← Back
Two family converted from one family
461 LEXINGTON AVENUE
BROOKLYN · BIN 3050491
💬 Discuss this project
1899Year Built
3Stories
B3Building Class
R6BZoning
2,160 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · Owner of record: M D APARTMENTS LLC · 2,000 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 1 filing · 20 docs
PenthouseUnder Construction32p · 1 filing · 20 docs
Floor 4Under Construction28p · 1 filing · 20 docs
Floor 3Under Construction28p · 1 filing · 20 docs
Floor 2Under Construction29p · 1 filing · 20 docs
Floor 1Under Construction31p · 1 filing · 20 docs
CellarUnder Construction29p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STATELINE BUILDERS303/22/2026
MD APARTMENTS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/15/2025$975K—LMP REAL ESTATE PARTNERS LLC → M D APARTMENTS LLC$451/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC409/10/2026
FL&M ENGINEERING DESIGN &INSPECTION212/30/2025
SH ENGINEERING PLLC409/02/2025
CHOSEN MEP, CORP.206/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATELINE BUILDERS INCGeneral Contractor1007/10/2026
A & H INSTALLATION INCGeneral Contractor407/03/2026
RONEY ELECTRIC INCElectrical103/22/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SH ENGINEERING PLLC7024809/10/2026
Building Lifecycle
All (103)Filed (12)Permit Issued (13)Signed Off (7)Violation (6)Inspection (5)Objection (30)Special Inspection (30)
09/10/2026
Filed — Alteration CO
SUPPORT OF EXCAVATION FILED IN CONJUNCTION TO APPLICATION #B01199859-I1.
B01199859-P2
09/04/2026
Special inspection requirement — Preliminary
Shahriar Rafi
09/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahriar Rafi
09/04/2026
Special inspection requirement — Exterior lighting power
Shahriar Rafi
09/04/2026
Special inspection requirement — Fenestration air leakage
Shahriar Rafi
09/04/2026
Special inspection requirement — Maintenance information
Shahriar Rafi
09/04/2026
Special inspection requirement — Metering
Shahriar Rafi
09/04/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahriar Rafi
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahriar Rafi
09/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahriar Rafi
09/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahriar Rafi
09/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahriar Rafi
09/04/2026
Special inspection requirement — Air barrier - visual inspection
Shahriar Rafi
09/04/2026
Special inspection requirement — Lighting controls
Shahriar Rafi
09/04/2026
Special inspection requirement — Interior lighting power
Shahriar Rafi
09/04/2026
Special inspection requirement — Protection of exposed foundation insulation
Shahriar Rafi
09/04/2026
Special inspection requirement — Insulation placement and R values
Shahriar Rafi
09/04/2026
Special inspection requirement — Fenestration areas
Shahriar Rafi
09/04/2026
Special inspection requirement — Lighting in dwelling units
Shahriar Rafi
08/03/2026
Signed off — Alteration CO
SUPPORT OF EXCAVATION FILED IN CONJUNCTION TO APPLICATION #B01199859-I1.
B01199859-S1
08/03/2026
Signed off — Alteration CO
SUPPORT OF EXCAVATION FILED IN CONJUNCTION TO APPLICATION #B01199859-I1.
B01199859-S3
07/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2026
Signed off — Alteration CO
SUPPORT OF EXCAVATION FILED IN CONJUNCTION TO APPLICATION #B01199859-I1.
B01199859-S2
07/10/2026
Signed off — Alteration CO
SUPPORT OF EXCAVATION FILED IN CONJUNCTION TO APPLICATION #B01199859-I1.
B01199859-S6
07/08/2026
Permit issued — Mechanical Systems
B01199859-S3-MS
07/01/2026
Signed off — Alteration CO
SUPPORT OF EXCAVATION FILED IN CONJUNCTION TO APPLICATION #B01199859-I1.
B01199859-S5
07/01/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01333020-I1
06/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/04/2026
Signed off — Alteration
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01339169-I1
06/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahriar Rafi
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahriar Rafi
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahriar Rafi
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahriar Rafi
06/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahriar Rafi
06/03/2026
Special inspection requirement — Exterior lighting power
Shahriar Rafi
06/03/2026
Special inspection requirement — Fenestration air leakage
Shahriar Rafi
06/03/2026
Special inspection requirement — Preliminary
Shahriar Rafi
06/03/2026
Special inspection requirement — Protection of exposed foundation insulation
Shahriar Rafi
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahriar Rafi
06/03/2026
Special inspection requirement — Lighting controls
Shahriar Rafi
06/03/2026
Special inspection requirement — Fenestration areas
Shahriar Rafi
04/24/2026
Violation issued (ECB, closed)
Construction
04/24/2026
Violation issued (ECB, open)
Construction
02/27/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2026
Filed — Alteration CO
SUPPORT OF EXCAVATION FILED IN CONJUNCTION TO APPLICATION #B01199859-I1.
