← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
40 MERCER STREET
MANHATTAN · BIN 1087559
💬 Discuss this project
2005Year Built
13Stories
RMBuilding Class
M1-5/R9XZoning
117,024 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 21,370 sf lot · 5.48 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof1p · 1 filing · 6 docs
Floor 88p · 2 filings · 20 docs
Floor 75p · 2 filings · 20 docs
Floor 64p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 23p · 1 filing · 16 docs
Floor 114p · 3 filings · 20 docs
Cellar2p · 2 filings · 11 docs
Sub-Cellar2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTURION REALTY4907/08/2026
B10 SOHO RETAIL JV206/02/2026
CLIFTON ARCHITECTURAL GLA303/22/2026
FROI, LLC103/22/2026
WXIV BROADWAY GRAND REALTY2403/22/2026
WXV/BROADWAY GRAND REALTY103/22/2026
PAVARINI MCGOVERN103/22/2026
ESV REALTY103/22/2026
MERCER ST LLC103/22/2026
RL MERCER ST LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGHLINE CONSTRUCTION GRGeneral Contractor504/09/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor507/08/2026
POLAR MECHANICAL CORPGeneral Contractor403/21/2026
J. CAIAZZO PLBG & HTG CORPlumbing407/08/2026
KG SPRINKLERPlumbing303/22/2026
EVEREST SCAFFOLDING INCGeneral Contractor307/08/2026
SALT CONSTRUCTION INCGeneral Contractor303/21/2026
PIECE MANAGEMENT INCGeneral Contractor203/21/2026
DONATO PLUMBING, INCPlumbing207/08/2026
SIGNS CADScaffold107/08/2026
S&P ELECTRIC CO LLCElectrical103/22/2026
VALLESIGNS AWNINGSScaffold106/02/2026
V.I.P. ELECTL CONTR CORPElectrical103/22/2026
KG SPRINKLER CORPFire Protection107/08/2026
PAR FIRE PROTECTION LLCFire Protection107/08/2026
A & B CONTRACTING SVCS INGeneral Contractor107/08/2026
DYNAMIC CONSTRUCTION SERVGeneral Contractor107/08/2026
HERBERT ROSE INCGeneral Contractor107/08/2026
SHAPEL GENERAL CONTRACTINGeneral Contractor107/08/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D'ANTONIO CONSULTING ENGI931401/06/2026
SOCOTEC ENGINEERING4983211/21/2025
PROJECT TACTICAL SOLUTION5859210/30/2025
SOCOTEC, INC.301104/30/2025
CATALPA SPECIAL INSPECTIO20041001/16/2025
METRIC CONSULTING AND INS1803401/16/2025
A DEGREE OF FREEDOM STRUC925210/31/2024
MEP INSPECTIONS, INC1102209/26/2024
GZ & NC CODE CONSULTING P7492110/13/2023
Building Lifecycle
All (180)Filed (32)Permit Issued (24)Signed Off (19)Facade (FISP) (12)Violation (48)Inspection (13)Objection (2)Special Inspection (30)
05/29/2026
Permit issued — Sign
M01379261-I1-SG
05/21/2026
Filed — Alteration
Installation of awning, flag and interior signage, approx. 100 SF as per drawings herein.
M01379261-I1
05/20/2026
Signed off — Alteration
Plumbing subsequent application of the 1st floor for retail build out. No change in use, egress or occupancy
M01304984-I1
05/19/2026
Special inspection requirement — Final
JERE MURDOCH
05/14/2026
Signed off — Alteration
Mechanical work to include installation of units and ventilation as per plans filed herewith. No change to use, egress or occupancy.
M01130250-S1
05/14/2026
Signed off — Alteration
Installation of sprinkler heads as per plans filed herewith. No change to use, egress or occupancy.
M01130278-I1
05/14/2026
Signed off — Alteration
Mechanical work to include installation of units and ventilation as per plans filed herewith. No change to use, egress or occupancy.
M01130250-S2
05/14/2026
Signed off — Alteration
Mechanical work to include installation of units and ventilation as per plans filed herewith. No change to use, egress or occupancy.
M01130250-I1
05/13/2026
Signed off — Alteration
Mechanical work to include installation of units and ventilation as per plans filed herewith. No change to use, egress or occupancy.
M01130250-S3
04/21/2026
Signed off — Alteration
Plumbing subsequent application of the 1st floor for retail build out. No change in use, egress or occupancy
M01304984-S1
04/20/2026
Filed — Alteration
Plumbing subsequent application of the 1st floor for retail build out. No change in use, egress or occupancy
M01304984-P1
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
04/20/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2026
Filed — Alteration
Plumbing subsequent application of the 1st floor for retail build out. No change in use, egress or occupancy
M01304984-P2
03/17/2026
Signed off — Alteration
GENERAL CONSTRUCTION FOR RETAIL STORE BUILDOUT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01306436-I1
03/16/2026
Permit issued — Plumbing
M01130250-S1-PL
02/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/20/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
02/20/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
02/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/03/2026
Permit issued — Mechanical Systems
M01130250-S2-MS
01/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2026
Filed — Alteration
Installation of sprinkler heads as per plans filed herewith. No change to use, egress or occupancy.
M01130278-P1
12/30/2025
Special inspection requirement — Sprinkler Systems
GAETANO D'ANTONIO
12/30/2025
Special inspection requirement — Post-installed Anchors
GAETANO D'ANTONIO
12/30/2025
Special inspection requirement — Mechanical Systems
GAETANO D'ANTONIO
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
12/30/2025
Special inspection requirement — Post-installed Anchors
GAETANO D'ANTONIO
12/30/2025
Special inspection requirement — Final
GAETANO D'ANTONIO
12/29/2025
Objection resolved — Addressed
12/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/26/2025
Objection raised — Scope
12/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/17/2025
Permit issued — Sprinklers
M01130278-I1-EW-SP
12/16/2025
Filed — Alteration
Mechanical work to include installation of units and ventilation as per plans filed herewith. No change to use, egress or occupancy.
M01130250-P2
12/16/2025
Filed — Alteration
Mechanical work to include installation of units and ventilation as per plans filed herewith. No change to use, egress or occupancy.
M01130250-P1
12/12/2025
Special inspection requirement — Final
GAETANO D'ANTONIO
12/12/2025
Special inspection requirement — Post-installed Anchors
GAETANO D'ANTONIO
12/12/2025
Special inspection requirement — Mechanical Systems
GAETANO D'ANTONIO
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
12/01/2025
Permit issued — Plumbing
M01304984-S1-PL
11/26/2025
Permit issued — General Construction
M01304984-I1-GC
11/21/2025
Filed — Alteration
Plumbing subsequent application of the 1st floor for retail build out. No change in use, egress or occupancy
M01304984-S1
11/19/2025
Permit issued — General Construction
M01306436-I1-GC
11/14/2025
Filed — Alteration
Plumbing subsequent application of the 1st floor for retail build out. No change in use, egress or occupancy
M01304984-I1
10/30/2025
Filed — Alteration
GENERAL CONSTRUCTION FOR RETAIL STORE BUILDOUT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01306436-I1
10/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
10/21/2025
Special inspection requirement — Final
Michael Kahn
09/30/2025
Signed off — Alteration
CHIMI-- PLUMBING MODIFICATIONS AND INSTALLATIONS FOR RETAIL RENOVATION.
M01041829-S2
09/30/2025
Permit issued — Structural
M01130250-S3-ST
09/30/2025
Permit issued — General Construction
M01130250-I1-GC
09/15/2025
Filed — Alteration
CHIMI-- PLUMBING MODIFICATIONS AND INSTALLATIONS FOR RETAIL RENOVATION.
