← Back
BuildNYC
Predominantly retail with other uses
463 EAST TREMONT AVENUE
BRONX · BIN 2011248
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
C4-5XZoning
4,684 sfGross Floor Area
3Units
Rent Stabilized10 Active Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 463 Saddle Up Tremon · 5,362 sf lot · 0.87 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 14 filings
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
463 Saddle Up Tremont103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering111/06/2026
Ramirez Engineering309/02/2024
KDV Designs Architects205/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2260 MagGeneral Contractor107/08/2026
Quintuna ServiceGeneral Contractor107/08/2026
Satellite PlumbingPlumbing103/21/2026
Akala ConstructionScaffold111/08/2026
Master Fire Prevention SystemsFire Protection207/20/2001
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ramirez Engineering8679108/12/2024
SY Engineering5149102/24/2021
Building Lifecycle
11/06/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01485994-I1
11/06/2026
Permit issued — Sidewalk Shed
X01485994-I1-SH
10/14/2026
Corrective action plan req'd-obsvd at EXP1 masonry cracks at parapet & an area of bricks bulging near EXP1/2 parapet. At EXP1 obsvd cracked window…
DOB violation · open
10/14/2026
Ftm bldg in a code compliant manner-obsvd brick masonry bulging and several masonry cracks at parapet of EXP1. An annual parapet observation report…
DOB violation · open
12/30/2024
Signed off — Alteration
CONVERTING OF EXISTING COMMERCIAL SPACE INTO A BEAUTY SALON (1ST FL). REMOVE 1ST FLOOR PARTITION WALL, DOOR, AND KITCHEN COUNTERS. REMOVE 1/2 PARTITION WALLS ON 1ST FLOOR. ADD NEW PARTITION WALL ON 1ST FL. AND BEAUTY SALON STATIONS. NO CHANGE ON COO OR U
X01094151-I1
45 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Akala Construction—
DOB NOW—Quintuna Service—
DOB NOW—2260 Mag—
BIS—Satellite Plumbing—
BIS—Master Fire Systems—
BIS—Satellite Plumbing—
BIS—Satellite Plumbing—
BIS—Master Fire Prevention Systems—
BIS—Frank Basile Contracting—
BIS—Satellite Plumbing—
BIS—Satellite Plumbing—
BIS—Luis Hernandez General Contracting—
Nothing on file for this building.
Nothing on file for this building.
20 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account