← Back
Elevator apt, fireproof with stores
Ainslie Tower
467 KEAP STREET · BIN 3396771
💬 Discuss this project
2009Year Built
10Stories
D6Building Class
M1-2/R6Zoning
77,664 sfGross Floor Area
30Units
LL97 CoveredRent Stabilized58 Open Violations 55 unresolved · 3 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof with stores · 16,952 sf lot · 4.58 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbingGeneral
Floor 110p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOB SERVICES407/08/2026
SUN SUN CONTRACTING1307/08/2026
AINSILIE TOWER5703/22/2026
CSC403/22/2026
FORSYH CONSTRUCTION INC2803/22/2026
CSC FO NY INC103/22/2026
TOWERS2503/21/2026
ANISLIE TOWER403/21/2026
PSG CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&S DESIGN COLLABORATIVE605/30/2026
LUCID BUILDING ENGINEERING P.C.110/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A S DESIGN COLLABORATIVE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH HUANGElectrical103/21/2026
LAWRENCE NELSONElectrical103/21/2026
LENS ELECTRIC, INCElectrical103/22/2026
IVENKO INCGeneral Contractor104/09/2026
ALTAIR PLUMBING AND HEATPlumbing107/08/2026
SKYHIGH MURALS-COLOSSALScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WELLDONE INSPECTION INC.8628605/30/2026
Building Lifecycle
All (99)Filed (7)Permit Issued (3)Signed Off (3)Violation (60)Inspection (4)Objection (3)Special Inspection (19)
07/02/2026
Objection resolved — Open
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
05/30/2026
Filed — Alteration CO
NON-STRUCTURAL INTERIOR RENOVATION OF EXISTING NON-PLACE OF ASSEMBLY BUSINESS SPACE INCLUDING NEW FINISHES, FIXTURE, AND PARTITION. UPDATE CERTIFICATE OF OCCUPANCY INACCURATE INFORMATION AS PART OF THIS APPLICATION.
B01406468-I1
05/05/2026
Signed off — Alteration
Removal of existing bathrooms and installation of new restrooms, shower rooms, drinking fountain, and an electric hot water heater. No change in use, occupancy, or egress
B01219156-I1
03/23/2026
Violation issued (HPD, open)
C
02/25/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, closed)
A
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
01/05/2026
Signed off — Alteration
PROPOSE NEW ILLUMINATED HANGING LETTERING LIGHT BOX FOR EXISTING COMMERCIAL SPACE. NO CJANGE TO USE, EGRESS OR OCCUPANCY.
B01308534-I1
12/31/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
11/20/2025
Signed off — Alteration
Removal of existing bathrooms and installation of new restrooms, shower rooms, drinking fountain, and an electric hot water heater. No change in use, occupancy, or egress
B01219156-S5
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Permit issued — Sign
B01308534-I1-SG
10/30/2025
Filed — Alteration
PROPOSE NEW ILLUMINATED HANGING LETTERING LIGHT BOX FOR EXISTING COMMERCIAL SPACE. NO CJANGE TO USE, EGRESS OR OCCUPANCY.
