under Construction42p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents
Latest 3 of 4 filings on this floor.
Floor 14Under Construction27p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 13Under Construction42p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents
Latest 3 of 4 filings on this floor.
Floor 12Under Construction27p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 11Under Construction27p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 10Under Construction27p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 9Under Construction42p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents
Latest 3 of 4 filings on this floor.
Floor 8Under Construction27p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 7Under Construction45p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents
Latest 3 of 7 filings on this floor.
Floor 6Under Construction27p · 3 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 5Under Construction31p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Latest 3 of 5 filings on this floor.
Floor 4Under Construction46p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents
Latest 3 of 6 filings on this floor.
Floor 3Under Construction42p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe
Job M01466969Permit Issued · 09/29/2026
INSTALLATION OF A TEMPORARY SPYDER MINI CRANE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. MINI SPYDER CRANE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents
Latest 3 of 4 filings on this floor.
Floor 2Under Construction42p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Floor 1Under Construction33p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
EQUIPMENT USE: INSTALLATION OF A PERSONNEL CONSTRUCTION HOIST COMPLEX AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. HOIST INSTALLED IN COMPLIANCE WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
On file for this job
2 documents · 1 drawing sheet
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Latest 3 of 5 filings on this floor.
Mezzanine4p · 1 filing · 16 docs
DMMechanicalPlumbing
No filed description on record for this job.
On file for this job
16 documents · 4 drawing sheets
CellarUnder Construction43p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents · 1 drawing sheet
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents
Modification to the existing sprinkler system in Cellar and on the 4th FL. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Sub-CellarUnder Construction93p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Construction cost captured under initial job# M01194094-S1.
On file for this job
10 documents · 4 drawing sheets
Replacement and repairs of existing foundation drainage system at subcellar level. Existing clay underdrain pipe to be replaced with new 4-inch slotted HDPE pipe and connected to sump pits.
On file for this job
46 documents · 4 drawing sheets
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or occupancy.
On file for this job
6 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.