| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/18/2026 | Permit Issued | 5 PENN PLAZA LLC | Air Conditioning Systems | Cooling Mitsubishi Electric PUZ-AK12NL 12,000 BTU · Condensing Unit ×5 |
| 05/07/2026 | Permit Issued | 5 PENN PLAZA LLC | Air Conditioning Systems | Cooling Water Furnace V5AH036 38,150 BTU · Wshp ×2 |
| 01/06/2026 | Signed-off | 5 PENN PLAZA LLC | Air Conditioning Systems | Cooling Florida Heat Pump CL030 30,000 BTU · Wshp ×1 |
| 10/21/2025 | Permit Issued | 5 PENN PLAZA LLC | Air Conditioning Systems | Cooling Aaon SA-035-3-A-ET09-000:A0CE-000-EBH-AC0-C00000D-JC-00000CAAB 463,500 BTU · Rooftop Unit ×5 |
| 07/31/2025 | Permit Issued | 5 PENN PLAZA LLC | Air Conditioning Systems | Cooling Skypeak SCSM-D.1-360-4-C-E-SZ-A-S-N-S-W-C-0-E-0-0-0-0-0 398,580 BTU · Wshp ×2 |
| 01/21/2025 | Permit Issued | 5 PENN PLAZA LLC | Air Conditioning Systems | Cooling Titus desv 12,275 CFM ×22 |
| 10/09/2024 | Signed-off | 5 PENN PLAZA LLC | Air Conditioning Systems | Cooling Anemostat EZTS 538,890 BTU · Vav Box ×46 Above Air Technologies SCW024S3000000000TB 24,800 BTU · Condensing Unit ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/28/2026 | Permit Issued | MILLER PLUMBING & HTG INC | — |
| 11/18/2025 | — | — | 109 heads |
| 11/04/2025 | Signed-off | CAPITOL FIRE SPRINKLER CO | 137 heads, 1 outlets |
| 10/21/2025 | Permit Issued | CAPITOL FIRE SPRINKLER CO | 111 heads |
| 10/20/2025 | Permit Issued | CAPITOL FIRE SPRINKLER CO | 222 heads |
| 10/20/2025 | Signed-off | CAPITOL FIRE SPRINKLER CO | 113 heads |
| 09/17/2025 | Permit Issued | CAPITOL FIRE SPRINKLER CO | 10 heads |
| 08/05/2025 | Permit Issued | CAPITOL FIRE SPRINKLER CO | 281 heads, 1 outlets |
| 07/31/2025 | Permit Issued | CAPITOL FIRE SPRINKLER CO | 209 heads |
| 05/17/2022 | Signed-off | CAPITOL FIRE SPRINKLER CO | — |
| 09/03/2021 | Signed-off | CAPITOL FIRE SPRINKLER CO | 113 heads |
| 05/12/2021 | Signed-off | CAPITOL FIRE SPRINKLER CO | 136 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/28/2026 | Permit Issued | MILLER PLBG & HTG INC | Water/Sanitary |
| 11/18/2025 | — | — | Water/Sanitary |
| 11/04/2025 | — | — | — |
| 10/21/2025 | — | — | Water/Sanitary |
| 10/20/2025 | — | — | Water/Sanitary |
| 10/20/2025 | Signed-off | MILLER PLBG & HTG INC | Water/Sanitary |
| 09/17/2025 | Signed-off | MILLER PLBG & HTG INC | Water/Sanitary |
| 08/05/2025 | — | — | Water/Sanitary |
| 07/31/2025 | — | — | Water/Sanitary |
| 10/09/2024 | Signed-off | MILLER PLBG & HTG INC | Water/Sanitary |
| 09/18/2023 | Signed-off | MILLER PLBG & HTG INC | Water/Sanitary |
| 09/03/2021 | Permit Issued | MILLER PLBG & HTG INC | Water/Sanitary |
| 05/12/2021 | Signed-off | MILLER PLBG & HTG INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 05/04/2026 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 02/05/2026 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 01/22/2026 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 10/09/2025 | Permit Issued | COGEN ELEC'L SERVICES,INC | — |
| 01/16/2025 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 12/27/2024 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 10/23/2024 | Complete | J.G.C. ELECTRIC, LLC | — |
| 04/23/2024 | Permit Issued | COGEN ELEC'L SERVICES,INC | — |
| 04/23/2024 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 06/28/2023 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 11/11/2022 | Complete | ELPO ELECTRICAL CONTG INC | — |
| 09/27/2022 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 03/29/2022 | Complete | COGEN ELEC'L SERVICES,INC | General Wiring |
| 10/23/2021 | Complete | NATIONAL MAINT. INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/09/2026 | Permit Issued | OCS BUILDERS GROUP LLC | Steel, Concrete |
| 03/18/2024 | Permit Issued | 5 PENN PLAZA LLC | Steel |
| Owner | Filings | Most Recent |
|---|---|---|
| 5 PENN PLAZA | 984 | 09/13/2026 |
| LEMX CORP | 5 | 03/22/2026 |
| 5 PENN PLAZA LLC EDWARD C | 1 | 03/22/2026 |
| EDWARD S. GORDON COMPANY | 1 | 03/22/2026 |
| 5 PENN OLAZA LLC | 1 | 03/22/2026 |
| 5 PENN PLAYA LLC | 1 | 03/22/2026 |
| 5 PENN SPE | 10 | 03/21/2026 |
| SOHO CONTRACTING | 5 | 03/21/2026 |
| CBRE | 51 | 03/21/2026 |
