← Back
Four families
462 60 STREET
BROOKLYN · BIN 3143435
💬 Discuss this project
1907Year Built
4Stories
C3Building Class
R6BZoning
4,800 sfGross Floor Area
4Units
Rent Stabilized43 Open Violations ▸FDNY Report ↗
Four families · Owner of record: LIN & LI 462 LLC · 2,000 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 41p · 1 filing · 2 docs
Floor 3
Floor 2
Floor 1
Cellar2p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIN & LI 462 LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2024$2.1M—Private party → LIN & LI 462 LLC$433/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI605/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor504/09/2026
JOHN FITZGERALD PLBG &HTGPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394205/11/2026
Building Lifecycle
All (84)Filed (6)Permit Issued (6)Signed Off (3)Violation (60)Inspection (6)Special Inspection (3)
07/13/2026
Signed off — Alteration
FINISH UNFINISHED CELLAR, NEW TILES FLOORING. NEW HOT WATER HEATER,WASHER, DRYER AND 2-PC RESTROOM IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01143169-I1
06/05/2026
Signed off — Alteration
RESOLVE ECB VIOLATIONS: 39132221L, 39132222N AND 39132223P; RENOVATION EXISTING 4TH FLOOR WITH PLUMBING WORK: REPLACE KITCHEN SINK AND BATHROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01152494-I1
05/19/2026
Signed off — Alteration
B01348683-I1
05/12/2026
Filed — Alteration
FINISH UNFINISHED CELLAR, NEW TILES FLOORING. NEW HOT WATER HEATER,WASHER, DRYER AND 2-PC RESTROOM IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01143169-P1
05/11/2026
Filed — Alteration
FINISH UNFINISHED CELLAR, NEW TILES FLOORING. NEW HOT WATER HEATER,WASHER, DRYER AND 2-PC RESTROOM IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01143167-P1
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
05/11/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
05/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/01/2026
Violation issued (HPD, open)
A
02/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/22/2026
Permit issued — Construction Fence
B01348683-I1-FN
01/21/2026
Filed — Alteration
B01348683-I1
12/10/2025
Permit issued — Plumbing
B01143169-I1-PL
12/10/2025
Permit issued — General Construction
B01143167-I1-GC
11/19/2025
Violation issued (HPD, open)
I
07/15/2025
Violation issued (HPD, open)
A
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, closed)
C
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
A
07/15/2025
Violation issued (HPD, open)
A
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
B
06/06/2025
Violation issued (HPD, open)
A
06/02/2025
Violation issued (HPD, closed)
C
06/02/2025
Violation issued (HPD, open)
A
06/02/2025
Violation issued (HPD, open)
B
06/02/2025
Violation issued (HPD, open)
C
06/02/2025
Violation issued (HPD, open)
B
06/02/2025
Violation issued (HPD, open)
A
06/02/2025
Violation issued (HPD, open)
A
06/02/2025
Violation issued (HPD, open)
A
05/27/2025
Violation issued (HPD, open)
C
05/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/22/2025
Violation issued (ECB, closed)
Construction
01/07/2025
Permit issued — Plumbing
B01152494-I1-PL
12/06/2024
Filed — Alteration
RESOLVE ECB VIOLATIONS: 39132221L, 39132222N AND 39132223P; RENOVATION EXISTING 4TH FLOOR WITH PLUMBING WORK: REPLACE KITCHEN SINK AND BATHROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01152494-I1
12/06/2024
Permit issued — Plumbing
B01143169-I1-PL
12/06/2024
Violation issued (ECB, closed)
Construction
12/06/2024
Violation issued (ECB, closed)
Construction
12/06/2024
Violation issued (ECB, closed)
Construction
12/03/2024
Permit issued — General Construction
B01143167-I1-GC
11/26/2024
Filed — Alteration
FINISH UNFINISHED CELLAR, NEW TILES FLOORING. NEW HOT WATER HEATER,WASHER, DRYER AND 2-PC RESTROOM IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01143169-I1
11/26/2024
Filed — Alteration
FINISH UNFINISHED CELLAR, NEW TILES FLOORING. NEW HOT WATER HEATER,WASHER, DRYER AND 2-PC RESTROOM IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01143167-I1
04/16/2023
Violation issued (HPD, open)
B
04/16/2023
Violation issued (HPD, closed)
C
04/16/2023
Violation issued (HPD, closed)
B
04/16/2023
Violation issued (HPD, closed)
B
04/16/2023
Violation issued (HPD, closed)
B
04/16/2023
Violation issued (HPD, closed)
B
04/16/2023
Violation issued (HPD, closed)
A
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offKALE CONSTRUCTION INC01/22/2026
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/10/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC12/10/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG01/07/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/06/2024
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC12/03/2024
BISPLISSUEDK & BH PLUMBING & HTG INC10/12/2005
BISOTISSUEDKING'S ASSOC. INC09/30/2005
1 project · most recent 05/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/12/2026Signed-offJOHN FITZGERALD PLBG &HTGGas, Storm, Water/Sanitary
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/11/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/11/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
05/11/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026B01152494-I1Request digital key ↗
08/18/2026B01348683-I1Request digital key ↗
08/17/2026B01143167-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026B01143167-P1Open ↗
08/17/2026B01143167-I1Open ↗
08/17/2026B01143169-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01143167-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01143167-P1Open ↗