QUEENS
4610 70 STREET
QUEENS · BIN 4623447
💬 Discuss this project
—Year Built
—Stories
—Building Class
R7XZoning
—Gross Floor Area
—Units
3 Open Violations ▸
29,504 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
Roof7p · 6 filings · 20 docs
Floor 124p · 2 filings · 5 docs
Floor 114p · 1 filing · 3 docs
Floor 103p · 1 filing · 3 docs
Floor 92p · 1 filing · 3 docs
Floor 82p · 1 filing · 3 docs
Floor 72p · 1 filing · 3 docs
Floor 62p · 1 filing · 3 docs
Floor 5Under Construction31p · 3 filings · 20 docs
Floor 4Under Construction33p · 5 filings · 20 docs
Floor 3Under Construction35p · 6 filings · 20 docs
Floor 2Under Construction35p · 5 filings · 20 docs
Floor 1Under Construction35p · 6 filings · 20 docs
CellarUnder Construction33p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MADISON REALTY CAPITAL2808/06/2026
OWNERS REP2007/08/2026
BARONE STEEL INC903/22/2026
OMNIBUILD CONSTRUCTION2103/22/2026
NYCSCA103/22/2026
QB DEVELOPMENT OWNER3403/21/2026
70 47TH QUEENS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor2207/08/2026
OMNIBUILD CONSTRUCTION INGeneral Contractor708/06/2026
NAVILLUS TILE INCGeneral Contractor704/09/2026
BARONE STEEL INCGeneral Contractor403/21/2026
PRIME STRUCTURE INCGeneral Contractor407/08/2026
PAR PLUMBING CO., INCPlumbing409/23/2026
A & F FIRE PROTECTION COFire Protection307/08/2026
MONCON INCGeneral Contractor307/08/2026
M & A PROJECTS INCGeneral Contractor203/21/2026
STREAM PLUMBING INCPlumbing106/28/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
CHAMP PLUMBING & HTG CORPPlumbing106/28/2026
SELECTRIC ELECL CONT CO IElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4002506/15/2026
SHAHRISH SHUVO ENGINEERIN8524104/16/2025
MCNAMARA/SALVIA OF NEW YO4970103/26/2024
PSI AGENCY INC.254103/26/2024
20/20 INSPECTIONS INC1471203/14/2022
Building Lifecycle
All (200)Filed (51)Permit Issued (37)Signed Off (14)Violation (34)Inspection (24)Objection (10)Special Inspection (30)
09/22/2026
Permit issued — Plumbing
Q00639414-I1-PL
08/21/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/19/2026
Objection resolved — Resolved
08/13/2026
Objection raised — Cost
08/10/2026
Violation issued (HPD, open)
A
08/10/2026
Violation issued (HPD, open)
A
08/05/2026
Permit issued — Structural
Q01024997-I1-ST
08/03/2026
Filed — Alteration
Installation of fire rated wall in garage. No change in use, egress or occupancy
Q01434815-I1
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/22/2026
Special inspection requirement — Final
07/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/16/2026
Special inspection requirement — Sprayed fire-resistant materials
NELSON LOPEZ
06/16/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
NELSON LOPEZ
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
06/16/2026
Special inspection requirement — Masonry
NELSON LOPEZ
06/16/2026
Special inspection requirement — Interior lighting power
NELSON LOPEZ
06/16/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
06/16/2026
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
06/16/2026
Special inspection requirement — Ventilation and air distribution system
NELSON LOPEZ
06/16/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
06/16/2026
Special inspection requirement — Lighting controls
NELSON LOPEZ
06/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
06/16/2026
Special inspection requirement — Electrical motors and elevators
NELSON LOPEZ
06/16/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
06/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
NELSON LOPEZ
06/16/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
06/16/2026
Special inspection requirement — Metering
NELSON LOPEZ
06/16/2026
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
06/16/2026
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
06/16/2026
Special inspection requirement — Final
NELSON LOPEZ
06/16/2026
Special inspection requirement — Heating Systems
NELSON LOPEZ
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
06/16/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
06/16/2026
Special inspection requirement — Luminous Exit Path Markings
NELSON LOPEZ
06/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
06/15/2026
Filed — Alteration
Connect to existing building water connection with new dedicated meter for water distribution. Connect new sanitary to existing sanitary lines. Distribute hot water from cellar hot water heater. Run gas to boiler plant on main building roof.
