1958Year Built
4Stories
O5Building Class
M1-2Zoning
25,256 sfGross Floor Area
29Units
LL97 Covered7 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 462 36 STREET LLC · 10,294 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
Equipment
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRAC607/08/2026
OWNERS REP1107/08/2026
NICHE WATERPROOFING LLC503/22/2026
462 36 STREET2403/22/2026
SLOPE OFFICES LLC203/22/2026
WJP BUILDERS103/22/2026
46 36TH STREET LLC103/22/2026
ABAEMA REALTY LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/16/2016$8.0M—SLOPE OFFICES LLC → 462 36 STREET LLC$318/sf building
12/19/2013$7.0M—ABAEMA REALTY LLC → SLOPE OFFICES LLC$277/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION110/20/2023
RISE ARCHITECTURE108/01/2023
NORMAN C. LOK, PE106/05/2023
BAILEYS ENGINEERING PC112/04/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
THE GREEN STUDIO103/21/2026
JACK JAFFA & ASSOCIATES203/21/2026
LOUIS STRIAR203/21/2026
HIERARCH-E203/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICHE WATERPROOFING LLCGeneral Contractor407/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor407/08/2026
GWT ENTERPRISES INCGeneral Contractor303/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor303/21/2026
ALVA ELECTRICAL, INC.Electrical103/22/2026
CITY SIGNSScaffold107/08/2026
DOWNEY, CONORElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
STANISLAV UMANSKIYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROCK ARCH ENG CORP7831103/19/2024
BIZ DESIGNS LLC6312108/01/2023
Building Lifecycle
All (87)Filed (5)Permit Issued (8)Signed Off (4)Violation (60)Objection (6)Special Inspection (4)
01/08/2026
Violation issued (FDNY_NOV, closed)
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2024
Violation issued (ECB, closed)
Construction
10/30/2024
Signed off — Alteration
Removal of existing panels to install waterproofing membrane
B00910211-I1
09/11/2024
Signed off — Alteration
B00949111-I1
05/29/2024
Permit issued — General Construction
B00910211-I1-GC
04/02/2024
Permit issued — Suspended Scaffold
B01019234-I1-SC
03/19/2024
Filed — Alteration
B01019234-I1
01/09/2024
Permit issued — Sidewalk Shed
B00949111-I1-SH
12/22/2023
Permit issued — General Construction
B00910211-I1-GC
11/13/2023
Permit issued — Sidewalk Shed
B00949111-I1-SH
11/01/2023
Objection resolved — Addressed
10/20/2023
Filed — Alteration
B00949111-I1
10/10/2023
Objection resolved — Addressed
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2023
Objection resolved — Addressed
08/23/2023
Signed off — Alteration
B00882102-I1
08/07/2023
Objection raised — Other
08/07/2023
Objection raised — Inspections
08/07/2023
Objection raised — Scope
08/01/2023
Filed — Alteration
Removal of existing panels to install waterproofing membrane
B00910211-I1
08/01/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Jeff Akerman
08/01/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Jeff Akerman
07/26/2023
Special inspection requirement — Final
SHIMON GREENEBAUM
06/21/2023
Permit issued — Sign
B00882102-I1-SG
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2023
Filed — Alteration
B00882102-I1
05/24/2023
Violation issued (ECB, open)
Construction
05/24/2023
Violation issued (ECB, closed)
Construction
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/24/2021
Violation issued (ECB, closed)
Elevators
12/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2019
Violation issued (ECB, closed)
Construction
12/11/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/30/2018
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00003200-I1
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNICHE WATERPROOFING LLC05/29/2024
