← Back
BuildNYC
Church, synagogue, chapel
Our Lady of Lourdes Catholic Church
465 WEST 142ND STREET · Name © OpenStreetMap contributors · BIN 1061250
💬 Discuss this project
1904Year Built
1Stories
M1Building Class
R6AZoning
6,633 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Church, synagogue, chapel · 7,494 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Our Lady of Lourdes Roman Catholic Church2p · 1 filing · 7 docs
MezzanineOur Lady of Lourdes Roman Catholic Church3p · 1 filing · 7 docs
Site & exteriorOur Lady of Lourdes Roman Catholic Church2p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Church of Our Lady of Lourdes807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vincent J. Liotta P.E106/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Henry Y. MannElectrical203/21/2026
Gem Air Conditioningspecialty_contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vincent J. Liotta P. E1974106/09/2023
Building Lifecycle
All (13)Filed (1)Permit Issued (2)Signed Off (1)Violation (3)Special Inspection (6)
07/08/2024
Signed off — Alteration
INSTALLATION OF SPLIT SYSTEM ON FLOORS 001, MEZ001, AND OSP WITH A TOTAL CAPACITY OF 28 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00872987-I1
12/06/2023
Permit issued — Mechanical Systems
M00872987-I1-MS
06/13/2023
Permit issued — Mechanical Systems
M00872987-I1-MS
06/09/2023
Filed — Alteration
INSTALLATION OF SPLIT SYSTEM ON FLOORS 001, MEZ001, AND OSP WITH A TOTAL CAPACITY OF 28 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00872987-I1
05/10/2023
Special inspection requirement — Mechanical Systems
Vincent Liotta
05/10/2023
Special inspection requirement — Final
Vincent Liotta
05/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
05/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
05/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
05/10/2023
Special inspection requirement — Maintenance information
Vincent Liotta
04/01/2019
Violation issued (ECB, open)
Construction
03/19/2003
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGem Air Conditioning12/06/2023
DOB NOWMechanical SystemsSigned-offGem Air Conditioning06/13/2023
BISBLISSUEDThe Wizard of Heating Repair03/01/2017
BISBLISSUEDThe Wizard of Heating Repair03/22/2016
BISEQISSUEDColgate Scaffolding & Equipment05/08/2000
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/10/2023Mechanical SystemsVincent Liottaspecial
05/10/2023FinalVincent Liottaprogress
05/10/2023HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
05/10/2023HVAC-R and service water heating equipmentVincent Liottaenergy_progress
05/10/2023HVAC-R and service water heating system controlsVincent Liottaenergy_progress
05/10/2023Maintenance informationVincent Liottaenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Our Lady of Lourdes Roman Catholic ChurchReligiousFloor 1, Mezzanine
Project M00872987 Alteration · LOC Issued · 06/09/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/31/2026M00872987-I1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
04/04/2016122730018Open ↗
04/04/2016122730018Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/04/2016122730018Open ↗
▸DOB NOWLPC Approval/Permit1
08/13/2026M00872987-I1Open ↗
▸Seals & Professional Certifications8
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/26/2018122730018Open ↗
04/04/2016122730018Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M00872987-I1Open ↗
08/25/2026M00872987-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/04/2016122730018Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/04/2016122730018Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M00872987-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M00872987-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/04/2016122730018Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/04/2016122730018Open ↗
04/04/2016122730018Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00872987-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/26/2018122730018Open ↗
04/04/2016122730018Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/26/2018122730018Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/26/2018122730018Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00872987-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
04/04/2016122730018Open ↗
▸BISBOROUGH INTAKE FORM1
01/26/2018122730018Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/26/2018122730018Open ↗
04/05/2016122730018Open ↗
04/05/2016122730018Open ↗