| 5 PENN PLAZA LLC CB RICHARD ELLI | 15 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| HLW INTERNATIONAL | 11 | 06/29/2026 |
| MG ENGINEERING D.P.C. | 30 | 06/18/2026 |
| BEACH ENGINEERING ASSOCIATES | 1 | 06/09/2026 |
| MASSA MULTIMEDIA ARCHITECTS | 1 | 05/30/2026 |
| TPG ARCHITECTURE, LLP | 13 | 05/28/2026 |
| GENSLER | 6 | 05/04/2026 |
| ELEVATED ENGINEERING, PLLC | 1 | 12/11/2025 |
| AKFENGINEERS LLP | 42 | 11/04/2025 |
| AKF ENGINEERS, LLP | 16 | 05/02/2025 |
| THORNTON TOMASETTI | 3 | 08/27/2024 |
| MCSWEENEY ENGINEERING | 2 | 03/20/2024 |
| SPENCER ENGINEERING, PC | 7 | 11/20/2023 |
| ENTHINK ENGINEERS LLC | 1 | 11/21/2022 |
| DPM ARCHITECTURE, P.C. | 2 | 10/21/2021 |
| SHAABAN ENGINEERING, LLC | 7 | 07/22/2021 |
| KATZ ARCHITECTURE | 1 | 03/19/2021 |
| LEON SKVIRSKY PE | 6 | 12/11/2018 |
| KMB DESIGN GROUP, LLC | 1 | 03/13/2018 |
| SALVATOR A. CARADONNA JR. | 1 | 12/14/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 82 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 42 | 03/21/2026 |
| SMEP DESIGN & CONSULTATION LLC | 2 | 03/21/2026 |
| BUILDING BROTHERS | 12 | 03/21/2026 |
| NATIONAL MAINTENANCE | 14 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 3 | 03/21/2026 |
| DOMANI CONSULTING | 2 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| 5 PENN PLAZA LLC | General Contractor | 145 | 08/26/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 41 | 07/08/2026 |
| MILLER PLBG & HTG INC | Plumbing | 22 | 07/08/2026 |
| NATIONAL MAINTENANCE | Scaffold | 7 | 07/08/2026 |
| CLEAR CHANNEL OUTDOOR | Scaffold | 6 | 07/08/2026 |
| TORRONE, ARTHUR | Electrical | 3 | 03/21/2026 |
| SENID PLBG & HTG CORP | Electrical | 3 | 03/21/2026 |
| LEMX CORP | General Contractor | 3 | 03/21/2026 |
| PRODUCTION CONTRACT. LLC | General Contractor | 3 | 03/21/2026 |
| OCS BUILDERS GROUP LLC | General Contractor | 2 | 08/04/2026 |
| ODYSSIA GLOBAL COMM. CORP | General Contractor | 2 | 03/21/2026 |
| GARY BLANKOPH | Electrical | 2 | 03/21/2026 |
| MILLER PLUMBING & HTG INC | Fire Protection | 2 | 08/25/2026 |
| COGEN ELEC'L SERVICES,INC | Electrical | 2 | 03/22/2026 |
| ROBERT S. COVELLO | Electrical | 2 | 03/22/2026 |
| MARLIN MECHANICAL INC | General Contractor | 2 | 07/08/2026 |
| LEAVITT, NORMAN | Electrical | 1 | 03/21/2026 |
| MICHAEL NAVARRETE | Electrical | 1 | 03/21/2026 |
| POWELL, ANDRE | Electrical | 1 | 03/21/2026 |
| MILLAR ELEVATOR IND., INC | Electrical | 1 | 03/21/2026 |
| ROBERT COVELLO | Electrical | 1 | 03/21/2026 |
| JACOB LEVITA | Electrical | 1 | 03/21/2026 |
| KIRK, DANIEL | Electrical | 1 | 03/21/2026 |
| KARAGIANNIS, DIMITRIOS | Electrical | 1 | 03/21/2026 |
| INTERBORO SIGN MAINTENA | Scaffold | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 74 | 06/29/2026 |
| FENAGH, INC | 6942 | 2 | 06/09/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 5 | 05/28/2026 |
| AKF ENGINEERS, LLP | 2751 | 42 | 05/02/2025 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 8 | 11/18/2024 |
| ATLAS ATC ENGINEERING INC | 8011 | 1 | 08/30/2022 |
| DAVID KATZ, P.E. | 6087 | 1 | 03/19/2021 |
| KMB DESIGN GROUP, LLC | 513 | 1 | 03/13/2018 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Signed-off | DWG SERVICES INC | 09/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | MILLER PLUMBING & HTG INC | 08/24/2026 |
| DOB NOW | Structural | Permit Issued | OCS BUILDERS GROUP LLC | 08/03/2026 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 07/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 07/21/2026 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 07/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 07/16/2026 |
| DOB NOW | General Construction | Permit Issued | OCS BUILDERS GROUP LLC | 06/29/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITOL FIRE SPRINKLER CO | 06/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | CAPITOL FIRE SPRINKLER CO | 06/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | MILLER PLBG & HTG INC | 06/03/2026 |
| DOB NOW | Plumbing | Permit Issued | MILLER PLUMBING & HTG INC | 06/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 06/02/2026 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 06/01/2026 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 05/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 05/18/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITOL FIRE SPRINKLER CO | 04/28/2026 |