Q00639414-P6
06/15/2026
Filed — Alteration
Herewith filing ST work type for tenant fit-out
Q00639385-P6
06/11/2026
Filed — Alteration
Connect to existing building water connection with new dedicated meter for water distribution. Connect new sanitary to existing sanitary lines. Distribute hot water from cellar hot water heater. Run gas to boiler plant on main building roof.
Q00639414-P5
06/10/2026
Filed — Alteration
Redistribution of heating, cooling and ventilation from AHU and boiler system.
Q00639404-P4
06/02/2026
Filed — Alteration
Redistribution of sprinkler coverage from the existing floor control assemblies located in existing stairwell.
Q00640021-P2
04/22/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/07/2026
Filed — Alteration
Redistribution of heating, cooling and ventilation from AHU and boiler system.
Q00639404-P3
04/07/2026
Filed — Alteration
New Condensing Boiler Hot water plant with pumped distribution
Q00640043-P3
02/06/2026
Violation issued (HPD, open)
B
01/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/30/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/26/2026
Permit issued — Boiler Equipment
Q00640043-I1-BE
01/20/2026
Filed — Alteration
Connect to existing building water connection with new dedicated meter for water distribution. Connect new sanitary to existing sanitary lines. Distribute hot water from cellar hot water heater. Run gas to boiler plant on main building roof.
Q00639414-P4
01/12/2026
Filed — Alteration
New Condensing Boiler Hot water plant with pumped distribution
Q00640043-P2
01/02/2026
Permit issued — Mechanical Systems
Q00639404-I1-MS
12/23/2025
Permit issued — General Construction
Q00639385-I1-GC
12/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/22/2025
Permit issued — Plumbing
Q00639414-I1-PL
10/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/15/2025
Permit issued — Sprinklers
Q00640021-I1-EW-SP
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC09/22/2026
DOB NOWStructuralPermit IssuedOMNIBUILD CONSTRUCTION IN08/05/2026
DOB NOWBoiler EquipmentSigned-offCHAMP PLUMBING & HTG CORP01/26/2026
DOB NOWMechanical SystemsSigned-offNAVILLUS TILE INC01/02/2026
DOB NOWGeneral ConstructionSigned-offNAVILLUS TILE INC12/23/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC10/22/2025
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC10/15/2025
DOB NOWStructuralSigned-offNAVILLUS TILE INC08/25/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC06/25/2025
DOB NOWPlumbingPermit IssuedSTREAM PLUMBING INC06/16/2025
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC02/06/2025
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC09/05/2024
DOB NOWMechanical SystemsSigned-offNAVILLUS TILE INC07/31/2024
DOB NOWGeneral ConstructionSigned-offNAVILLUS TILE INC07/31/2024
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC07/25/2024
DOB NOWStructuralPermit IssuedOMNIBUILD CONSTRUCTION IN05/06/2024
DOB NOWGeneral ConstructionSigned-offOMNIBUILD CONSTRUCTION IN03/28/2023
DOB NOWMechanical SystemsSigned-offOMNIBUILD CONSTRUCTION IN11/07/2022
DOB NOWProtection and Mechanical MethodsSigned-offBARONE STEEL10/18/2022
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC10/11/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/17/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offBARONE STEEL06/14/2022
DOB NOWBoiler EquipmentSigned-offPALLADINO HEATING SVC INC.05/31/2022
DOB NOWProtection and Mechanical MethodsSigned-offPRIME STRUCTURE INC05/12/2022
DOB NOWSupported ScaffoldSigned-offM & A PROJECTS INC04/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offPRIME STRUCTURE INC01/10/2022
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC10/18/2021
DOB NOWConstruction FenceSigned-offMONCON INC10/15/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/31/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/26/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/19/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/23/2021
DOB NOWConstruction FenceSigned-offMONCON INC04/07/2021
DOB NOWConstruction FenceSigned-offMONCON INC12/16/2020
BIS—ISSUEDOMNIBUILD CONSTRUCTION IN05/24/2023
BISPLISSUEDMPS PLUMBING & HEATING INC12/05/2022
BISSDISSUEDMPS PLUMBING & HEATING INC08/02/2022
+ 16 more permits on file
1 project · most recent 06/10/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2026Signed-offNAVILLUS TILE INCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Refrigeration Systems
Cooling
Arctic Chill PACVMV0300D3-MM 2,592,000 BTU · Chiller ×3
Annexair AHU-I-07-H-C-TB 72,000 CFM ×1
ERP-I-07-EW03-H-C-TB 72,000 CFM ×1
ERP-I-07-H-C-SW05-TB 7,200 CFM ×1
ERP-I-09-H-C-SW-TB 9,600 CFM ×1
ERP-I-25-H-C-SW20-TB 25,000 CFM ×1
Heat / Cool
Mitsubishi Electric PKA-A36KA7 38,000 BTU · Fan Coil Indoor ×9
PKA-A12HA7 14,000 BTU · Split System ×6
PKA-A30KA7 34,000 BTU · Vrf Indoor ×3
Lg ARNU363SVA4 37,000 BTU · Vrf Indoor ×3
ARNU123SJS4 13,600 BTU · Vrf Indoor ×2
ARNU303SVA4 32,000 BTU · Vrf Indoor ×1
ARUM168BTE5 189,000 BTU · Vrf Outdoor ×1
Heating
Aerco BMK 3000 3,000,000 BTU · Boiler ×2
Lochinvar FBN3001/2212 128823301 3,000,000 BTU · Boiler ×2
FBN3001/2212 128823303 3,000,000 BTU · Boiler ×2
FBN3001 3,000,000 BTU · Boiler ×2
Ventilation
— SQ-97-VG 450 CFM · Exhaust Fan ×9
AX-275-0910 12,900 CFM · Exhaust Fan ×3
AX-90-275-0910 12,410 CFM · Exhaust Fan ×3
AX-90-400-0922 24,000 CFM · Exhaust Fan ×3
AX-90-400-0927 28,000 CFM · Exhaust Fan ×3
CSP-A1750 700 CFM · Exhaust Fan ×3
CSP-A390 250 CFM · Exhaust Fan ×3
CSP-A390-VG 150 CFM · Exhaust Fan ×3
CSP-B110 70 CFM · Exhaust Fan ×3
SQ-120-VG 1,110 CFM · Exhaust Fan ×2
SQ-130HP-VG 560 CFM · Exhaust Fan ×2
SQ-160HP-VG 1,470 CFM · Exhaust Fan ×2
AX-54-190-0413 6,740 CFM · Exhaust Fan ×1
BSQ-140HP 1,200 CFM · Exhaust Fan ×1
BSQ-180 3,080 CFM · Exhaust Fan ×1
Greenheck AX-54-190-0413 6,740 CFM · Exhaust Fan ×2
BSQ-140HP 1,200 CFM · Exhaust Fan ×2
BSQ-180 3,080 CFM · Exhaust Fan ×2
SQ-160-A 2,230 CFM · Exhaust Fan ×2
CSP-A390-VG-QD 150 CFM · Exhaust Fan ×1
USF-13-5-B1-00-01-01 1,950 CFM · Exhaust Fan ×1
Twin City Fan DSI-100AE 450 CFM · Exhaust Fan ×4
DSI-135AE 560 CFM · Exhaust Fan ×2
ATAD-050A3 6,740 CFM · Exhaust Fan ×1
ATAD-112A3 24,000 CFM · Exhaust Fan ×1
DSI-100A 700 CFM · Exhaust Fan ×1
DSI-120AE 1,110 CFM · Exhaust Fan ×1
DSI-150ANE 1,470 CFM · Exhaust Fan ×1
DSI-165ANE 2,230 CFM · Exhaust Fan ×1
QSL-365 28,000 CFM · Exhaust Fan ×1
TCVX-28B7 12,410 CFM · Exhaust Fan ×1
TCVX-32D4 12,900 CFM · Exhaust Fan ×1
TL-150S 70 CFM · Exhaust Fan ×1
Loren Cook 150QMXH150QMXL2 3,100 CFM · Exhaust Fan ×1
90QMXH90QMXL2 1,200 CFM · Exhaust Fan ×1
Trion GREASE VIPER-22123 1,950 CFM · Exhaust Fan ×1
Refrigeration
Arctic PACVMV0300D3-MM-FC 2,520,000 BTU · Chiller ×1
2 projects · most recent 06/02/2026
FiledStatusContractorScope
06/02/2026Signed-offA & F FIRE PROTECTION CO876 heads
08/07/2025——5 outlets
2 projects · most recent 06/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/15/2026Permit IssuedPAR PLUMBING CO., INCGas, Water/Sanitary
04/16/2025Permit IssuedSTREAM PLUMBING INCGas
7 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedSELECTRIC ELECL CONT CO IGeneral Wiring
01/05/2023CompleteRIGHT AWAY ELECTRIC LLCGeneral Wiring
08/02/2022CompleteSOLAS ELECTRICAL CORP—
08/02/2022CompleteSOLAS ELECTRICAL CORP—
04/04/2022CompleteJAM ELECTRICAL CORP—
08/31/2021CompleteV. VASS ELECTRIC CORP—
09/07/2020CompleteV. VASS ELECTRIC CORP—
2 projects · most recent 08/03/2026
Steel
FiledStatusContractorScope
08/03/2026——1 scope_items
06/15/2026Signed-offNAVILLUS TILE INCSteel
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
08/21/2026Pass-Final PL - UndergroundPassView ↗
07/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/22/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
12/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
02/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/24/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
02/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/18/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
12/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