DOB NOWSuspended ScaffoldPermit IssuedJC SANTANA CONTRACTING CO04/02/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWGeneral ConstructionSigned-offNICHE WATERPROOFING LLC12/22/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES11/13/2023
DOB NOWSignSigned-offELMER DAWSON06/21/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/09/2018
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/04/2017
BISMHISSUEDGLOBAL HOME IMPROVEMENTS12/02/2019
BISOTISSUEDGLOBAL HOME IMPROVEMENTS11/29/2019
BISPLISSUEDP.H. WORKS INC01/05/2018
BISMHISSUEDGLOBAL HOME IMPROVEMENTS12/21/2017
BISOTISSUEDGLOBAL HOME IMPROVEMENTS10/03/2017
BISOTISSUEDGLOBAL HOME IMPROVEMENTS10/03/2017
BISOTISSUEDGLOBAL HOME IMPROVEMENTS10/03/2017
BISEQISSUEDGLOBAL HOME IMPROVEMENTS08/31/2017
BISOTISSUEDGLOBAL HOME IMPROVEMENTS08/31/2017
BISPLISSUEDM & M PIPING AND HEATING08/16/2017
BISOTISSUEDGLOBAL HOME IMPROVEMENTS08/03/2017
BISMHISSUEDGLOBAL HOME IMPROVEMENTS07/27/2017
BISEQISSUEDGLOBAL HOME IMPROVEMENTS11/28/2016
BISOTISSUEDGLOBAL HOME IMPROVEMENTS11/28/2016
BISCCISSUEDJ.S. RESTORATION USA INC05/18/2009
BISCCISSUEDJ.S. RESTORATION USA INC05/18/2009
BISBLISSUEDCATMAN PLUMBING INC03/26/2009
BISSPISSUEDFULL CAPACITY FIRE CORP03/09/2009
BISPLISSUEDCATMAN PLUMBING INC12/23/2008
BISPLISSUEDCITY-WIDE MECHANICAL INC10/21/2008
BISEQRE-ISSUEDOSMAR ENTERPRISES07/07/2008
BISSPISSUEDFULL CAPACITY FIRE CORP01/31/2008
BISPLISSUEDCITY-WIDE MECHANICAL INC10/25/2007
BISEQISSUEDCROSS ATLANTIC INC10/17/2007
BISEQISSUEDCOMPLETE CONCRETE CORP.08/22/2007
BIS—ISSUEDCOMPLETE CONCRETE CORP08/22/2007
BISEQISSUEDCSC07/24/2007
BISEQISSUEDCOMPLETE CONCRETE CORP.03/09/2007
BISPLISSUEDCITY-WIDE MECHANICAL INC08/22/2006
BISEQISSUEDCOMPLETE CONCRETE CORP.08/11/2006
BIS—ISSUEDCOMPLETE CONCRETE CORP08/11/2006
BIS—ISSUEDCOMPLETE CONCRETE CORP06/14/2006
+ 2 more permits on file
4 projects · most recent 10/20/2023
General Wiring
FiledStatusContractorScope
10/20/2023CompleteSOLAS ELECTRICAL CORP—
06/08/2023CompleteSHELBY ELECTRICAL CORP—
05/02/2023Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
05/20/2019Permit IssuedALVA ELECTRICAL, INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/01/2023Exterior Insulation and Finish Systems (EIFS)Jeff Akermanspecial
08/01/2023Wall Panels, Curtain Walls, and VeneersJeff Akermanspecial
07/26/2023FinalSHIMON GREENEBAUMprogress
11/29/2017FinalPAUL BAILEYprogress
▾Documents — 217 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026B00003200-I1Request digital key ↗
08/27/2026B00882102-I1Request digital key ↗
08/26/2026B00949111-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION24
11/27/2019321957628Open ↗
05/30/2019321952188Open ↗
04/23/2019321957628Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION22
12/03/2019321957628Open ↗
11/29/2019321957628Open ↗
11/29/2019321957628Open ↗
Showing 3 of 22 on file for this type
▸Seals & Professional Certifications38
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
11/29/2019321957628Open ↗
11/29/2019321957628Open ↗
06/04/2019321952188Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/30/2019321952188Open ↗
11/20/2017340561779Open ↗
08/14/2017340532445Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
11/20/2017340561779Open ↗
08/14/2017340532445Open ↗
07/24/2017340525140Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/20/2017340561779Open ↗
08/14/2017340532445Open ↗
07/24/2017340525140Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/30/2019321952188Open ↗
12/06/2007310016041Open ↗
10/12/2007310035921Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/03/2026B00003200-I1Open ↗
08/27/2026B00882102-I1Open ↗
08/13/2026B00949111-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/06/2007310016041Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00003200-I1Open ↗