B01308534-I1
10/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/23/2025
Filed — Alteration
Removal of existing bathrooms and installation of new restrooms, shower rooms, drinking fountain, and an electric hot water heater. No change in use, occupancy, or egress
B01219156-P2
09/23/2025
Filed — Alteration
Removal of existing bathrooms and installation of new restrooms, shower rooms, drinking fountain, and an electric hot water heater. No change in use, occupancy, or egress
B01219156-P3
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Chiwa Yeung
09/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Chiwa Yeung
09/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Chiwa Yeung
09/18/2025
Special inspection requirement — Maintenance information
Chiwa Yeung
09/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Chiwa Yeung
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIUFAN JIANG
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Chiwa Yeung
09/18/2025
Special inspection requirement — Final
Chiwa Yeung
09/18/2025
Special inspection requirement — Lighting controls
Chiwa Yeung
09/18/2025
Special inspection requirement — Interior lighting power
Chiwa Yeung
09/10/2025
Permit issued — Plumbing
B01219156-S5-PL
09/05/2025
Permit issued — General Construction
B01219156-I1-GC
07/24/2025
Filed — Alteration
Removal of existing bathrooms and installation of new restrooms, shower rooms, drinking fountain, and an electric hot water heater. No change in use, occupancy, or egress
B01219156-P1
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
07/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Chiwa Yeung
07/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Chiwa Yeung
07/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Chiwa Yeung
07/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Chiwa Yeung
07/24/2025
Special inspection requirement — Maintenance information
Chiwa Yeung
07/23/2025
Filed — Alteration
Removal of existing bathrooms and installation of new restrooms, shower rooms, drinking fountain, and an electric hot water heater. No change in use, occupancy, or egress
B01219156-S5
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
C
07/23/2025
Violation issued (HPD, closed)
C
07/23/2025
Violation issued (HPD, closed)
C
07/22/2025
Filed — Alteration
Removal of existing bathrooms and installation of new restrooms, shower rooms, drinking fountain, and an electric hot water heater. No change in use, occupancy, or egress
B01219156-I1
04/08/2025
Violation issued (ECB, open)
Local Law
03/26/2025
Violation issued (HPD, closed)
C
03/07/2025
Violation issued (HPD, closed)
B
03/07/2025
Violation issued (HPD, closed)
C
03/07/2025
Violation issued (HPD, closed)
A
03/07/2025
Violation issued (HPD, closed)
B
03/07/2025
Violation issued (HPD, closed)
B
03/07/2025
Violation issued (HPD, closed)
B
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offLONG SHOT CRANE LLC11/03/2025
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT09/10/2025
DOB NOWGeneral ConstructionSigned-offIVENKO INC09/05/2025
BISOTISSUEDILE CONSTRUCTION GROUP IN09/06/2016
BIS—ISSUEDSUN SUN CONTRACTING INC.06/24/2015
BISOTISSUEDFORSYTH CONSTRUCTION INC12/05/2011
BIS—ISSUEDFORSYTH CONSTRUCTION INC11/15/2011
BISEQISSUEDFORSYTH CONSTRUCTION INC11/14/2011
BISPLISSUEDTRUFLOW PLBG & HTG, LLC08/09/2011
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE07/01/2011
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE06/29/2011
BISEQISSUEDCSC OF NY INC05/20/2011
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE05/02/2011
BISCCISSUEDFORSYTH CONSTRUCTION INC03/17/2011
BISCCISSUEDFORSYTH CONSTRUCTION INC03/17/2011
BISMHISSUEDFORSYTH CONSTRUCTION INC01/26/2011
BISEQISSUEDFORSYTH CONSTRUCTION INC01/26/2011
BISEQISSUEDFORSYTH CONSTRUCTION INC01/26/2011
BIS—ISSUEDFORSYTH CONSTRUCTION INC01/26/2011
BISSPISSUEDDC BUILDING SERVICES INC01/20/2011
BISPLISSUEDTRUFLOW PLBG & HTG, LLC07/01/2010
BIS—ISSUEDFORSYTH CONSTRUCTION INC02/12/2010
BISEQISSUEDCSC OF NY INC02/10/2010
BIS—ISSUEDFORSYTH CONSTRUCTION INC02/08/2010
BISEQISSUEDFORSYTH CONSTRUCTION INC02/05/2010
BISEQISSUEDFORSYTH CONSTRUCTION INC02/05/2010
BISMHISSUEDFORSYTH CONSTRUCTION INC02/05/2010
