← Back
BuildNYC
Predominantly retail with other uses
465 86TH STREET
BROOKLYN · Bay Ridge · BIN 3153177
💬 Discuss this project
1915Year Built
2Stories
K4Building Class
C4-2AZoning
2,600 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: Sunrise Holdings Company (Kings) · 2,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior Renovation of Existi58p · 1 filing · 12 docs
Floor 2Interior Renovation of Existi57p · 1 filing · 12 docs
Floor 1Plumbing and sprinkler work for restaurant renovation79p · 2 filings · 20 docs
CellarPlumbing and sprinkler work for restaurant renovation24p · 1 filing · 20 docs
Site & exteriorErect illuminated sign1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Punia and Marx3607/08/2026
Sunrise Holding103/21/2026
HSBC Bank103/21/2026
Republic National Bank103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Alpha Home Design502/16/2024
Allen Shinfeld, P.E101/23/2024
Fang Architect507/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Youn Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hit Point 7General Contractor903/21/2026
Stat ElectricElectrical103/21/2026
RPJ ElectricElectrical103/21/2026
Neptune Signs & AwningsSign hanger107/08/2026
AP Plumbing & HVACPlumbing107/08/2026
Crossfield Plumbing & HeatingFire Protection107/08/2026
Doug's Plumbing & Heating Service CoPlumbing107/08/2026
Asko Electric Construction & MaintenanceElectrical103/22/2026
Doug's Plumbing & Heating Service CoFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fang Architect55131002/16/2024
Building Lifecycle
All (64)Filed (11)Permit Issued (8)Signed Off (3)Violation (5)Inspection (7)Special Inspection (30)
03/29/2024
Signed off — Alteration
B00988615-I1
03/18/2024
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
03/05/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 1ST AND 2ND FLOOR COMMERCIAL SPACE AND FILE MH WORK FOR HVAC AND COMMERCIAL KITCHEN HOOD EXHAUST SYSTEM AND DUCT WORK.
B00813747-I1
03/04/2024
Permit issued — Sign
B00988615-I1-SG
03/01/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/20/2024
Signed off — Alteration
File plumbing and sprinkler work for restaurant renovation at cel and 001. No change to exist. use, egress or occupancy
B00814280-I1
02/16/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST AND 2ND FLOOR COMMERCIAL SPACE AND FILE MH WORK FOR HVAC AND COMMERCIAL KITCHEN HOOD EXHAUST SYSTEM AND DUCT WORK.
B00813747-P2
02/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
02/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/16/2024
Special inspection requirement — Shutoff dampers
DEZHANG FANG
02/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
02/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
02/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
DEZHANG FANG
02/16/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/16/2024
Special inspection requirement — Interior lighting power
DEZHANG FANG
02/16/2024
Special inspection requirement — Final
DEZHANG FANG
02/16/2024
Special inspection requirement — Lighting controls
DEZHANG FANG
02/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
02/16/2024
Special inspection requirement — Mechanical Systems
DEZHANG FANG
02/16/2024
Special inspection requirement — Heating Systems
DEZHANG FANG
01/29/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/25/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/25/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/23/2024
Filed — Alteration
B00988615-I1
01/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
01/23/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
01/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
01/23/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
01/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/23/2024
Special inspection requirement — Sprinkler Systems
DEZHANG FANG
01/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
01/22/2024
Filed — Alteration
File plumbing and sprinkler work for restaurant renovation at cel and 001. No change to exist. use, egress or occupancy
B00814280-P6
01/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
01/22/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
01/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
01/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
01/22/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
01/22/2024
Special inspection requirement — Sprinkler Systems
DEZHANG FANG
01/08/2024
Filed — Alteration
File plumbing and sprinkler work for restaurant renovation at cel and 001. No change to exist. use, egress or occupancy
B00814280-P5
01/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
01/08/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
01/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
11/30/2023
Permit issued — Sprinklers
B00814280-I1-PL
11/20/2023
Permit issued — Sprinklers
B00814280-I1-EW-SP
09/25/2023
Permit issued — General Construction
B00813747-I1-MS
07/20/2023
Filed — Alteration
File plumbing and sprinkler work for restaurant renovation at cel and 001. No change to exist. use, egress or occupancy
B00814280-P4
06/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/19/2023
Filed — Alteration
File plumbing and sprinkler work for restaurant renovation at cel and 001. No change to exist. use, egress or occupancy
B00814280-P3
05/15/2023
Filed — Alteration
File plumbing and sprinkler work for restaurant renovation at cel and 001. No change to exist. use, egress or occupancy
B00814280-P2
05/05/2023
Filed — Alteration
File plumbing and sprinkler work for restaurant renovation at cel and 001. No change to exist. use, egress or occupancy
B00814280-P1
05/05/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST AND 2ND FLOOR COMMERCIAL SPACE AND FILE MH WORK FOR HVAC AND COMMERCIAL KITCHEN HOOD EXHAUST SYSTEM AND DUCT WORK.