| DOB NOW | Plumbing | Signed-off | MILLER PLBG & HTG INC | 03/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | CAPITOL FIRE SPRINKLER CO | 02/20/2026 |
| DOB NOW | Plumbing | Permit Issued | CAPITOL FIRE SPRINKLER CO | 02/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | CAPITOL FIRE SPRINKLER CO | 01/22/2026 |
| DOB NOW | Mechanical Systems | Signed-off | 5 PENN PLAZA LLC | 01/15/2026 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 01/15/2026 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 01/14/2026 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 01/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 01/09/2026 |
| DOB NOW | Sprinklers | Signed-off | MILLER PLBG & HTG INC | 11/18/2025 |
| DOB NOW | Standpipe | Permit Issued | CAPITOL FIRE SPRINKLER CO | 10/15/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 10/02/2025 |
| DOB NOW | General Construction | Signed-off | 5 PENN PLAZA LLC | 09/30/2025 |
| DOB NOW | General Construction | Signed-off | 5 PENN PLAZA LLC | 09/22/2025 |
| DOB NOW | Sprinklers | Permit Issued | CAPITOL FIRE SPRINKLER CO | 09/17/2025 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 08/27/2025 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 08/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 08/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 08/07/2025 |
| DOB NOW | General Construction | Permit Issued | 5 PENN PLAZA LLC | 08/07/2025 |
| DOB NOW | Mechanical Systems | Signed-off | 5 PENN PLAZA LLC | 08/07/2025 |
| DOB NOW | General Construction | Signed-off | 5 PENN PLAZA LLC | 08/07/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | 5 PENN PLAZA LLC | 08/07/2025 |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/13/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/12/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/02/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/11/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/02/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/24/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/24/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 11/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/20/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/20/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/05/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/06/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/28/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/23/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 04/21/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/30/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 06/30/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 06/30/2026 | Mastic and Intumescent Fire-resistant Coatings | Ari Kamo | special |
| 06/30/2026 | Final | Ari Kamo | progress |
| 06/23/2026 | Lighting controls | Ari Kamo | energy_progress |
| 06/23/2026 | Post-installed Anchors | Ari Kamo | special |
| 06/23/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 06/23/2026 | Mechanical Systems | Ari Kamo | special |
| 06/23/2026 | Maintenance information | Ari Kamo | energy_progress |
| 06/23/2026 | Final | Ari Kamo | progress |
| 06/23/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| 06/23/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 06/23/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 05/30/2026 | Post-installed Anchors | AILANTO DANIEL MINAWI | special |
| 05/30/2026 | Fire-Resistant Penetrations and Joints | AILANTO DANIEL MINAWI | special |
| 04/19/2026 | Lighting controls | AILANTO DANIEL MINAWI | energy_progress |
| 04/19/2026 | Final | gabriel massa | progress |
| 04/19/2026 | Interior lighting power | AILANTO DANIEL MINAWI | energy_progress |
| 04/09/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 04/09/2026 | Fire-Resistance Rated Construction | Christopher Drutjons | progress |
| 04/09/2026 | Final | Stephanie Lan | progress |
| 11/12/2025 | Post-installed Anchors | Ari Kamo | special |
| 11/12/2025 | Sprinkler Systems | Ari Kamo | special |
| 11/12/2025 | Standpipe Systems | Ari Kamo | special |
| 11/12/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |