Office with commercial, 1-6 stories
Seward Park
465 GRAND STREET · BIN 1004056
💬 Discuss this project
1963Year Built
6Stories
O5Building Class
R8Zoning
18,752 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: SEWARD PARK HOUSING CORP · 18,700 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 5 docs
Cellar2p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SEWARD PARK HOUSING4208/11/2026
APPLE BANK FOR SAVINGS307/08/2026
KINGS GROUP NY407/08/2026
SEWARD PARK COOP1004/09/2026
UNITED HOUSING FOUNDAT203/22/2026
SEWARD HOUSING203/21/2026
EMIGRANT SAVINGS BANK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMA DESIGNS LLC203/21/2026
KAZAM CONSULTANTS403/21/2026
OUTSOURCE CONSULTANTS, INC.203/21/2026
JAM CONSULTANTS, INC.403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOTAKOS, GEORGEElectrical203/21/2026
TORAL WELDING INCElectrical203/21/2026
TITAN RESTORATION INCGeneral Contractor208/11/2026
NATIONAL MAINTENANCEScaffold207/08/2026
KABACK SERVICE, INCGeneral Contractor107/08/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
CITILINE RESTORATION LLCGeneral Contractor104/09/2026
DYNAMIC US, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY RESTORATION TECHNOLOGY6187303/24/2026
MOHAMMAD AHEAD - PROFESSI9286109/22/2025
OUTSOURCE SPECIAL INSPECT2827105/28/2024
VENTROP ENGINEERING CONSU450210/14/2021
Building Lifecycle
All (80)Filed (10)Permit Issued (9)Signed Off (5)Violation (30)Objection (4)Special Inspection (22)
08/10/2026
Permit issued — General Construction
M01371600-I1-GC
06/23/2026
Permit issued — General Construction
M01371600-I1-GC
06/09/2026
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01292218-I1
04/20/2026
Objection resolved — Resolved
04/09/2026
Objection raised — Energy
03/24/2026
Filed — Alteration
ADA ramp installation as per plans. No change to use, egress, or occupancy.
M01371600-I1
03/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Hamidreza Saghari
03/24/2026
Special inspection requirement — Final
Hakan Westergren
10/10/2025
Permit issued — Structural
M01265815-I1-GC-CX
10/01/2025
Filed — Alteration
Facade repairs per plans. No change in use, occupancy, or egress.
M01265815-P1
10/01/2025
Permit issued — Suspended Scaffold
M01289540-I1-SC
09/29/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Other
09/26/2025
Special inspection requirement — Masonry
Hamidreza Saghari
09/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hamidreza Saghari
09/26/2025
Special inspection requirement — Final
Hamidreza Saghari
09/26/2025
Special inspection requirement — Air barrier - visual inspection
Hamidreza Saghari
09/25/2025
Permit issued — Sidewalk Shed
M01292218-I1-SH
09/24/2025
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01292218-I1
09/22/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01289540-I1
09/18/2025
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
09/18/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
09/16/2025
Filed — Alteration
Facade repairs per plans. No change in use, occupancy, or egress.
M01265815-I1
07/30/2025
Signed off — Alteration
Mechanical modifications on Cellar, 1st floor, and roof plans as shown filed herewith. No change in egress, occupancy, or use.
M01041543-I1
09/17/2024
Permit issued — Mechanical Systems
M01041543-I1-MS
05/28/2024
Filed — Alteration
Mechanical modifications on Cellar, 1st floor, and roof plans as shown filed herewith. No change in egress, occupancy, or use.
M01041543-I1
04/25/2024
Special inspection requirement — Final
JONAR MADRIAGA
04/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
04/25/2024
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
04/25/2024
Special inspection requirement — Electrical motors and elevators
JONAR MADRIAGA
04/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
04/25/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
04/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
04/25/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
04/25/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
06/20/2023
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "APPLE BANK WITH LOGO"
M08007307-I1
06/20/2023
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "APPLE BANK WITH LOGO"
M08007265-I1
02/24/2023
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "APPLE BANK WITH LOGO"
M08007265-I1
02/24/2023
Permit issued — Sign
M08007265-I1-SG
02/17/2023
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "APPLE BANK WITH LOGO"
M08007307-I1
02/17/2023
Permit issued — Sign
M08007307-I1-SG
10/05/2022
Special inspection requirement — Final
AHMED SHAABAN
03/04/2022
Violation issued (FDNY_NOV, closed)
10/22/2021
Signed off — Alteration
Installation of new buried LP steam pipe
M00443225-I1
10/15/2021
Special inspection requirement — Final
Wailoon Wong
10/15/2021
Special inspection requirement — Mechanical Systems
Wailoon Wong
10/14/2021
Filed — Alteration
Installation of new buried LP steam pipe
M00443225-P1
08/23/2021
Special inspection requirement — Final
Wailoon Wong
08/23/2021
Special inspection requirement — Mechanical Systems
Wailoon Wong
01/26/2021
Permit issued — Mechanical Systems
M00443225-I1-MS
01/19/2021
Filed — Alteration
Installation of new buried LP steam pipe
M00443225-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/18/2018
Violation issued (FDNY_NOV, closed)
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2014
Violation issued (FDNY_ORDER, closed)
04/23/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTITAN RESTORATION INC08/10/2026
DOB NOWGeneral ConstructionPermit IssuedTITAN RESTORATION INC06/23/2026
DOB NOWStructuralPermit IssuedCITILINE RESTORATION LLC10/10/2025
DOB NOWSuspended ScaffoldPermit IssuedCITILINE RESTORATION LLC10/01/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/25/2025
DOB NOWMechanical SystemsSigned-offKABACK SERVICE09/17/2024
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC02/24/2023
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC02/17/2023
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC01/26/2021
BISPLISSUEDDYNAMIC CONTRACTING CORP06/26/2015
BISMHISSUEDDYNAMIC US, INC06/20/2014
BISPLISSUEDDYNAMIC CONTRACTING CORP06/20/2014
BISPLISSUEDDYNAMIC CONTRACTING CORP10/03/2013
BISEQISSUEDONSITE CONSTRUCTION ENTERPRISES08/01/2013
BISEQISSUEDONSITE CONSTRUCTION ENTERPRISES04/12/2013
BISOTISSUEDDYNAMIC US, INC04/04/2013
BISOTISSUEDDYNAMIC US, INC03/29/2013
BISPLISSUEDDYNAMIC CONTRACTING CORP03/29/2013
BIS—ISSUEDMAUCERI SIGN CO., INC12/14/2012
BIS—ISSUEDMAUCERI SIGN CO., INC12/14/2012
BISMHISSUEDHI-TECH AIR CONDITIONING12/21/2010
BISOTISSUEDPINNACLE CONSTRUCTION GROUP INC02/16/2007
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING01/31/2006
BIS—ISSUEDFT KITCHENS INC.12/28/2005
BISOTISSUEDT AND G CONTRACTING INC07/25/2003
BISOTISSUEDMILLENIUM RESTORATION CORP05/09/2003
BISEQISSUEDSPRING SACFFOLDING05/02/2003
BISMHISSUEDT AND G CONTRACTING INC07/29/2002
BISOTISSUEDT AND G CONTRACTING INC07/29/2002
BISPLISSUEDPEACOCK PLUMBING01/21/1997
BISEQISSUEDBARTEL CONSTRUCTION CORP01/17/1997
BISOTISSUEDBARTEL CONSTRUCTION CORP01/17/1997
BISMHISSUEDBARTEL CONSTRUCTION CORP01/17/1997
BISOTISSUEDSEWARD,PARK,HOUSING CORP12/09/1991
3 projects · most recent 02/09/2026
General Wiring
FiledStatusContractorScope
02/09/2026Permit IssuedCAPO ELECTRIC LLCGeneral Wiring
09/25/2025CompleteHIGH QUALITY ELEC.OF NYC—
10/13/2022CompleteALLIANCE ELEVATOR COMPANY—
1 project · most recent 10/01/2025
Masonry
FiledStatusContractorScope
10/01/2025Permit IssuedCITILINE RESTORATION LLCMasonry
1 project · most recent 09/24/2025
Sidewalk Shed
FiledStatusContractorScope
09/24/2025Signed-offKINGS GROUP NY CORPSidewalk Shed
1 project · most recent 09/22/2025
Suspended Scaffold
FiledStatusContractorScope
09/22/2025Permit IssuedCITILINE RESTORATION LLCSuspended Scaffold
1 project · most recent 09/22/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/22/2025Permit IssuedCITILINE RESTORATION LLCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/24/2026Concrete - Cast-In-PlaceHamidreza Sagharispecial
03/24/2026FinalHakan Westergrenprogress
09/26/2025MasonryHamidreza Sagharispecial
09/26/2025Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
09/26/2025FinalHamidreza Saghariprogress
09/26/2025Air barrier - visual inspectionHamidreza Sagharienergy_progress