B00813747-P1
03/03/2023
Permit issued — Sprinklers
B00814280-I1-EW-SP
02/24/2023
Permit issued — Sprinklers
B00814280-I1-PL
02/03/2023
Permit issued — General Construction
B00813747-I1-MS
02/03/2023
Permit issued — Mechanical Systems
B00813747-I1-GC
01/19/2023
Filed — Alteration
File plumbing and sprinkler work for restaurant renovation at cel and 001. No change to exist. use, egress or occupancy
B00814280-I1
01/18/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST AND 2ND FLOOR COMMERCIAL SPACE AND FILE MH WORK FOR HVAC AND COMMERCIAL KITCHEN HOOD EXHAUST SYSTEM AND DUCT WORK.
B00813747-I1
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNeptune Signs & Awnings03/04/2024
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating11/30/2023
DOB NOWSprinklersSigned-offCrossfield Plumbing & Heating11/20/2023
DOB NOWGeneral ConstructionSigned-offHit Point 709/25/2023
DOB NOWSprinklersSigned-offDoug's Plumbing & Heating Service Co03/03/2023
DOB NOWPlumbingSigned-offDoug's Plumbing & Heating Service Co02/24/2023
DOB NOWGeneral ConstructionSigned-offHit Point 702/03/2023
DOB NOWMechanical SystemsSigned-offHit Point 702/03/2023
BISEQISSUEDBay Restoration02/15/2014
BISEQISSUEDBay Restoration02/04/2014
BISEQISSUEDBay Restoration11/01/2013
BISEQISSUEDBay Restoration10/31/2013
BIS—ISSUEDBerger Signs07/11/2006
BIS—ISSUEDAmerican Sign & Electrical Con06/11/1999
BISPLISSUEDRocco Fanelli Plumbing12/17/1998
BISMHISSUEDJeral Construction Services10/21/1998
BISOTISSUEDJeral Construction Services10/21/1998
BISMHISSUEDPrime Contractingn Design07/17/1997
BISOTISSUEDPrime Contracting Design06/04/1997
BIS—ISSUEDUSA Signs of America01/07/1997
2 projects · most recent 01/16/2024
General Wiring
FiledStatusContractorScope
01/16/2024CompleteJong Hyun Kim—
02/17/2023CompleteAsko Electric Construction & MaintenanceGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/18/2024Pass-Final Sign Permit InspectionPassView ↗
03/01/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
02/16/2024Lighting controlsDEZHANG FANGenergy_progress
02/16/2024Mechanical SystemsDEZHANG FANGspecial
02/16/2024Heating SystemsDEZHANG FANGspecial
02/16/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/16/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
02/16/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
02/16/2024FinalDEZHANG FANGprogress
02/16/2024Interior lighting powerDEZHANG FANGenergy_progress
02/16/2024Duct leakage testing, insulation and designDEZHANG FANGenergy_progress
02/16/2024HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
02/16/2024HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
02/16/2024Shutoff dampersDEZHANG FANGenergy_progress
02/16/2024HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
01/23/2024HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
01/23/2024Sprinkler SystemsDEZHANG FANGspecial
01/23/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/23/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
01/23/2024HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
01/23/2024Maintenance informationDEZHANG FANGenergy_progress
01/23/2024HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
01/22/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/22/2024Sprinkler SystemsDEZHANG FANGspecial
01/22/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
01/22/2024HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
01/22/2024Maintenance informationDEZHANG FANGenergy_progress
Latest 25 of 62.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00813747-P1Request digital key ↗
08/27/2026B00813747-I1Request digital key ↗
08/27/2026B00813747-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
05/27/2014340095391Open ↗
10/31/2013340095373Open ↗
10/30/2013340095391Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/31/2013340095373Open ↗
10/30/2013340095391Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature16
10/03/2026B00814280-I1Open ↗
10/03/2026B00814280-I1Open ↗
09/02/2026B00814280-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00813747-P1Open ↗
08/27/2026B00813747-I1Open ↗
08/27/2026B00813747-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/03/2026B00814280-I1Open ↗
09/02/2026B00814280-P2Open ↗
09/01/2026B00813747-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/31/2013340095373Open ↗
10/30/2013340095391Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/31/2013340095373Open ↗
10/30/2013340095391Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/31/2013340095373Open ↗
10/30/2013340095391Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026B00813747-I1Open ↗
08/27/2026B00813747-P2Open ↗
08/27/2026B00813747-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/31/2013340095373Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/31/2013340095373Open ↗
10/30/2013340095391Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
10/31/2013340095373Open ↗
10/30/2013340095391Open ↗