← Back
Zoned commercial or Manhattan residential
461 NEW JERSEY AVENUE
BROOKLYN · BIN 3429353
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R6Zoning
0 sfGross Floor Area
0Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: HP NEW PENN HOUSING DEVELOPMENT FUND COM PANY, INC · 2,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction48p · 3 filings · 20 docs
Floor 3Under Construction46p · 2 filings · 20 docs
Floor 2Under Construction48p · 3 filings · 20 docs
Floor 1Under Construction45p · 2 filings · 20 docs
CellarUnder Construction47p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW PENN DEVELOPMENT HDFC1108/31/2026
HP NEW PENN HOUSING DEVELOPMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC706/02/2026
R AND O ENGINEERING. P.C.412/09/2025
JOEL PHAGOO P.E. PLLC208/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC2003/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TECHNOCRAFT INCGeneral Contractor604/09/2026
NATIONWIDE MECHANICAL INCPlumbing607/08/2026
ALEXANDER EUGENEElectrical103/21/2026
VITO INGRAVALLOElectrical103/21/2026
C. JAMES PLBG & HTG INCFire Protection107/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304806/02/2026
STRUCTURES & FOUNDATIONS7714104/24/2025
Building Lifecycle
All (94)Filed (13)Permit Issued (10)Signed Off (3)Inspection (4)Objection (34)Special Inspection (30)
06/09/2026
Permit issued — Sprinklers
B00609814-I1-PL
06/02/2026
Filed — Alteration
New mechanical work with ERV units for intake and exhaust and new heat pump for heating and cooling in conjunction with NB filing 321599301.
B00611448-P2
03/24/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228773-I1
03/23/2026
Permit issued — Mechanical Systems
B00611448-I1-MS
01/29/2026
Signed off — Alteration
Reinforced concrete and steel structure for new building
B00615014-I1
01/12/2026
Permit issued — Plumbing
B00609814-I1-EW-SP
01/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Naeem Anwar
01/09/2026
Special inspection requirement — Structural Steel - Welding
Naeem Anwar
01/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Naeem Anwar
01/09/2026
Special inspection requirement — Final
Naeem Anwar
01/09/2026
Special inspection requirement — Structural Cold-Formed Steel
Naeem Anwar
01/09/2026
Special inspection requirement — Post-installed Anchors
Naeem Anwar
01/09/2026
Special inspection requirement — Structural Steel - Details
Naeem Anwar
12/26/2025
Objection resolved — Addressed
12/25/2025
Objection raised — Other
12/24/2025
Permit issued — Construction Fence
B01135585-I1-FN
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2025
Filed — Alteration
Reinforced concrete and steel structure for new building
B00615014-P2
10/01/2025
Signed off — Alteration
Foundation and Earthwork in conjunction to NB filing 321599301
B00615050-I1
08/20/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228773-P1
07/28/2025
Permit issued — Sprinklers
B00609814-I1-PL
07/18/2025
Permit issued — Sidewalk Shed
B01228773-I1-SH
07/17/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228773-I1
05/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PARAG MEHTA
05/08/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Naeem Anwar
05/08/2025
Special inspection requirement — Sprinkler Systems
Naeem Anwar
05/08/2025
Special inspection requirement — Energy Code Compliance Inspections
PARAG MEHTA
05/07/2025
Special inspection requirement — Subgrade Inspections
Naeem Anwar
05/07/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Naeem Anwar
05/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Naeem Anwar
05/07/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Naeem Anwar
05/07/2025
Special inspection requirement — Concrete - Cast-In-Place
Naeem Anwar
05/07/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Naeem Anwar
05/07/2025
Special inspection requirement — Final
Naeem Anwar
05/07/2025
Special inspection requirement — Footing and Foundation
Naeem Anwar
05/07/2025
Special inspection requirement — Protection of exposed foundation insulation
PARAG MEHTA
05/07/2025
Special inspection requirement — Insulation placement and R values
PARAG MEHTA
04/29/2025
Filed — Alteration
New plumbing and sprinkler at proposed residential building.
