💬 Discuss this project
1920Year Built
2.5Stories
A3Building Class
R1-1Zoning
8,104 sfGross Floor Area
1Units
Large suburban residence · 54,181 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
BasementInstallation of back-up power generator1p · 1 filing · 8 docs
Site & exteriorConcrete slab3p · 2 filings · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leder-Luis Architectural Design606/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Leder-Luis Architectural Design603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Balgard LocksmithsGeneral Contractor707/08/2026
Metropolis ElectricElectrical203/21/2026
Tana Temperature Control PLGPlumbing103/21/2026
Skyview Heating & AirPlumbing107/08/2026
Yost & Campbell OfrocklandPlumbing107/08/2026
William Stanislawczyk GeneralGeneral Contractor103/21/2026
Defalco and Sons ElectricElectrical103/22/2026
Yuhan Heating & AirGeneral Contractor101/09/2015
Building Lifecycle
02/06/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/21/2024
Signed off — Alteration
Install new gas generator
X00483308-I1
10/06/2023
Permit renewed — General Construction
Renewed without changes
X00483312-I1-GC
06/28/2023
Filed — Alteration
Install new gas generator
X00483308-P3
03/23/2023
Filed — Alteration
Install new gas generator
X00483308-P2
25 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBalgard Locksmiths10/06/2023
DOB NOWPlumbingSigned-offSkyview Heating & Air10/13/2022
DOB NOWGeneral ConstructionSigned-offBalgard Locksmiths07/26/2022
DOB NOWGeneral ConstructionSigned-offBalgard Locksmiths10/28/2021
DOB NOWPlumbingSigned-offYost & Campbell of Rockland08/10/2021
BISOTISSUEDYuhan Heating & Air01/09/2015
BISOTISSUEDWilliam Stanislawczyk06/09/2004
BISPLISSUEDTana Temperature Control & PLG06/04/2004
BIS—ISSUEDNA01/10/2002
BISPLISSUEDTana Temperature Control & PLG02/23/2001
BISOTISSUEDWilliam Stanislawczyk01/16/2001
2 projects · most recent 10/18/2023
General Wiring
FiledStatusContractorScope
10/18/2023CompleteMetropolis ElectricGeneral Wiring
07/26/2021Permit IssuedDefalco and Sons Electric—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/06/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/11/2023Pass-Final PL - UndergroundPassView ↗
12/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account