BIS—ISSUEDFORSYTH CONSTRUCTION INC02/04/2010
BISEQISSUEDFORSYTH CONSTRUCTION INC02/04/2010
BISEQISSUEDFORSYTH CONSTRUCTION INC02/01/2010
BISSDISSUEDDC BUILDING SERVICES INC01/14/2010
BISSPISSUEDDC BUILDING SERVICES INC01/12/2010
BISEQISSUEDFORSYTH CONSTRUCTION INC12/30/2009
BIS—ISSUEDFORSYTH CONSTRUCTION INC07/27/2009
BISPLISSUEDTRUFLOW PLBG & HTG, LLC06/24/2009
BISOTISSUEDFORSYTH CONSTRUCTION INC06/19/2009
BISMHISSUEDFORSYTH CONSTRUCTION INC06/19/2009
BISEQISSUEDFORSYTH CONSTRUCTION INC06/17/2009
BISEQISSUEDCSC OF NY INC05/15/2009
BISOTISSUEDFORSYTH CONSTRUCTION INC04/20/2009
+ 6 more permits on file
1 project · most recent 09/23/2025
Water/Sanitary
FiledStatusContractorScope
09/23/2025Signed-offALTAIR PLUMBING AND HEATWater/Sanitary
2 projects · most recent 10/30/2025
General Wiring
FiledStatusContractorScope
10/30/2025CompleteVOLTRON ELECTRIC LLC—
09/10/2025CompleteLENS ELECTRIC, INCGeneral Wiring
1 project · most recent 09/23/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/23/2025Signed-offALTAIR PLUMBING AND HEATTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/31/2025Pass-Final Sign Permit InspectionPassView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/18/2025Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
09/18/2025Tenant Protection Plan Compliance—special
09/18/2025Energy Code Compliance InspectionsChiwa Yeungprogress
09/18/2025HVAC-R and service water heating system controlsChiwa Yeungenergy_progress
09/18/2025HVAC-R and service water heating equipmentChiwa Yeungenergy_progress
09/18/2025Maintenance informationChiwa Yeungenergy_progress
09/18/2025HVAC-R and service water piping design and insulationChiwa Yeungenergy_progress
09/18/2025Tenant Protection Plan ComplianceQIUFAN JIANGspecial
09/18/2025Energy Code Compliance InspectionsChiwa Yeungprogress
09/18/2025FinalChiwa Yeungprogress
09/18/2025Lighting controlsChiwa Yeungenergy_progress
09/18/2025Interior lighting powerChiwa Yeungenergy_progress
07/24/2025Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
07/24/2025Tenant Protection Plan Compliance—special
07/24/2025Energy Code Compliance InspectionsChiwa Yeungprogress
07/24/2025HVAC-R and service water heating system controlsChiwa Yeungenergy_progress
07/24/2025HVAC-R and service water heating equipmentChiwa Yeungenergy_progress
07/24/2025HVAC-R and service water piping design and insulationChiwa Yeungenergy_progress
07/24/2025Maintenance informationChiwa Yeungenergy_progress
▾Documents — 409 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01219156-I1Request digital key ↗
08/20/2026B01219156-P3Request digital key ↗
08/20/2026B01219156-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits78
▸BISWORK PERMIT APPLICATION39
09/06/2016340403762Open ↗
08/29/2016340403762Open ↗
06/29/2015321047675Open ↗
Showing 3 of 39 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION37
08/29/2016340403762Open ↗
06/24/2015321047675Open ↗
12/15/2014321047675Open ↗
Showing 3 of 37 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/04/2011320271843Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/29/2015321047675Open ↗
▸Seals & Professional Certifications80
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
12/15/2014321047675Open ↗
10/01/2012320034618Open ↗
10/01/2012320034618Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/29/2026B01219156-P3Open ↗
08/29/2026B01219156-P3Open ↗
08/29/2026B01219156-P3Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
05/03/2011320300786Open ↗
07/16/2010320188710Open ↗
Showing 2 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/03/2011320300786Open ↗
07/16/2010320188710Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01219156-P3Open ↗
08/20/2026B01219156-P2Open ↗
08/20/2026B01219156-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B01219156-P3Open ↗
08/24/2026B01219156-P2Open ↗
08/22/2026B01219156-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/29/2016340403762Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/29/2016340403762Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/29/2016340403762Open ↗
▸Trade Schedules & Equipment45
▸BISSELF-CERT PLUMBING NOTICE12
02/06/2012320045394Open ↗
02/06/2012320034903Open ↗