07/28/2026Tenant Protection Plan Compliance—special
07/22/2026Final—progress
07/22/2026Fire-Resistance Rated Construction—progress
06/16/2026Heating SystemsNELSON LOPEZspecial
06/16/2026Post-installed AnchorsNELSON LOPEZspecial
06/16/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
06/16/2026Mechanical SystemsNELSON LOPEZspecial
06/16/2026FinalNELSON LOPEZprogress
06/16/2026Interior lighting powerNELSON LOPEZenergy_progress
06/16/2026Duct leakage testing, insulation and designNELSON LOPEZenergy_progress
06/16/2026MeteringNELSON LOPEZenergy_progress
06/16/2026Shutoff dampersNELSON LOPEZenergy_progress
06/16/2026Ventilation and air distribution systemNELSON LOPEZenergy_progress
06/16/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
06/16/2026Lighting controlsNELSON LOPEZenergy_progress
06/16/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
06/16/2026HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
06/16/2026Electrical motors and elevatorsNELSON LOPEZenergy_progress
06/16/2026Maintenance informationNELSON LOPEZenergy_progress
06/16/2026Sprinkler SystemsNELSON LOPEZspecial
06/16/2026Post-installed AnchorsNELSON LOPEZspecial
06/16/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
06/16/2026Post-installed AnchorsNELSON LOPEZspecial
06/16/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
06/16/2026Mastic and Intumescent Fire-resistant CoatingsNELSON LOPEZspecial
Latest 25 of 123.
▾Documents — 526 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch41
08/28/2026Q00087107-I1Request digital key ↗
08/27/2026Q00562441-I1Request digital key ↗
08/27/2026Q00579170-I1Request digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/26/2026Q00388277-I1Request digital key ↗
08/15/2026Q00388277-P1Request digital key ↗
08/15/2026Q00388277-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/19/2026Q00974519-P1Request digital key ↗
08/19/2026Q00974519-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00474188-I1Request digital key ↗
▸Applications & Permits79
▸BISPLAN / WORK APPROVAL APPLICATION58
12/04/2023420665952Open ↗
11/20/2023420665952Open ↗
11/16/2023420665952Open ↗
Showing 3 of 58 on file for this type
▸BISWORK PERMIT APPLICATION14
06/21/2022420665952Open ↗
05/27/2022440715825Open ↗
04/14/2022420665952Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
12/08/2022440570295Open ↗
10/19/2021440570295Open ↗
Showing 2 of 3 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
09/15/2021440570295Open ↗
09/15/2021440570295Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/06/2021420665952Open ↗
▸BISHPD: PERMIT NOTICE1
11/15/2021420665952Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
12/14/2021421792643Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications103
▸DOB NOWDPL-1: Design Professional Seal & Signature47
08/28/2026Q00087107-I1Open ↗
08/27/2026Q00579170-I1Open ↗
08/26/2026Q00388277-P2Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/23/2026Q00547930-I1Open ↗
09/18/2026Q00640043-P3Open ↗
09/01/2026Q00639404-P4Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026Q00974592-P1Open ↗
09/01/2026Q00639404-P4Open ↗
09/01/2026Q00639404-P4Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/11/2022420665952Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/19/2022440715825Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING22
11/20/2023420665952Open ↗
11/16/2023420665952Open ↗
03/14/2023440553713Open ↗
Showing 3 of 22 on file for this type
▸BISSTANDPIPE SYSTEMS2
03/09/2023440553704Open ↗
03/09/2023440553722Open ↗
▸BISHEATING SYSTEMS1
04/06/2023420665952Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
12/19/2025420665952Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/09/2023420665952Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREES SITE PLAN2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/20/2022420665952Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos20
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION6
08/01/2024440570295Open ↗
07/17/2023440553713Open ↗
