← Back
BuildNYC
Single or multiple dwelling with stores or offices
465 MARCUS GARVEY BOULEVARD
BROOKLYN · BIN 3047064
💬 Discuss this project
1888Year Built
4Stories
S9Building Class
R6BZoning
7,980 sfGross Floor Area
8Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 465 Jung · 2,100 sf lot · 3.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Stuy Wash N Dry9p · 1 filing · 20 docs
CellarStuy Wash N Dry10p · 1 filing · 20 docs
Site & exteriorAccessory business awning installation1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
465 Jung1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael Ivanhoe McCaw Architect408/17/2023
Albert Montoya Architect108/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSMR Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
High Quality ConstructionGeneral Contractor607/08/2026
A.M.A. HoldingsGeneral Contractor107/08/2026
Aljer Plumbing & HeatingPlumbing107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Michael Ivanhoe McCaw Architects4583408/17/2023
NKM Engineering6244107/07/2022
Building Lifecycle
All (125)Filed (5)Permit Issued (7)Signed Off (2)Violation (60)Inspection (7)Objection (14)Special Inspection (30)
05/04/2026
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
A
04/29/2025
Violation issued (HPD, open)
C
04/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/30/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/21/2024
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACES TO REPLACE EXISTING COMMERCIAL GAS DRYERS, COMMERCIAL WASHER MACHINES AND PROVIDE NEW LAVATORY AND TOILET. FILED IN CONJUNCTION WITH DOB APPLICATION #B00687343-I1.
B00687343-I1
05/20/2024
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACES TO REPLACE EXISTING COMMERCIAL GAS DRYERS, COMMERCIAL WASHER MACHINES AND PROVIDE NEW LAVATORY AND TOILET. FILED IN CONJUNCTION WITH DOB APPLICATION #B00687343-I1.
B00687343-S1
04/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/20/2023
Permit issued — General Construction
B00687343-I1-MS
11/16/2023
Violation issued (ECB, closed)
Construction
11/13/2023
Permit issued — General Construction
B00687343-I1-GC
11/09/2023
Violation issued (HPD, closed)
A
11/09/2023
Violation issued (HPD, closed)
A
11/09/2023
Violation issued (HPD, closed)
A
11/09/2023
Violation issued (HPD, closed)
B
11/09/2023
Violation issued (HPD, open)
B
11/09/2023
Violation issued (HPD, closed)
C
11/09/2023
Violation issued (HPD, closed)
A
11/09/2023
Violation issued (HPD, closed)
A
10/06/2023
Permit issued — Plumbing
B00687343-S1-PL
08/25/2023
Special inspection requirement — Lighting controls
Michael McCaw
08/25/2023
Special inspection requirement — Interior lighting power
Michael McCaw
08/25/2023
Special inspection requirement — Mechanical Systems
Michael McCaw
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael McCaw
08/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael McCaw
08/25/2023
Special inspection requirement — Final
Michael McCaw
08/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
Michael McCaw
08/25/2023
Special inspection requirement — Maintenance information
Michael McCaw
08/17/2023
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACES TO REPLACE EXISTING COMMERCIAL GAS DRYERS, COMMERCIAL WASHER MACHINES AND PROVIDE NEW LAVATORY AND TOILET. FILED IN CONJUNCTION WITH DOB APPLICATION #B00687343-I1.
B00687343-P2
08/14/2023
Special inspection requirement — Interior lighting power
Michael McCaw
08/14/2023
Special inspection requirement — Maintenance information
Michael McCaw
08/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael McCaw
08/14/2023
Special inspection requirement — Mechanical Systems
Michael McCaw
08/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael McCaw
08/14/2023
Special inspection requirement — Final
Michael McCaw
08/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
Michael McCaw
08/14/2023
Special inspection requirement — Lighting controls
Michael McCaw
08/09/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/30/2023
Permit issued — Plumbing
B00687343-S1-PL
03/22/2023
Violation issued (HPD, closed)
A
12/16/2022
Permit issued — General Construction
B00787305-I1-GC
10/12/2022
Objection raised — Other
10/12/2022
Objection resolved — Addressed
10/05/2022
Permit issued — Mechanical Systems
B00687343-I1-GC
10/05/2022
Permit issued — General Construction
B00687343-I1-MS
09/26/2022
Objection raised — Other
09/26/2022
Objection resolved — Addressed
09/22/2022
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACES TO REPLACE EXISTING COMMERCIAL GAS DRYERS, COMMERCIAL WASHER MACHINES AND PROVIDE NEW LAVATORY AND TOILET. FILED IN CONJUNCTION WITH DOB APPLICATION #B00687343-I1.