B00609814-P2
04/24/2025
Filed — Alteration
Foundation and Earthwork in conjunction to NB filing 321599301
B00615050-P2
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
PARAG MEHTA
04/24/2025
Special inspection requirement — Sprinkler Systems
Naeem Anwar
04/24/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Naeem Anwar
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PARAG MEHTA
04/18/2025
Permit issued — Plumbing
B00609814-I1-PL
01/30/2025
Permit issued — Earth Work
B00615050-I1-FO-EA
01/09/2025
Permit issued — Structural
B00615014-I1-ST
01/03/2025
Permit issued — Construction Fence
B01135585-I1-FN
11/11/2024
Filed — Alteration
Construction fence in conjunction to NB filing 321599301.
B01135585-I1
03/25/2024
Objection raised — Other
03/25/2024
Objection resolved — Addressed
03/25/2024
Objection resolved — Addressed
03/21/2024
Filed — Alteration
New mechanical work with ERV units for intake and exhaust and new heat pump for heating and cooling in conjunction with NB filing 321599301.
B00611448-P1
03/21/2024
Objection raised — Admin
03/15/2024
Filed — Alteration
New plumbing and sprinkler at proposed residential building.
B00609814-P1
03/13/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
03/06/2024
Special inspection requirement — Duct leakage testing, insulation and design
03/06/2024
Special inspection requirement — Ventilation and air distribution system
03/06/2024
Special inspection requirement — Final
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedNATIONWIDE MECHANICAL INC06/09/2026
DOB NOWMechanical SystemsPermit IssuedTECHNOCRAFT INC03/23/2026
DOB NOWPlumbingPermit IssuedC. JAMES PLBG & HTG INC01/12/2026
DOB NOWConstruction FencePermit IssuedTECHNOCRAFT INC12/24/2025
DOB NOWSprinklersPermit IssuedNATIONWIDE MECHANICAL INC07/28/2025
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY07/18/2025
DOB NOWPlumbingPermit IssuedNATIONWIDE MECHANICAL INC04/18/2025
DOB NOWEarth WorkSigned-offTECHNOCRAFT INC01/30/2025
DOB NOWStructuralSigned-offTECHNOCRAFT INC01/09/2025
DOB NOWConstruction FencePermit IssuedTECHNOCRAFT INC01/03/2025
BIS—ISSUEDTECHNOCRAFT INC12/22/2025
BIS—ISSUEDTECHNOCRAFT INC01/08/2025
1 project · most recent 06/02/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Permit IssuedTECHNOCRAFT INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Ice Air RSXC09 10,500 BTU ×20
Ephoca HPAC 2.0 10,500 BTU ×10
Heat / Cool
Cadet CSC101TW 1 kW · Electric Heater ×6
Ventilation
Ventacity Ventacity VS1000 RTe 1,060 CFM · Erv ×3
1 project · most recent 04/29/2025
FiledStatusContractorScope
04/29/2025Permit IssuedC. JAMES PLBG & HTG INC41 heads
1 project · most recent 04/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
04/29/2025Permit IssuedNATIONWIDE MECHANICAL INCStorm, Water/Sanitary
3 projects · most recent 04/03/2026
General Wiring
FiledStatusContractorScope
04/03/2026Permit IssuedL J ELEC'L SERV. INC.—
09/29/2025CompleteHIGH QUALITY ELEC.OF NYC—
08/21/2025Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
2 projects · most recent 08/20/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
08/20/2025Signed-offAKM CONSTRUCTION NY CORPScaffold, Sidewalk Shed
11/11/2024Permit IssuedTECHNOCRAFT INCFence
1 project · most recent 08/20/2025
Sidewalk Shed Removal
FiledStatusContractorScope
08/20/2025Signed-offAKM CONSTRUCTION NY CORPSidewalk Shed Removal
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
01/09/2026Structural Stability – Alterations of existing buildingsNaeem Anwarspecial
01/09/2026Structural Steel - WeldingNaeem Anwarspecial
01/09/2026Structural Steel - High Strength BoltingNaeem Anwarspecial
01/09/2026FinalNaeem Anwarprogress
01/09/2026Structural Cold-Formed SteelNaeem Anwarspecial
01/09/2026Post-installed AnchorsNaeem Anwarspecial
01/09/2026Structural Steel - DetailsNaeem Anwarspecial
05/08/2025HVAC-R and service water piping design and insulationPARAG MEHTAenergy_progress
05/08/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesNaeem Anwarspecial
05/08/2025Sprinkler SystemsNaeem Anwarspecial
