Two family brick
465A HALSEY STREET
BROOKLYN · BIN 3046109
💬 Discuss this project
1885Year Built
3Stories
B1Building Class
R6BZoning
2,728 sfGross Floor Area
2Units
Two family brick · 1,667 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
Architecture
Floor 37p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2025$2.5M—MILES EQUITIES LLC → Private party$916/sf building
07/17/2023$1.1M—Private party → MILES EQUITIES LLC$422/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN301/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LIAN CONSTRUCTION GROUP LGeneral Contractor407/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYED ENGINEERING, P.C.7054301/21/2025
Building Lifecycle
All (66)Filed (3)Permit Issued (3)Signed Off (1)Inspection (7)Objection (22)Special Inspection (30)
02/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
RAFI HAMID
02/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
RAFI HAMID
02/07/2025
Special inspection requirement — Air barrier - visual inspection
RAFI HAMID
02/07/2025
Special inspection requirement — Fenestration air leakage
RAFI HAMID
02/07/2025
Special inspection requirement — Fenestration areas
RAFI HAMID
02/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RAFI HAMID
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
02/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAFI HAMID
02/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
RAFI HAMID
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
02/07/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
RAFI HAMID
02/07/2025
Special inspection requirement — Maintenance information
RAFI HAMID
02/07/2025
Special inspection requirement — Interior lighting power
RAFI HAMID
02/05/2025
Objection resolved — Addressed
01/28/2025
Objection raised — Structural
01/21/2025
Filed — Alteration CO
INTERIOR RENOVATION AND REDESIGN OF APARTMENT CONFIGURATION (DIFFERENT FROM EXISTING CO#199325) WITHIN EXISTING (3) THREE STORIES &BASEMENT, (2) TWO FAMILY DWELLING. NEW DRYWALL PARTITIONS AND PLUMBING FIXTURES AS PER PLANS.
B00874717-P1
01/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
01/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAFI HAMID
01/20/2025
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
01/20/2025
Special inspection requirement — Final
NAVEEN KUMAR
01/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
RAFI HAMID
01/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
RAFI HAMID
01/20/2025
Special inspection requirement — Air barrier - visual inspection
RAFI HAMID
01/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RAFI HAMID
01/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
RAFI HAMID
01/20/2025
Special inspection requirement — Fenestration air leakage
RAFI HAMID
01/20/2025
Special inspection requirement — Interior lighting power
RAFI HAMID
01/20/2025
Special inspection requirement — Maintenance information
RAFI HAMID
01/20/2025
Special inspection requirement — Fenestration areas
RAFI HAMID
01/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
RAFI HAMID
01/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/07/2025
Signed off — Alteration
Installation of new gas fired equipment and plumbing fixtures for the renovation and of the two family dwelling. Filed in conjunction with ALT I application number B00874717-I1
B00965931-I1
12/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/05/2024
Permit issued — General Construction
B00874717-I1-GC-CX
03/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Permit issued — Plumbing
B00965931-I1-PL
11/27/2023
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures for the renovation and of the two family dwelling. Filed in conjunction with ALT I application number B00874717-I1
B00965931-I1
11/21/2023
Special inspection requirement — Maintenance information
RAFI HAMID
11/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
RAFI HAMID
09/05/2023
Permit issued — General Construction
B00874717-I1-GC-CX
08/25/2023
Objection resolved — Addressed
08/21/2023
Objection raised — Inspections
08/21/2023
Objection resolved — Addressed
08/11/2023
Objection resolved — Addressed
08/10/2023
Objection resolved — Addressed
07/10/2023
Objection raised — Admin
06/30/2023
Objection resolved — Addressed
06/30/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/12/2023
Objection raised — Fire_Protection
06/12/2023
Objection raised — Fire_Protection
06/12/2023
Objection raised — Other
06/12/2023
Objection raised — Admin
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLIAN CONSTRUCTION GROUP L09/05/2024
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN01/03/2024
DOB NOWGeneral ConstructionPermit IssuedLIAN CONSTRUCTION GROUP L09/05/2023
1 project · most recent 12/10/2024
General Wiring Lighting
FiledStatusContractorScope
12/10/2024CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring, Lighting
1 project · most recent 01/21/2025
FiledStatusContractorScope
01/21/2025Permit IssuedLIAN CONSTRUCTION GROUP L2 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
02/07/2025Fenestration and door U-factor and product ratingsRAFI HAMIDenergy_progress
02/07/2025HVAC-R and service water heating system controlsRAFI HAMIDenergy_progress
02/07/2025Air barrier - visual inspectionRAFI HAMIDenergy_progress
02/07/2025Fenestration air leakageRAFI HAMIDenergy_progress
02/07/2025Fenestration areasRAFI HAMIDenergy_progress
02/07/2025HVAC-R and service water piping design and insulationRAFI HAMIDenergy_progress
02/07/2025Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
02/07/2025Structural Stability – Alterations of existing buildingsRAFI HAMIDspecial
02/07/2025Fire-Resistance Rated ConstructionRAFI HAMIDprogress
02/07/2025Energy Code Compliance InspectionsRAFI HAMIDprogress
02/07/2025FinalNAVEEN KUMARprogress
02/07/2025HVAC-R and service water heating equipmentRAFI HAMIDenergy_progress
02/07/2025Maintenance informationRAFI HAMIDenergy_progress
02/07/2025Interior lighting powerRAFI HAMIDenergy_progress
01/20/2025Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
01/20/2025Structural Stability – Alterations of existing buildingsRAFI HAMIDspecial
01/20/2025Energy Code Compliance InspectionsRAFI HAMIDprogress
01/20/2025FinalNAVEEN KUMARprogress
01/20/2025Fire-Resistance Rated ConstructionRAFI HAMIDprogress
01/20/2025HVAC-R and service water heating equipmentRAFI HAMIDenergy_progress
01/20/2025Air barrier - visual inspectionRAFI HAMIDenergy_progress
01/20/2025HVAC-R and service water piping design and insulationRAFI HAMIDenergy_progress
01/20/2025HVAC-R and service water heating system controlsRAFI HAMIDenergy_progress
01/20/2025Fenestration air leakageRAFI HAMIDenergy_progress
01/20/2025Interior lighting powerRAFI HAMIDenergy_progress
Latest 25 of 34.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00965931-I1Request digital key ↗
08/14/2026B00874717-I1Request digital key ↗
08/14/2026B00874717-P1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/14/2026B00874717-I1Open ↗
08/13/2026B00965931-I1Open ↗
08/13/2026B00874717-P1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature29
08/28/2026B00965931-I1Open ↗
08/28/2026B00965931-I1Open ↗
08/28/2026B00965931-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B00965931-I1Open ↗
08/25/2026B00874717-I1Open ↗
08/25/2026B00874717-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026B00874717-I1Open ↗
08/23/2026B00874717-P1Open ↗
08/13/2026B00965931-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/14/2026B00874717-I1Open ↗
08/14/2026B00874717-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/14/2026B00874717-I1Open ↗
08/14/2026B00874717-P1Open ↗
08/13/2026B00965931-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/14/2026B00874717-I1Open ↗
08/14/2026B00874717-P1Open ↗
▸DOB NOWFinal Survey1
08/14/2026B00874717-I1Open ↗