M01041829-P2
09/15/2025
Signed off — Alteration
M01041959-I1
09/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
09/10/2025
Cycle 10 facade report signed — SAFE
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedVALLESIGNS & AWNINGS INC05/29/2026
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/16/2026
DOB NOWMechanical SystemsSigned-offPOLAR MECHANICAL CORP02/03/2026
DOB NOWSprinklersSigned-offH M SPRINKLER INC12/17/2025
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR12/01/2025
DOB NOWGeneral ConstructionSigned-offSHAPEL GENERAL CONTRACTIN11/26/2025
DOB NOWGeneral ConstructionSigned-offDYNAMIC CONSTRUCTION SERV11/19/2025
DOB NOWStructuralSigned-offHIGHLINE CONSTRUCTION GR09/30/2025
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR09/30/2025
DOB NOWGeneral ConstructionSigned-offHERBERT ROSE INC05/14/2025
DOB NOWMechanical SystemsSigned-offPOLAR MECHANICAL CORP03/21/2025
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR03/20/2025
DOB NOWStructuralSigned-offHIGHLINE CONSTRUCTION GR03/19/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/17/2025
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE08/01/2024
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC07/30/2024
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC07/29/2024
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC07/23/2024
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC07/23/2024
DOB NOWSignSigned-offSIGNS CAD CORP02/20/2024
DOB NOWGeneral ConstructionSigned-offSALT CONSTRUCTION INC10/30/2023
DOB NOWGeneral ConstructionSigned-offA B CONTRACTING SVCS IN06/02/2022
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/26/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC05/22/2018
BISOTISSUEDPRECISION BUILDING & CONS12/24/2020
BISPLISSUEDM&T PLBG AND HTG CO., INC08/14/2019
BISOTISSUEDCLIFTON ARCHITECTURAL GLA01/10/2019
BISOTISSUEDCLIFTON ARCHITECTURAL GLA06/22/2018
BISOTISSUEDRITEWAY NY GENERAL CONTRA05/23/2018
BISOTISSUEDGT PRESTIGE INC12/23/2015
BISOTISSUEDCREATIVE CONSTRUCTORS COR05/20/2013
BISMHISSUEDDUCE CONSTRUCTION CORP09/20/2012
BISPLISSUEDA.R.L. PLUMBING & HTG LLC08/16/2012
BISOTISSUEDMJL DESIGN & DEVELOPMENT08/07/2012
BISMHISSUEDMJL DESIGN & DEVELOPMENT08/07/2012
BIS—ISSUEDVALLESIGNS & AWNINGS INC10/19/2011
BIS—ISSUEDVALLESIGNS & AWNINGS INC10/19/2011
BIS—ISSUEDVALLESIGNS & AWNINGS INC10/19/2011
BISOTISSUEDWADE RAY & ASSOC CONST IN03/18/2011
BISEQISSUEDEVEREST SCAFFOLDING INC04/02/2010
+ 34 more permits on file
2 projects · most recent 01/06/2026
Sprinkler System
FiledStatusContractorScope
01/06/2026Signed-offKG SPRINKLER CORP64 heads
10/13/2023——Sprinkler System
3 projects · most recent 04/20/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/20/2026Signed-offJ. CAIAZZO PLBG & HTG CORWater/Sanitary
01/06/2026———
12/16/2025Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
12 projects · most recent 05/20/2026
General Wiring Lighting
FiledStatusContractorScope
05/20/2026CompleteWARREN OSTROFF ELEC., INCGeneral Wiring
11/07/2025CompleteEPIC ELECTRIC INCGeneral Wiring
10/31/2025CompleteLEBO ELECTRIC LLCGeneral Wiring
03/13/2025CompleteWARREN OSTROFF ELEC., INC—
08/21/2024CompleteS&P ELECTRIC CO LLCGeneral Wiring
08/06/2024CompleteV.I.P. ELECTL CONTR CORPGeneral Wiring
02/13/2024CompleteSTELLMANN ELECTRICAL CORPGeneral Wiring
11/20/2023CompleteR. GUNZER, INC.General Wiring
08/01/2023CompleteCOMMERCIAL ELECT CONT INCGeneral Wiring
10/08/2020CompleteCORP. ELEC'L TECHNOLOGIES—
08/08/2019CompleteBIGMAN BROS., INC.General Wiring, Lighting
05/07/2018CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 04/20/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/20/2026Signed-offJ. CAIAZZO PLBG & HTG CORTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
05/19/2026FinalJERE MURDOCHprogress
04/20/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/20/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
04/20/2026FinalALEXIS SCHLESSINGERMANprogress
02/20/2026Tenant Protection Plan Compliance—special
02/20/2026FinalALEXIS SCHLESSINGERMANprogress
02/20/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
12/30/2025Sprinkler SystemsGAETANO D'ANTONIOspecial
12/30/2025Post-installed AnchorsGAETANO D'ANTONIOspecial
12/30/2025Mechanical SystemsGAETANO D'ANTONIOspecial
12/30/2025Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
12/30/2025Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
12/30/2025Post-installed AnchorsGAETANO D'ANTONIOspecial
12/30/2025FinalGAETANO D'ANTONIOprogress
12/12/2025FinalGAETANO D'ANTONIOprogress
12/12/2025Post-installed AnchorsGAETANO D'ANTONIOspecial
12/12/2025Mechanical SystemsGAETANO D'ANTONIOspecial
12/12/2025Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
10/21/2025Tenant Protection Plan ComplianceMax Leespecial
10/21/2025FinalMichael Kahnprogress
09/15/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
04/30/2025MasonryStanford Chanspecial
02/12/2025Tenant Protection Plan ComplianceStanford Chanspecial
01/17/2025FinalERIC BERLENTprogress
01/17/2025Post-installed AnchorsSAMI HAJJAR P.Especial
Latest 25 of 53.
