← Back
Two family brick
4642 BEDFORD AVENUE
💬 Discuss this project
1940Year Built
2Stories
B1Building Class
R4Zoning
2,180 sfGross Floor Area
2Units
Two family brick · 1,884 sf lot · 1.16 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Floor 24p · 1 filing · 8 docs
Floor 13p · 1 filing · 8 docs
Basement5p · 2 filings · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/03/2021$950K—Private party → Private party$436/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI507/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
Building Lifecycle
All (13)Filed (5)Permit Issued (2)Signed Off (2)Inspection (4)
08/20/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: REPLACE KITCHEN AND BATHROOM FIXTURES; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01188275-I1
08/20/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. REDUCE METAL DECK AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01188272-I1
08/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/22/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/03/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. REDUCE METAL DECK AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01188272-P3
05/28/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. REDUCE METAL DECK AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01188272-P2
05/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/01/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. REDUCE METAL DECK AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01188272-P1
03/04/2025
Permit issued — Plumbing
B01188275-I1-PL
03/04/2025
Permit issued — General Construction
B01188272-I1-GC
02/28/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: REPLACE KITCHEN AND BATHROOM FIXTURES; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01188275-I1
02/28/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. REDUCE METAL DECK AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01188272-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC03/04/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC03/04/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/22/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026B01188275-I1Request digital key ↗
08/21/2026B01188272-P3Request digital key ↗
08/21/2026B01188272-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01188272-P2Open ↗
08/21/2026B01188272-P1Open ↗
08/21/2026B01188272-P3Open ↗
Showing 3 of 5 on file for this type