← Back
STATEN ISLAND
462 ROBINSON AVENUE
STATEN ISLAND · BIN 5176160
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructural
Floor 217p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Basement17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MP REALTY HOLDING1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC407/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MP REALTY HOLDING CORPGeneral Contractor507/08/2026
DV PLUMBING INCPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738307/26/2024
Building Lifecycle
All (55)Filed (4)Permit Issued (6)Signed Off (2)Inspection (13)Objection (2)Special Inspection (28)
08/27/2024
Signed off — New Building
CONSTRUCT ATTACHED ONE FAMILY RESIDENCE WITH BUILT IN TWO CAR GARAGE.
S00934835-S1
08/08/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/07/2024
Signed off — New Building
CONSTRUCT ATTACHED ONE FAMILY RESIDENCE WITH BUILT IN TWO CAR GARAGE.
S00934835-S2
08/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2024
Filed — New Building
CONSTRUCT ATTACHED ONE FAMILY RESIDENCE WITH BUILT IN TWO CAR GARAGE.
S00934835-P1
07/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2024
Permit issued — Curb Cut
S00934835-S2-CC
06/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/21/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/07/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/05/2024
Filed — New Building
CONSTRUCT ATTACHED ONE FAMILY RESIDENCE WITH BUILT IN TWO CAR GARAGE.
S00934835-S2
04/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/04/2024
Permit issued — Plumbing
S00934835-S1-PL
12/05/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/22/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/16/2023
Permit issued — Plumbing
S44523720-S1-PL
11/16/2023
Permit issued — Plumbing
S00934835-S1-PL
10/27/2023
Permit issued — Mechanical Systems
S00934835-I1-FO-EA
10/27/2023
Permit issued — General Construction
S00934835-I1-GC-CX
10/20/2023
Filed — New Building
CONSTRUCT ATTACHED ONE FAMILY RESIDENCE WITH BUILT IN TWO CAR GARAGE.
S00934835-S1
10/17/2023
Objection resolved — Addressed
10/10/2023
Objection raised — Scope
09/19/2023
Filed — New Building
CONSTRUCT ATTACHED ONE FAMILY RESIDENCE WITH BUILT IN TWO CAR GARAGE.
S00934835-I1
09/19/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
09/19/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
09/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
09/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/19/2023
Special inspection requirement — Permanent certificate
anthony santoro
09/19/2023
Special inspection requirement — Air barrier — testing
anthony santoro
09/19/2023
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
09/19/2023
Special inspection requirement — Ventilation and air distribution system
anthony santoro
09/19/2023
Special inspection requirement — Maintenance information
anthony santoro
09/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
09/19/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
09/19/2023
Special inspection requirement — Metering
anthony santoro
09/19/2023
Special inspection requirement — Fenestration areas
anthony santoro
09/19/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
09/19/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
09/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
09/19/2023
Special inspection requirement — Interior lighting power
anthony santoro
09/18/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
09/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/18/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
09/18/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
09/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
09/18/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
09/18/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
09/18/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
09/15/2023
Special inspection requirement — Mechanical Systems
anthony santoro
09/15/2023
Special inspection requirement — Footing and Foundation
anthony santoro
09/15/2023
Special inspection requirement — Final
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMP REALTY HOLDING CORP07/08/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/04/2024
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC11/16/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/16/2023
DOB NOWMechanical SystemsSigned-offMP REALTY HOLDING CORP10/27/2023
DOB NOWGeneral ConstructionPermit IssuedMP REALTY HOLDING CORP10/27/2023
1 project · most recent 07/26/2024
Sprinkler System
FiledStatusContractorScope
07/26/2024——Sprinkler System
1 project · most recent 07/26/2024
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
07/26/2024Signed-offDV PLUMBING INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 03/27/2024
General Wiring
FiledStatusContractorScope
03/27/2024CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 07/26/2024
Wood
FiledStatusContractorScope
07/26/2024Signed-offMP REALTY HOLDING CORPWood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/08/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/21/2024Fail-Final CND-Occupancy InspectionFailView ↗
06/07/2024Fail-Final CND-Occupancy InspectionFailView ↗
04/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/05/2023Pass-Final PL - UndergroundPassView ↗
11/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/19/2023Fenestration air leakageanthony santoroenergy_progress
09/19/2023Protection of exposed foundation insulationanthony santoroenergy_progress
09/19/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
09/19/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/19/2023Permanent certificateanthony santoroenergy_progress
09/19/2023Air barrier — testing anthony santoroenergy_progress
09/19/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
09/19/2023Ventilation and air distribution systemanthony santoroenergy_progress
09/19/2023Maintenance informationanthony santoroenergy_progress
09/19/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
09/19/2023Air barrier - visual inspectionanthony santoroenergy_progress
09/19/2023Meteringanthony santoroenergy_progress
09/19/2023Fenestration areasanthony santoroenergy_progress
09/19/2023Insulation placement and R valuesanthony santoroenergy_progress
09/19/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
09/19/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
09/19/2023Interior lighting poweranthony santoroenergy_progress
09/18/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/18/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
09/18/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
09/18/2023Subgrade Inspectionsanthony santorospecial
09/18/2023Fire-Resistance Rated Constructionanthony santoroprogress
09/18/2023Structural Wood Frameanthony santoroprogress
09/18/2023Concrete - Cast-In-Placeanthony santorospecial
09/18/2023Energy Code Compliance Inspectionsanthony santoroprogress
Latest 25 of 28.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026S00934835-S1Request digital key ↗
08/21/2026S00934835-I1Request digital key ↗
08/21/2026S00934835-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00934835-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00934835-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00934835-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026S00934835-I1Open ↗
08/21/2026S00934835-S1Open ↗
08/21/2026S00934835-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026S00934835-I1Open ↗
08/25/2026S00934835-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S00934835-I1Open ↗
08/25/2026S00934835-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00934835-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00934835-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00934835-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00934835-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00934835-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00934835-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00934835-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00934835-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026S00934835-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00934835-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00934835-I1Open ↗