05/08/2025Energy Code Compliance InspectionsPARAG MEHTAprogress
05/07/2025Subgrade InspectionsNaeem Anwarspecial
05/07/2025Subsurface Investigations (Borings/Test Pits)Naeem Anwarspecial
05/07/2025Structural Stability – Alterations of existing buildingsNaeem Anwarspecial
05/07/2025Subsurface Conditions – Fill Placement & In-Place DensityNaeem Anwarspecial
05/07/2025Concrete - Cast-In-PlaceNaeem Anwarspecial
05/07/2025Excavations - Sheeting, Shoring, and BracingNaeem Anwarspecial
05/07/2025FinalNaeem Anwarprogress
05/07/2025Footing and FoundationNaeem Anwarprogress
05/07/2025Protection of exposed foundation insulationPARAG MEHTAenergy_progress
05/07/2025Insulation placement and R valuesPARAG MEHTAenergy_progress
04/24/2025Energy Code Compliance InspectionsPARAG MEHTAprogress
04/24/2025Sprinkler SystemsNaeem Anwarspecial
04/24/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesNaeem Anwarspecial
04/24/2025HVAC-R and service water piping design and insulationPARAG MEHTAenergy_progress
Latest 25 of 36.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/30/2026B00615050-P2Request digital key ↗
08/30/2026B00615014-I1Request digital key ↗
08/25/2026B00609814-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
05/22/2025321599301Open ↗
04/23/2025321599301Open ↗
08/28/2024321599301Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
06/22/2022340829535Open ↗
▸BISWORK PERMIT APPLICATION1
01/09/2025321599301Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM3
05/16/2025321599301Open ↗
09/13/2024321599301Open ↗
03/30/2022321599301Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/30/2022321599301Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature16
08/27/2026B00615050-I1Open ↗
08/27/2026B00615050-I1Open ↗
08/27/2026B00615050-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/23/2026B01135585-I1Open ↗
08/21/2026B01228773-I1Open ↗
08/16/2026B00611448-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026B00615050-I1Open ↗
08/27/2026B00615050-I1Open ↗
08/27/2026B00615050-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/22/2022340829535Open ↗
▸Trade Schedules & Equipment1
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
03/30/2022321599301Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
06/22/2022340829535Open ↗
03/30/2022321599301Open ↗
▸BISSTREET TREE CHECKLIST2
06/22/2022340829535Open ↗
03/30/2022321599301Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/09/2025321599301Open ↗
03/30/2022321599301Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/30/2025321599301Open ↗
10/30/2025321599301Open ↗
10/30/2025321599301Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026B00615050-P2Open ↗
08/13/2026B00615050-I1Open ↗
▸BISSOIL REPORT1
03/30/2022321599301Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/30/2025321599301Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
01/09/2025321599301Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
01/09/2025321599301Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00615050-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/16/2026B00611448-P2Open ↗
08/13/2026B01135585-I1Open ↗
08/13/2026B00611448-I1Open ↗
Showing 3 of 11 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
06/22/2022340829535Open ↗
03/30/2022321599301Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/30/2022321599301Open ↗
03/30/2022321599301Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
01/09/2025321599301Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION6
05/16/2025321599301Open ↗
09/13/2024321599301Open ↗
06/22/2022340829535Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/22/2022340829535Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/22/2022340829535Open ↗
▸Other Documents6
▸DOB NOWHydraulic Calculations3
08/13/2026B00609814-P2Open ↗
08/13/2026B00609814-P1Open ↗
08/13/2026B00609814-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/22/2022340829535Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/30/2022321599301Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00615050-I1Open ↗