← Back
Two family converted from one family
462 AVENUE X
BROOKLYN · BIN 3195360
💬 Discuss this project
1960Year Built
1Stories
B3Building Class
R4Zoning
885 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family converted from one family · Owner of record: SEPHARDIC MIKVEH OF GRAVESEND LIMITED · 2,234 sf lot · 0.4 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 15 docs
Floor 1Under Construction1p · 2 filings · 13 docs
BasementUnder Construction3p · 3 filings · 20 docs
Sub-BasementUnder Construction1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/03/2022$1.3M—462 AVENUE X LLC → SEPHARDIC MIKVEH OF GRAVESEND LIMITED$1,469/sf building
05/12/2015$750K—Private party → 462 AVENUE X LLC$847/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEONID KRUPNIK308/25/2026
AHT ENGINEERING PLLC407/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BDS ELECTRIC CORP.Electrical103/22/2026
Building Lifecycle
All (79)Filed (7)Permit Issued (4)Violation (1)Objection (37)Special Inspection (30)
09/08/2026
Special inspection requirement — Concrete - Cast-In-Place
09/08/2026
Special inspection requirement — Subgrade Inspections
09/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
09/08/2026
Special inspection requirement — Structural Steel - Welding
08/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL & VERTICAL ENLARGEMENT & CHANGE IN USE TO PROPOSED COMMUNITY FACILITY.
B01192832-S1
08/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL & VERTICAL ENLARGEMENT & CHANGE IN USE TO PROPOSED COMMUNITY FACILITY.
B01192832-S3
08/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL & VERTICAL ENLARGEMENT & CHANGE IN USE TO PROPOSED COMMUNITY FACILITY.
B01192832-S2
08/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/23/2026
Special inspection requirement — Masonry
08/23/2026
Special inspection requirement — Structural Cold-Formed Steel
08/23/2026
Special inspection requirement — Structural Steel - Details
08/19/2026
Special inspection requirement — Footing and Foundation
08/19/2026
Special inspection requirement — Final
08/19/2026
Special inspection requirement — Final
08/17/2026
Permit issued — General Construction
B01259343-I1-GC
08/14/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2026
Objection resolved — Resolved
03/23/2026
Objection raised — Scope
03/23/2026
Objection resolved — Addressed
09/09/2025
Permit issued — Construction Fence
B01184543-I1-FN
07/29/2025
Permit issued — General Construction
B01259343-I1-GC
07/21/2025
Filed — Alteration
MINOR DEMOLITON OF INTERIOR NON-BEARING PARTITIONS IN PREPARATION FOR BUILDING RENOVATION (FILED SEPARATELY UNDER #B01192832). NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01259343-I1
06/05/2025
Objection resolved — Addressed
05/15/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/16/2025
Objection resolved — Addressed
04/16/2025
Objection resolved — Addressed
04/01/2025
Permit issued — Construction Fence
B01184543-I1-FN
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Scope
03/24/2025
Objection raised — Admin
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Admin
03/24/2025
Objection raised — Admin
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Structural
03/24/2025
Objection raised — Admin
03/24/2025
Objection raised — Structural
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Scope
03/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL & VERTICAL ENLARGEMENT & CHANGE IN USE TO PROPOSED COMMUNITY FACILITY.
B01192832-I1
03/10/2025
Objection raised — Zoning
03/10/2025
Objection raised — Zoning
03/10/2025
Objection raised — Zoning
03/10/2025
Objection raised — Scope
03/10/2025
Objection raised — Zoning
03/10/2025
Objection raised — Scope
03/10/2025
Objection raised — Zoning
03/10/2025
Special inspection requirement — Lighting controls
03/10/2025
Special inspection requirement — Interior lighting power
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSEPHARDIC MIKVEH OF GRAVESEND08/17/2026
DOB NOWConstruction FencePermit IssuedSEPHARDIC MIKVEH OF GRAVESEND09/09/2025
DOB NOWGeneral ConstructionPermit IssuedSEPHARDIC MIKVEH OF GRAVESEND07/29/2025
DOB NOWConstruction FencePermit IssuedSEPHARDIC MIKVEH OF GRAVESEND04/01/2025
1 project · most recent 12/28/2018
FiledStatusContractorScope
12/28/2018Permit IssuedBDS ELECTRIC CORP.2 meters, 2 new_meters
1 project · most recent 02/25/2025
Fence
FiledStatusContractorScope
02/25/2025Permit IssuedSEPHARDIC MIKVEH OF GRAVESENDFence
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
09/08/2026Concrete - Cast-In-Place—special
09/08/2026Subgrade Inspections—special
09/08/2026Structural Steel - High Strength Bolting—special
09/08/2026Structural Steel - Welding—special
08/25/2026Structural Stability – Alterations of existing buildings—special
08/23/2026Masonry—special
08/23/2026Structural Cold-Formed Steel—special
08/23/2026Structural Steel - Details—special
08/19/2026Footing and Foundation—progress
08/19/2026Final—progress
08/19/2026Final—progress
03/10/2025Lighting controls—energy_progress
03/10/2025Interior lighting power—energy_progress
03/10/2025Fenestration air leakage—energy_progress
03/10/2025Maintenance information—energy_progress
03/10/2025Fenestration and door U-factor and product ratings—energy_progress
03/10/2025Fire-Resistant Penetrations and Joints—special
03/10/2025Masonry—special
03/10/2025Lowest Floor Elevation—progress
03/10/2025Energy Code Compliance Inspections—progress
03/10/2025Fire-Resistance Rated Construction—progress
03/10/2025Air barrier - visual inspection—energy_progress
03/10/2025Fenestration areas—energy_progress
03/10/2025Exterior lighting power—energy_progress
03/10/2025Insulation placement and R values—energy_progress
Latest 25 of 41.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026B01184543-I1Request digital key ↗
08/22/2026B01192832-I1Request digital key ↗
08/21/2026B01259343-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/22/2026B01192832-I1Open ↗
08/13/2026B01192832-I1Open ↗
08/13/2026B01184545-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/22/2026B01192832-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01192832-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026B01184543-I1Open ↗
08/22/2026B01184545-I1Open ↗
08/13/2026B01259343-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01192832-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01192832-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01192832-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01184545-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01192832-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01259343-I1Open ↗
08/13/2026B01192832-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026B01184545-I1Open ↗
08/13/2026B01184543-I1Open ↗
08/13/2026B01259343-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026B01192832-I1Open ↗
08/13/2026B01184545-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01192832-I1Open ↗
08/13/2026B01184545-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026B01184545-I1Open ↗
08/13/2026B01192832-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01184545-I1Open ↗