01/23/2012320045394Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING8
08/29/2016340403762Open ↗
12/27/2011320034903Open ↗
12/20/2011320034903Open ↗
Showing 3 of 8 on file for this type
▸BISWATER METER PERMIT : DEP-METER8
02/06/2012320045394Open ↗
02/06/2012320045394Open ↗
01/23/2012320045394Open ↗
Showing 3 of 8 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B7
02/06/2012320045394Open ↗
02/06/2012320045394Open ↗
01/23/2012320045394Open ↗
Showing 3 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
01/23/2012320045394Open ↗
01/23/2012320045394Open ↗
▸BISSTANDPIPE INSP REPORT : FP-842
02/06/2012320045394Open ↗
02/06/2012320045394Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/19/2012320034903Open ↗
Showing 1 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
02/06/2012320045394Open ↗
02/06/2012320045394Open ↗
▸BISEQUIPMENT USE PERMITS1
10/19/2012320034903Open ↗
▸BISSEWER CUT-OFF1
11/14/2011320034903Open ↗
▸Safety & Tenant Protection28
▸BISSTREET TREE CHECKLIST10
12/15/2014321047675Open ↗
Showing 1 of 10 on file for this type
▸BISANTI-HARASSMENT CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist6
08/13/2026B01308534-I1Open ↗
08/13/2026B01219156-I1Open ↗
08/13/2026B01219156-P2Open ↗
Showing 3 of 6 on file for this type
▸BISST-1 Street Tree Checklist3
03/22/2011320271843Open ↗
03/21/2011320271852Open ↗
03/21/2011320271861Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos29
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER22
05/03/2011320300786Open ↗
03/01/2011320271852Open ↗
03/01/2011320271843Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026B01219156-I1Open ↗
08/13/2026B01219156-P2Open ↗
08/13/2026B01219156-S5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026B01219156-S5Open ↗
08/13/2026B01219156-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
08/29/2016340403762Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/29/2016340403762Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/29/2016340403762Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
09/05/2012320034618Open ↗
09/05/2012320034618Open ↗
09/05/2012320034618Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/05/2012320034618Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/29/2016340403762Open ↗
▸Approvals, Objections & Sign-offs69
▸BISADMINISTRATIVE OBJECTIONS24
12/15/2014321047675Open ↗
09/29/2011320363352Open ↗
05/03/2011320300786Open ↗
Showing 3 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
08/25/2015321047675Open ↗
11/14/2012320034618Open ↗
11/09/2012310133192Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
08/25/2015320363352Open ↗
10/12/2012320271843Open ↗
10/12/2012320271843Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE4
12/15/2014321047675Open ↗
12/15/2014321047675Open ↗
12/15/2014321047675Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - FIRE SVC : DEP-FIRE3
02/06/2012320045394Open ↗
01/23/2012320045394Open ↗
11/14/2011320034903Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
11/14/2011320034903Open ↗
▸BISSHED LETTER1
07/07/2011320300786Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
08/29/2016340403762Open ↗
12/15/2014321047675Open ↗
Showing 2 of 14 on file for this type
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/12/2012320271843Open ↗
▸Filing & Intake Forms26
▸BISEFILING COVER SHEET21
12/15/2014321047675Open ↗
09/29/2011320363352Open ↗
05/03/2011320300786Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION3
02/06/2012320188710Open ↗
03/05/2010320036064Open ↗
03/05/2010320036064Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/29/2016340403762Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/04/2011320271843Open ↗
▸Other Documents24
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS12
10/12/2012320271843Open ↗
10/11/2012320036064Open ↗
10/04/2012310133192Open ↗
Showing 3 of 12 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED8
12/02/2011320363352Open ↗
03/04/2011320271843Open ↗
Showing 2 of 8 on file for this type
▸BISDRY PIPE VALVE TEST : FP-102
01/23/2012320045394Open ↗
01/23/2012320045394Open ↗
▸BISPLOT DIAGRAM1
12/15/2014321047675Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
10/12/2012320271843Open ↗