← Back
Miscellaneous religious facility
467 36 STREET
BROOKLYN · BIN 3010280
💬 Discuss this project
1901Year Built
3Stories
M9Building Class
M1-2Zoning
4,000 sfGross Floor Area
3Units
22 Open Violations ▸FDNY Report ↗
Miscellaneous religious facility · 2,003 sf lot · 2 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof2p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar5p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACTS CHRISTIAN CHURCH1007/08/2026
NYC SCHOOL CONSTRUCTION AUTHORITY1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PURCELL EVERETT ARCHITECTS1003/21/2026
DSENY ENGINEERING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEL-TECH CONSTRUCTION INCGeneral Contractor407/08/2026
HIGH BEAM ELECTRIC CORP.Electrical103/22/2026
ABC CONSTRUCTION CONT INCGeneral Contractor107/08/2026
JON ADAMOGeneral Contractor107/08/2026
K & Y PLBG AND HTG INCPlumbing107/08/2026
VARSITY PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137207/14/2023
UNIVERSAL TESTING AND INS400209/01/2022
Building Lifecycle
All (64)Filed (15)Permit Issued (7)Signed Off (3)Violation (25)Inspection (7)Special Inspection (7)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/08/2023
Signed off — Alteration
B00790689-I1
09/06/2023
Filed — Alteration
REMOVE BOILER AND RELOCATE GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00872684-P5
09/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2023
Filed — Alteration
REMOVE BOILER AND RELOCATE GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00872684-P4
08/19/2023
Filed — Alteration
REMOVE BOILER AND RELOCATE GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00872684-P3
07/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/20/2023
Permit issued — Plumbing
B00872684-I1-PL
07/18/2023
Filed — Alteration
REMOVE BOILER AND RELOCATE GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00872684-P2
07/15/2023
Permit issued — Mechanical Systems
B00872684-S1-MS
07/14/2023
Filed — Alteration
REMOVE BOILER AND RELOCATE GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00872684-P1
07/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
SHAHIN BADALY
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2023
Filed — Alteration
REMOVE BOILER AND RELOCATE GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00872684-S1
05/25/2023
Filed — Alteration
REMOVE BOILER AND RELOCATE GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00872684-I1
05/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
SHAHIN BADALY
05/10/2023
Special inspection requirement — Final
John Alleyne
05/10/2023
Special inspection requirement — Mechanical Systems
SHAHIN BADALY
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2023
Signed off — Alteration
B00790280-I1
02/07/2023
Signed off — Alteration
Reroute existing gas meter vent piping and pressure test gas piping in the Basement for leaks
B08022386-I1
01/31/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/19/2023
Filed — Alteration
Reroute existing gas meter vent piping and pressure test gas piping in the Basement for leaks
B08022386-P3
01/11/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/04/2023
Filed — Alteration
Reroute existing gas meter vent piping and pressure test gas piping in the Basement for leaks
B08022386-P2
12/30/2022
Filed — Alteration
Reroute existing gas meter vent piping and pressure test gas piping in the Basement for leaks
B08022386-P1
11/21/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/02/2022
Permit issued — Plumbing
B08022386-I1-PL
10/18/2022
Filed — Alteration
Reroute existing gas meter vent piping and pressure test gas piping in the Basement for leaks
B08022386-I1
10/01/2022
Permit issued — General Construction
B00790280-I1-GC
09/09/2022
Permit issued — Structural
B00790689-I1-ST
09/01/2022
Filed — Alteration
B00790280-I1
09/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
09/01/2022
Special inspection requirement — Masonry
NELSON LOPEZ
08/24/2022
Permit issued — Sidewalk Shed
B00794706-I1-SH
08/24/2022
Permit issued — Construction Fence
B00795467-I1-FN
08/22/2022
Filed — Alteration
B00795467-I1
08/22/2022
Filed — Alteration
B00794706-I1
08/16/2022
Filed — Alteration
B00790689-I1
08/09/2022
Special inspection requirement — Final
NELSON LOPEZ
08/04/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offK & Y PLBG AND HTG INC07/20/2023
DOB NOWMechanical SystemsPermit IssuedJON ADAMO07/15/2023
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC11/02/2022
DOB NOWGeneral ConstructionSigned-offABC CONSTRUCTION CONT INC10/01/2022
DOB NOWStructuralSigned-offKEL-TECH CONSTRUCTION INC09/09/2022
DOB NOWSidewalk ShedPermit IssuedKEL-TECH CONSTRUCTION INC08/24/2022
DOB NOWConstruction FencePermit IssuedKEL-TECH CONSTRUCTION INC08/24/2022
1 project · most recent 09/06/2023
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/06/2023Permit IssuedJON ADAMOHeating and Air Conditioning Systems
1 project · most recent 09/06/2023
Gas
FiledStatusContractorScope
09/06/2023Signed-offK & Y PLBG AND HTG INCGas
3 projects · most recent 08/11/2023
General Wiring
FiledStatusContractorScope
08/11/2023CompleteHIGH BEAM ELECTRIC CORP.General Wiring
07/17/2023CompleteHIGH BEAM ELECTRIC CORP.General Wiring
09/17/2020Permit IssuedJOSEPH WEINSTEIN ELECTRIC1 meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/14/2023Tenant Protection Plan ComplianceSHAHIN BADALYspecial
05/25/2023Tenant Protection Plan ComplianceSHAHIN BADALYspecial
05/10/2023FinalJohn Alleyneprogress
05/10/2023Mechanical SystemsSHAHIN BADALYspecial
09/01/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
09/01/2022MasonryNELSON LOPEZspecial
08/09/2022FinalNELSON LOPEZprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Acts Christian ChurchOtherCellar, Floors 1–3
Project B00790280 Alteration · LOC Issued · 09/01/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/28/2026B00790689-I1Request digital key ↗
08/28/2026B00794706-I1Request digital key ↗
08/28/2026B00795467-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026B00790689-I1Open ↗
08/28/2026B00794706-I1Open ↗
08/28/2026B00795467-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B00790280-I1Open ↗
08/22/2026B00872684-S1Open ↗
08/22/2026B00872684-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00790280-I1Open ↗
08/22/2026B00872684-S1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026B00790689-I1Open ↗
08/28/2026B00790280-I1Open ↗
08/28/2026B00790280-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B08022386-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/28/2026B00794706-I1Open ↗
08/28/2026B00790280-S1Open ↗
08/13/2026B00795467-I1Open ↗
Showing 3 of 4 on file for this type