HPD04/19/2020§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY
HPD05/19/2014SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS INCANDESCENT LIGHT REQUIRED. LIGHT FIXTURE PRESENT. AT FRONT AREAWAY
DOB08/16/1993V-DOB VIOLATION - ACTIVE
Four families · 2,479 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.