B00687343-P1
09/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael McCaw
09/19/2022
Special inspection requirement — Fenestration areas
Michael McCaw
09/19/2022
Special inspection requirement — Maintenance information
Michael McCaw
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael McCaw
09/19/2022
Special inspection requirement — Mechanical Systems
Michael McCaw
09/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael McCaw
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction11/20/2023
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction11/13/2023
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp10/06/2023
DOB NOWPlumbingSigned-offAljer Plumbing & Heating03/30/2023
DOB NOWGeneral ConstructionPermit IssuedAMA Holdings12/16/2022
DOB NOWMechanical SystemsSigned-offHigh Quality Construction10/05/2022
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction10/05/2022
BISOTISSUEDLJPY08/20/2022
BISOTISSUEDLJPY11/18/2021
BISOTISSUEDLJPY10/14/2020
BISPLISSUEDQMB Plumbing & Heating05/03/2019
BISMHISSUEDLJPY04/02/2019
BISOTISSUEDLJPY04/02/2019
BISPLISSUEDQMB Plumbing & Heating03/19/2019
BISBLISSUEDQMB Plumbing & Heating03/19/2019
BISPLISSUEDQMB Plumbing & Heating02/21/2018
BISPLISSUEDPeter Plumbing Associates10/11/2017
BISOTISSUEDLee Contractor08/16/2017
BISBLISSUEDPeter Plumbing Associates12/08/2004
BISOTISSUEDStaco System02/05/2003
BISOTISSUEDABC Machinery Coprp01/07/1999
4 projects · most recent 04/18/2024
General Wiring
FiledStatusContractorScope
04/18/2024CompleteKJK ElectricGeneral Wiring
05/12/2021CompleteAll Boro Electric—
04/10/2019CompleteIntelogic ElectricGeneral Wiring
04/06/2018CompleteWilldan Electrical of NY—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/30/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2023Fail-Final General Construction Non-Directive 14FailView ↗
08/09/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/06/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/25/2023Lighting controlsMichael McCawenergy_progress
08/25/2023Interior lighting powerMichael McCawenergy_progress
08/25/2023Mechanical SystemsMichael McCawspecial
08/25/2023Fire-Resistant Penetrations and JointsMichael McCawspecial
08/25/2023Energy Code Compliance InspectionsMichael McCawprogress
08/25/2023FinalMichael McCawprogress
08/25/2023Fire-Resistance Rated ConstructionMichael McCawprogress
08/25/2023Maintenance informationMichael McCawenergy_progress
08/14/2023Interior lighting powerMichael McCawenergy_progress
08/14/2023Maintenance informationMichael McCawenergy_progress
08/14/2023Fire-Resistant Penetrations and JointsMichael McCawspecial
08/14/2023Mechanical SystemsMichael McCawspecial
08/14/2023Energy Code Compliance InspectionsMichael McCawprogress
08/14/2023FinalMichael McCawprogress
08/14/2023Fire-Resistance Rated ConstructionMichael McCawprogress
08/14/2023Lighting controlsMichael McCawenergy_progress
09/19/2022HVAC-R and service water piping design and insulationMichael McCawenergy_progress
09/19/2022Fenestration areasMichael McCawenergy_progress
09/19/2022Maintenance informationMichael McCawenergy_progress
09/19/2022Fire-Resistant Penetrations and JointsMichael McCawspecial
09/19/2022Mechanical SystemsMichael McCawspecial
09/19/2022Energy Code Compliance InspectionsMichael McCawprogress
09/19/2022FinalMichael McCawprogress
09/19/2022Fire-Resistance Rated ConstructionMichael McCawprogress
09/19/2022Fenestration air leakageMichael McCawenergy_progress
Latest 25 of 32.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Stuy Wash N DryPersonal servicesCellar, Floor 1
Project B00687343 Alteration · LOC Issued · 06/29/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/29/2026B00687343-S1Request digital key ↗
08/29/2026B00687343-P2Request digital key ↗
08/29/2026B00687343-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION9
05/22/2019301865943Open ↗
01/17/2019321424259Open ↗
01/17/2019321424259Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION7
04/03/2019301865943Open ↗
04/03/2019321424259Open ↗
03/20/2019301865943Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLPC Approval/Permit5
08/29/2026B00687343-P2Open ↗
08/29/2026B00687343-P1Open ↗
08/29/2026B00687343-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
01/02/2019321424259Open ↗
04/20/2018321424259Open ↗
10/03/2017321424259Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature24
08/25/2026B00687343-P2Open ↗
08/25/2026B00687343-P2Open ↗
08/25/2026B00687343-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/26/2026B00687343-S1Open ↗
08/26/2026B00687343-S1Open ↗
08/25/2026B00687343-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/30/2019301865943Open ↗
09/13/2018301865943Open ↗
10/12/2017321424259Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026B00687343-I1Open ↗
08/29/2026B00687343-P2Open ↗
08/29/2026B00687343-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/20/2019321424259Open ↗
01/16/2019301865943Open ↗
10/25/2017321424259Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
05/22/2019301865943Open ↗
09/13/2018301865943Open ↗
07/22/2016321424259Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
01/17/2019321424259Open ↗
01/17/2019301865943Open ↗
07/22/2016321424259Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00687343-P2Open ↗
08/29/2026B00687343-P1Open ↗
08/29/2026B00687343-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/22/2016321424259Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
09/30/2019301865943Open ↗
09/13/2018301865943Open ↗
10/12/2017321424259Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/14/2026B00687343-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSUPERSEDING LETTER5
04/03/2019301865943Open ↗
04/03/2019321424259Open ↗
03/20/2019301865943Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/30/2019301865943Open ↗
▸BISLANDMARKS APPROVAL1
09/09/2016321424259Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/30/2019301865943Open ↗
07/22/2016321424259Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION9
05/23/2019301865943Open ↗
05/22/2019301865943Open ↗
03/05/2019321424259Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM3
09/30/2019301865943Open ↗
05/22/2019301865943Open ↗
01/17/2019321424259Open ↗
▸BISEFILING COVER SHEET1
07/22/2016321424259Open ↗