09/18/2025Post-installed AnchorsMOHAMMAD AHEADspecial
09/18/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
04/25/2024FinalJONAR MADRIAGAprogress
04/25/2024HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
04/25/2024Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
04/25/2024Electrical motors and elevatorsJONAR MADRIAGAenergy_progress
04/25/2024HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
04/25/2024Maintenance informationJONAR MADRIAGAenergy_progress
04/25/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
04/25/2024Post-installed AnchorsJONAR MADRIAGAspecial
04/25/2024Mechanical SystemsJONAR MADRIAGAspecial
10/05/2022FinalAHMED SHAABANprogress
10/15/2021FinalWailoon Wongprogress
10/15/2021Mechanical SystemsWailoon Wongspecial
08/23/2021FinalWailoon Wongprogress
08/23/2021Mechanical SystemsWailoon Wongspecial
▾Documents — 200 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/31/2026M08007307-I1Request digital key ↗
08/31/2026M08007265-I1Request digital key ↗
08/27/2026M01041543-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00443225-I1Request digital key ↗
08/15/2026M00443225-P1Request digital key ↗
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION22
04/12/2019103184634Open ↗
04/12/2019100216197Open ↗
04/12/2019100216197Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION14
07/16/2015121619392Open ↗
07/08/2014121619392Open ↗
07/08/2014121619392Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
04/10/2019121619392Open ↗
02/27/2019102347612Open ↗
02/21/2019121586462Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026M00443225-P1Open ↗
09/01/2026M08007307-I1Open ↗
08/29/2026M01265815-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026M08007265-I1Open ↗
08/18/2026M01371600-I1Open ↗
08/13/2026M01265815-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M00443225-P1Open ↗
09/02/2026M01289540-I1Open ↗
09/02/2026M01289540-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
07/08/2014121619392Open ↗
10/08/2013121602122Open ↗
04/16/2013121586462Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
04/16/2013121586462Open ↗
02/05/2013121449316Open ↗
02/05/2013121449316Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/08/2014121619392Open ↗
10/08/2013121602122Open ↗
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
07/23/2015121619392Open ↗
07/23/2015121619392Open ↗
06/17/2015121619392Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
08/13/2015121619392Open ↗
07/17/2015121619392Open ↗
10/23/2014121619392Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
11/25/2014121619392Open ↗
10/08/2013121602122Open ↗
02/05/2013121449316Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
03/16/2011120544303Open ↗
03/17/2011120544303Open ↗
▸BISEQUIPMENT USE PERMITS1
03/16/2011120544303Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/26/2013121449316Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
12/30/2013121449316Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
02/14/2013121449316Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/08/2014121619392Open ↗
10/08/2013121602122Open ↗
02/14/2013121449316Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
04/16/2013121586462Open ↗
12/17/2012121461952Open ↗
12/17/2012121461765Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026M00443225-P1Open ↗
08/13/2026M00443225-I1Open ↗
08/13/2026M01265815-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01041543-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/14/2013121449316Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/14/2013121449316Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
04/12/2019103519042Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
03/26/2019121619392Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/14/2013121449316Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
04/10/2019121619392Open ↗
03/26/2019121619392Open ↗
02/27/2019102347612Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/16/2013121586462Open ↗
12/17/2012121461952Open ↗
12/17/2012121461765Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/10/2019121619392Open ↗
03/26/2019121619392Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
04/10/2019121619392Open ↗
03/26/2019121619392Open ↗
07/08/2014121619392Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms21
▸BISBOROUGH INTAKE FORM10
04/12/2019103184634Open ↗
04/12/2019101422435Open ↗
04/12/2019100216197Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET6
07/08/2014121619392Open ↗
10/08/2013121602122Open ↗
04/16/2013121586462Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
11/25/2014121619392Open ↗
11/25/2014121619392Open ↗
09/04/2013121449316Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/11/2013121449316Open ↗
03/17/2011120544303Open ↗
▸DOB NOWCalculations1
08/13/2026M01289540-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01289540-I1Open ↗