B01199859-P1
01/27/2026
Violation issued (ECB, closed)
Construction
01/21/2026
Permit issued — General Construction
B01199859-I1-GC
01/21/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/30/2025
Filed — Alteration
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01339169-I1
12/30/2025
Permit issued — Protection and Mechanical Methods
B01339169-I1-PMM
12/17/2025
Permit issued — Sidewalk Shed
B01333020-I1-SH
12/17/2025
Permit issued — Sidewalk Shed
B01333020-I1-SF
12/16/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01333020-I1
12/04/2025
Violation issued (ECB, closed)
Unknown
12/04/2025
Violation issued (ECB, closed)
Unknown
11/24/2025
Permit issued — Plumbing
B01199859-S4-PL
11/24/2025
Permit issued — Earth Work
B01199859-S1-FO-EA
11/24/2025
Permit issued — Sprinklers
B01199859-S4-EW-SP
11/17/2025
Permit issued — General Construction
B01199859-I1-GC
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSTATELINE BUILDERS INC07/08/2026
DOB NOWGeneral ConstructionPermit IssuedSTATELINE BUILDERS INC01/21/2026
DOB NOWProtection and Mechanical MethodsSigned-offA H INSTALLATION12/30/2025
DOB NOWSidewalk ShedSigned-offA H INSTALLATION12/17/2025
DOB NOWSidewalk ShedSigned-offA H INSTALLATION12/17/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC11/24/2025
DOB NOWEarth WorkSigned-offSTATELINE BUILDERS INC11/24/2025
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC11/24/2025
DOB NOWGeneral ConstructionPermit IssuedSTATELINE BUILDERS INC11/17/2025
DOB NOWStructuralSigned-offSTATELINE BUILDERS INC11/10/2025
DOB NOWSupport of ExcavationSigned-offSTATELINE BUILDERS INC11/10/2025
DOB NOWConstruction FenceSigned-offSTATELINE BUILDERS INC09/04/2025
DOB NOWConstruction FenceSigned-offSTATELINE BUILDERS INC07/30/2025
1 project · most recent 09/10/2026
Sprinkler System
FiledStatusContractorScope
09/10/2026Signed-offALL PRO PLBG & HTG INCSprinkler System
1 project · most recent 09/10/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/10/2026Signed-offALL PRO PLBG & HTG INCStorm, Water/Sanitary
2 projects · most recent 11/11/2025
General Wiring
FiledStatusContractorScope
11/11/2025CompleteRONEY ELECTRIC INCGeneral Wiring
07/28/2025Permit IssuedRONEY ELECTRIC INC—
1 project · most recent 09/10/2026
FiledStatusContractorScope
09/10/2026Signed-offSTATELINE BUILDERS INC5 scope_items
1 project · most recent 12/16/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
12/16/2025Signed-offA & H INSTALLATION INCScaffold, Sidewalk Shed
1 project · most recent 09/10/2026
Earthwork
FiledStatusContractorScope
09/10/2026Signed-offSTATELINE BUILDERS INCEarthwork
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/21/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/10/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
09/04/2026Lighting in dwelling unitsShahriar Rafienergy_progress
09/04/2026Fenestration and door U-factor and product ratingsShahriar Rafienergy_progress
09/04/2026MeteringShahriar Rafienergy_progress
09/04/2026Interior lighting powerShahriar Rafienergy_progress
09/04/2026Lighting controlsShahriar Rafienergy_progress
09/04/2026Maintenance informationShahriar Rafienergy_progress
09/04/2026Air barrier - visual inspectionShahriar Rafienergy_progress
09/04/2026Exterior Insulation and Finish Systems (EIFS)Shahriar Rafispecial
09/04/2026Fire-Resistant Penetrations and JointsShahriar Rafispecial
09/04/2026Structural Stability – Alterations of existing buildingsShahriar Rafispecial
09/04/2026Energy Code Compliance InspectionsShahriar Rafiprogress
09/04/2026Fire-Resistance Rated ConstructionShahriar Rafiprogress
09/04/2026PreliminaryShahriar Rafiprogress
09/04/2026Fenestration air leakageShahriar Rafienergy_progress
09/04/2026Exterior lighting powerShahriar Rafienergy_progress
09/04/2026Protection of exposed foundation insulationShahriar Rafienergy_progress
09/04/2026Insulation placement and R valuesShahriar Rafienergy_progress
09/04/2026Fenestration areasShahriar Rafienergy_progress
06/03/2026Structural Stability – Alterations of existing buildingsShahriar Rafispecial
06/03/2026Lighting in dwelling unitsShahriar Rafienergy_progress
06/03/2026MeteringShahriar Rafienergy_progress
06/03/2026Maintenance informationShahriar Rafienergy_progress
06/03/2026Air barrier - visual inspectionShahriar Rafienergy_progress
06/03/2026Insulation placement and R valuesShahriar Rafienergy_progress
06/03/2026Interior lighting powerShahriar Rafienergy_progress
Latest 25 of 91.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/20/2026B01199859-S7Request digital key ↗
08/20/2026B01199859-P1Request digital key ↗
08/20/2026B01199859-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-P1Open ↗
08/13/2026B01199859-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-P1Open ↗
08/13/2026B01199859-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01199859-I1Open ↗
08/13/2026B01199859-P1Open ↗
▸Seals & Professional Certifications44
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026B01199859-P2Open ↗
09/23/2026B01199859-P2Open ↗
09/23/2026B01199859-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026B01199859-P2Open ↗
09/23/2026B01199859-P2Open ↗
09/23/2026B01199859-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/22/2026B01199859-P2Open ↗
08/20/2026B01199859-I1Open ↗
08/19/2026B01339169-I1Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-I1Open ↗
08/13/2026B01199859-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-I1Open ↗
08/13/2026B01199859-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/20/2026B01199859-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/20/2026B01199859-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01199859-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-S6Open ↗
08/13/2026B01199859-I1Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B01199859-S7Open ↗
08/13/2026B01199859-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01199859-S7Open ↗
08/13/2026B01199859-S1Open ↗
▸Other Documents17
▸DOB NOWPlot Diagram6
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-P1Open ↗
08/13/2026B01199859-S6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial3
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-I1Open ↗
08/13/2026B01199859-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-I1Open ↗
08/13/2026B01199859-P1Open ↗
▸DOB NOWProperty Ownership Certification3
09/22/2026B01199859-P2Open ↗
08/13/2026B01199859-I1Open ↗
08/13/2026B01199859-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01199859-S1Open ↗
08/13/2026B01199859-S6Open ↗