▾Documents — 608 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch31
09/06/2026M00041085-I1Request digital key ↗
09/02/2026M00667563-I1Request digital key ↗
08/29/2026M00893280-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/28/2026M00962013-I1Request digital key ↗
▸Applications & Permits121
▸BISWORK PERMIT APPLICATION51
12/24/2020140950102Open ↗
08/16/2019123596821Open ↗
08/14/2019123596821Open ↗
Showing 3 of 51 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION44
09/11/2020140950102Open ↗
06/25/2019123596821Open ↗
03/08/2018123436521Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWLPC Approval/Permit25
08/17/2026M01379261-I1Open ↗
08/13/2026M01130250-I1Open ↗
08/13/2026M01041829-S1Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/11/2020140950102Open ↗
▸Seals & Professional Certifications194
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION77
03/02/2020123275464Open ↗
03/02/2020123275464Open ↗
02/21/2020123275464Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/02/2026M00667563-I1Open ↗
08/29/2026M00936510-I1Open ↗
08/29/2026M00936510-S1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/01/2026M01130278-P1Open ↗
09/01/2026M01130278-P1Open ↗
09/01/2026M01130278-P1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST19
06/25/2019123596821Open ↗
03/08/2018123436521Open ↗
11/06/2017123275464Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/15/2026M01304984-P1Open ↗
09/03/2026M00041085-I1Open ↗
09/01/2026M01041829-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
10/11/2011120851355Open ↗
10/11/2011120851408Open ↗
10/11/2011120851382Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/25/2019123596821Open ↗
03/08/2018123436521Open ↗
11/06/2017123275464Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/17/2013140076815Open ↗
▸BISProfessional and Owner Certification (POC3)1
11/06/2017123275473Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/17/2013140076815Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/11/2020140950102Open ↗
▸Trade Schedules & Equipment35
▸BISSCHEDULE B - PLUMBING16
01/28/2013121514977Open ↗
07/26/2012121159771Open ↗
Showing 2 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
12/19/2012121159771Open ↗
09/18/2012121159771Open ↗
Showing 2 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/25/2019123596821Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes5
09/11/2020140950102Open ↗
07/12/2019123596821Open ↗
03/08/2018123436521Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos26
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER16
07/26/2012121159771Open ↗
07/03/2012121126076Open ↗
Showing 2 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00667563-I1Open ↗
08/29/2026M00936510-S1Open ↗
08/29/2026M00936510-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/11/2020140950102Open ↗
10/24/2014122172424Open ↗
05/17/2013140076815Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
01/28/2013121514977Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
06/25/2019123596821Open ↗
03/08/2018123436521Open ↗
12/02/2015122554351Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/11/2020140950102Open ↗
08/19/2020123596821Open ↗
▸BISTR8: Energy Code Progress Inspections2
01/28/2013121514977Open ↗
09/25/2012121126076Open ↗
▸BISEN2 - As Built Energy Analysis1
11/29/2012121126076Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/11/2020140950102Open ↗
08/19/2020123596821Open ↗
05/17/2013140076815Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs80
▸BISLANDMARKS APPROVAL26
09/11/2020140950102Open ↗
03/02/2020123275464Open ↗
02/21/2020123275464Open ↗
Showing 3 of 26 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
08/19/2020123596821Open ↗
03/02/2020123275464Open ↗
02/21/2020123275464Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS22
01/28/2013121514977Open ↗
08/09/2012121159771Open ↗
07/03/2012121126076Open ↗
Showing 3 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
08/19/2020123596821Open ↗
01/02/2015122172424Open ↗
05/17/2013140076815Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
11/28/2014122172424Open ↗
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT47
09/11/2020140950102Open ↗
08/19/2020123596821Open ↗
03/02/2020123275464Open ↗
Showing 3 of 47 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
05/24/2018123275473Open ↗
01/20/2016122554351Open ↗
▸Filing & Intake Forms40
▸BISEFILING COVER SHEET31
06/25/2019123596821Open ↗
03/08/2018123436521Open ↗
11/06/2017123275464Open ↗
Showing 3 of 31 on file for this type
▸BISBOROUGH INTAKE FORM3
03/02/2020123275464Open ↗
02/21/2020123275464Open ↗
02/20/2020123275473Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
09/11/2020140950102Open ↗
05/17/2013140076815Open ↗
Showing 2 of 3 on file for this type
▸BISADDITIONAL INFORMATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M01041942-P1Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M01041829-I1Open ↗
08/13/2026M01041829-P1Open ↗
08/13/2026M01130250-I1Open ↗
Showing 3 of 4 on file for this type