08/29/2026B00910211-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B00910211-I1Open ↗
08/29/2026B00910211-I1Open ↗
▸BISPC FULL REPORT1
12/06/2007310016041Open ↗
▸Trade Schedules & Equipment38
▸BISEQUIPMENT USE APPLICATION/PERMIT8
10/01/2018340561779Open ↗
10/01/2018340561779Open ↗
10/01/2018340561779Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING6
01/25/2018340561779Open ↗
11/20/2017340561779Open ↗
10/06/2017340525140Open ↗
Showing 3 of 6 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B5
11/20/2009310016041Open ↗
11/20/2009310016041Open ↗
11/10/2009310016041Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
04/23/2019321957628Open ↗
02/02/2018340561779Open ↗
01/25/2018321507268Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
11/23/2009310016041Open ↗
11/20/2009310016041Open ↗
11/19/2009310016041Open ↗
Showing 3 of 4 on file for this type
▸BISWATER METER PERMIT : DEP-METER4
11/19/2009310016041Open ↗
11/19/2009310016041Open ↗
11/10/2009310016041Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
11/20/2009310016041Open ↗
11/20/2009310016041Open ↗
11/20/2009310016041Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
04/28/2009310290770Open ↗
04/28/2009310290770Open ↗
02/10/2009310290770Open ↗
▸BISEQUIPMENT USE PERMITS1
10/01/2018340561779Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
01/25/2018321507268Open ↗
▸BISTenant Protection Plan and Notes1
04/23/2019321957628Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
11/29/2019321957628Open ↗
11/27/2019321957628Open ↗
05/30/2019321952188Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
02/10/2009310290770Open ↗
08/08/2008310177992Open ↗
07/16/2008310162971Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/06/2007310016041Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/03/2026B00003200-I1Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/29/2019321957628Open ↗
06/04/2019321952188Open ↗
05/30/2019321952188Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
11/20/2017340561779Open ↗
08/31/2017340532445Open ↗
08/14/2017340532445Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
11/20/2017340561779Open ↗
08/14/2017340532445Open ↗
07/24/2017340525140Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
09/21/2018340561779Open ↗
07/31/2018340525140Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/20/2017340561779Open ↗
08/31/2017340532445Open ↗
08/14/2017340532445Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/21/2018340561779Open ↗
07/31/2018340525140Open ↗
09/15/2009310162971Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
02/10/2009310290770Open ↗
08/08/2008310177992Open ↗
07/16/2008310162971Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
02/14/2018321507268Open ↗
01/25/2018321507268Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE2
11/19/2009310016041Open ↗
11/10/2009310016041Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
05/30/2019321952188Open ↗
04/23/2019321957628Open ↗
09/21/2018340561779Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION7
02/02/2018340561779Open ↗
02/01/2018340532445Open ↗
01/10/2018340532445Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
05/30/2019321952188Open ↗
04/23/2019321957628Open ↗
01/25/2018321507268Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/20/2017340561779Open ↗
08/14/2017340532445Open ↗
07/24/2017340525140Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
09/21/2018340561779Open ↗
03/15/2018340525140Open ↗
▸Other Documents5
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/26/2019321957628Open ↗
08/31/2017340532445Open ↗
▸BISPLOT DIAGRAM1
01/25/2018321507268Open ↗
▸DOB NOWCalculations1
08/13/2026B01019234-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01019234-I1Open ↗