07/17/2023440553722Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice to Proceed6
08/13/2026Q00639404-I1Open ↗
08/13/2026Q00694887-I1Open ↗
08/13/2026Q00547930-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
05/19/2022440715825Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/20/2026Q00639385-I1Open ↗
08/13/2026Q00640043-I1Open ↗
08/13/2026Q08025016-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
01/05/2023420665952Open ↗
01/05/2023420665952Open ↗
11/11/2021420665952Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/12/2023420665952Open ↗
05/02/2022440553740Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/11/2022420665952Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERIOR LIGHTING POWER1
03/01/2023420665952Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/11/2023420665952Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/10/2023420665952Open ↗
▸BISINTERIOR LIGHTING POWER1
03/09/2023420665952Open ↗
▸Inspections & Test Reports45
▸BISTECHNICAL REPORT: RESPONSIBILITY27
04/11/2023420665952Open ↗
02/08/2023420665952Open ↗
12/27/2022420665952Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
03/25/2022420665952Open ↗
03/07/2022420665952Open ↗
09/27/2021420665952Open ↗
Showing 3 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
08/31/2021440553713Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
02/09/2023420665952Open ↗
Showing 1 of 2 on file for this type
▸BISHYDRO FLOW TEST LETTER2
08/31/2021440553713Open ↗
Showing 1 of 2 on file for this type
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
01/20/2022420665952Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/08/2023420665952Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
03/22/2022420665952Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
02/16/2023420665952Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/29/2021420665952Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/14/2023420665952Open ↗
▸Approvals, Objections & Sign-offs33
▸BISSCHEDULE A - OCCUPANCY / USE11
12/04/2023420665952Open ↗
10/25/2022420665952Open ↗
09/29/2021420665952Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
10/24/2025440553704Open ↗
10/05/2023440553713Open ↗
07/25/2023440553740Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER6
04/14/2022420665952Open ↗
04/05/2022420665952Open ↗
10/13/2021420665952Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL4
03/27/2023440553713Open ↗
03/14/2023440553722Open ↗
03/14/2023440553704Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/19/2026Q00974519-I1Open ↗
08/19/2026Q00974519-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/30/2021421792643Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT (FINAL): PW35
10/04/2023440553713Open ↗
07/24/2023440553740Open ↗
07/17/2023440553722Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT2
05/19/2022440715825Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms64
▸BISADDITIONAL INFORMATION46
04/27/2023420665952Open ↗
04/18/2023420665952Open ↗
03/24/2023420665952Open ↗
Showing 3 of 46 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
05/19/2022440715825Open ↗
Showing 1 of 7 on file for this type
▸BISEFILING COVER SHEET6
09/30/2021421792643Open ↗
Showing 1 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
06/21/2022420665952Open ↗
04/14/2022420665952Open ↗
04/05/2022420665952Open ↗
Showing 3 of 5 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
12/14/2021421792643Open ↗
12/14/2021421792643Open ↗
12/14/2021421792643Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll4
08/13/2026Q00974592-P1Open ↗
08/13/2026Q00974585-I1Open ↗
08/13/2026Q00974585-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
12/14/2021421792643Open ↗
Showing 1 of 2 on file for this type
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
03/10/2023420665952Open ↗
▸BISPRELIMINARY1
12/01/2022420665952Open ↗
▸BISLUMINOUS EGRESS PATH MARKINGS1
04/06/2023420665952Open ↗
▸BISSupporting Document: Fee Exempt1
05/05/2023440715825Open ↗
▸BISSHUTOFF DAMPERS1
03/09/2023420665952Open ↗