← Back
Two family converted from one family
467 LEXINGTON AVENUE
BROOKLYN · BIN 3050488
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,400 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: 467 LEX GROUP LLC · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction19p · 1 filing · 20 docs
Floor 2Under Construction25p · 1 filing · 20 docs
Floor 1Under Construction25p · 1 filing · 20 docs
CellarUnder Construction25p · 1 filing · 20 docs
Sub-BasementUnder Construction22p · 1 filing · 20 docs
1 job · most recent 05/31/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/31/2026Permit IssuedPLBG P & H INCGas, Water/Sanitary
1 job · most recent 03/14/2024
FiledStatusContractorScope
03/14/2024CompleteCITY ELECTRIC LLC3 meters, 3 new_meters
1 job · most recent 05/31/2026
Steel Concrete
FiledStatusContractorScope
05/31/2026Permit IssuedPLBG P & H INCSteel, Concrete
Building Lifecycle
All (105)Filed (5)Permit Issued (6)Inspection (10)Objection (54)Special Inspection (30)
08/17/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Open
07/10/2026
Objection resolved — Open
07/06/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2026
Objection raised — Scope
06/23/2026
Objection raised — Scope
06/23/2026
Objection raised — Scope
05/31/2026
Filed — Alteration
INTERIOR RENOVATION OF EXG 2 STORY, 2 FAMILY. NEW DRYWALL PARTITIONS, FINISH FLOORING, NEW INTERIOR DOORS, NEW TILES, KITCHEN, BATHROOM, AND NEW PLBG FIXTURES AS PER PLANS. HORIZONTAL ENLGMT AND METAL DECK AT REAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01018185-P3
05/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
AKM RAHMAN
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
05/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
AKM RAHMAN
05/27/2026
Special inspection requirement — Structural Steel - Details
AKM RAHMAN
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
05/27/2026
Special inspection requirement — Final
AKM RAHMAN
05/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
AKM RAHMAN
05/27/2026
Special inspection requirement — Air barrier - visual inspection
AKM RAHMAN
05/27/2026
Special inspection requirement — Fenestration air leakage
AKM RAHMAN
05/27/2026
Special inspection requirement — Fenestration areas
AKM RAHMAN
05/27/2026
Special inspection requirement — Insulation placement and R values
AKM RAHMAN
04/28/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
AKM RAHMAN
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
03/26/2026
Special inspection requirement — Structural Steel - Details
AKM RAHMAN
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
03/26/2026
Special inspection requirement — Final
AKM RAHMAN
03/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
AKM RAHMAN
03/26/2026
Special inspection requirement — Fenestration air leakage
AKM RAHMAN
03/26/2026
Special inspection requirement — Air barrier - visual inspection
AKM RAHMAN
03/26/2026
Special inspection requirement — Fenestration areas
AKM RAHMAN
03/26/2026
Special inspection requirement — Insulation placement and R values
AKM RAHMAN
03/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
AKM RAHMAN
03/16/2026
Permit issued — Plumbing
B01018185-S1-PL
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Addressed
03/06/2026
Objection raised — Cost
03/06/2026
Objection raised — Structural
03/06/2026
Objection resolved — Addressed
02/12/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Admin
01/29/2026
Objection raised — Admin
01/19/2026
Filed — Alteration
INTERIOR RENOVATION OF EXG 2 STORY, 2 FAMILY. NEW DRYWALL PARTITIONS, FINISH FLOORING, NEW INTERIOR DOORS, NEW TILES, KITCHEN, BATHROOM, AND NEW PLBG FIXTURES AS PER PLANS. HORIZONTAL ENLGMT AND METAL DECK AT REAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01018185-P2
01/06/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
01/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
AKM RAHMAN
01/06/2026
Special inspection requirement — Structural Steel - Details
AKM RAHMAN
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
01/06/2026
Special inspection requirement — Final
AKM RAHMAN
01/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
AKM RAHMAN
01/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
AKM RAHMAN
01/06/2026
Special inspection requirement — Insulation placement and R values
AKM RAHMAN
12/11/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Energy
07/18/2025
Objection resolved — Addressed
07/16/2025
Objection raised — Admin
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection raised — Admin
Latest 60 of 105 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
467 LEX GROUP403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/01/2024$1.1M—Private party → 467 LEX GROUP LLC$438/sf building
06/30/2022$20K—Private party → PROJECT 467 LEXINGTON$8/sf building
04/27/2022$50K—Private party → PROJECT 467 LEXINGTON LLC$21/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC405/31/2026
SYED ENGINEERING, P.C.104/18/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDING MANAGEMENT INCGeneral Contractor204/09/2026
HP BUILDING MANAGEMENT INGeneral Contractor204/09/2026
PLBG P & H INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404405/31/2026
SYED ENGINEERING, P.C.7054104/18/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLBG P & H INC03/16/2026
DOB NOWStructuralPermit IssuedH BUILDING MANAGEMENT INC03/10/2025
DOB NOWGeneral ConstructionPermit IssuedH BUILDING MANAGEMENT INC03/10/2025
DOB NOWPlumbingPermit IssuedPLBG P & H INC05/20/2024
DOB NOWGeneral ConstructionPermit IssuedANGELINE PENA-LEVI05/17/2024
DOB NOWGeneral ConstructionPermit IssuedANGELINE PENA-LEVI05/17/2024
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/17/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/06/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
05/27/2026Fenestration and door U-factor and product ratingsAKM RAHMANenergy_progress
05/27/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
05/27/2026Structural Stability – Alterations of existing buildingsAKM RAHMANspecial
05/27/2026Structural Steel - DetailsAKM RAHMANspecial
05/27/2026Energy Code Compliance InspectionsAKM RAHMANprogress
05/27/2026FinalAKM RAHMANprogress
05/27/2026Fire-Resistance Rated ConstructionAKM RAHMANprogress
05/27/2026Air barrier - visual inspectionAKM RAHMANenergy_progress
05/27/2026Fenestration air leakageAKM RAHMANenergy_progress
05/27/2026Fenestration areasAKM RAHMANenergy_progress
05/27/2026Insulation placement and R valuesAKM RAHMANenergy_progress
03/26/2026Structural Stability – Alterations of existing buildingsAKM RAHMANspecial
03/26/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
03/26/2026Structural Steel - DetailsAKM RAHMANspecial
03/26/2026Energy Code Compliance InspectionsAKM RAHMANprogress
03/26/2026FinalAKM RAHMANprogress
03/26/2026Fire-Resistance Rated ConstructionAKM RAHMANprogress
03/26/2026Fenestration air leakageAKM RAHMANenergy_progress
03/26/2026Air barrier - visual inspectionAKM RAHMANenergy_progress
03/26/2026Fenestration areasAKM RAHMANenergy_progress
03/26/2026Insulation placement and R valuesAKM RAHMANenergy_progress
03/26/2026Fenestration and door U-factor and product ratingsAKM RAHMANenergy_progress
01/06/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
01/06/2026Structural Stability – Alterations of existing buildingsAKM RAHMANspecial
01/06/2026Structural Steel - DetailsAKM RAHMANspecial
Latest 25 of 39.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026B01018185-P2Request digital key ↗
08/18/2026B01018185-P1Request digital key ↗
08/18/2026B01018185-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/18/2026B01018185-I1Open ↗
08/14/2026B01018185-P3Open ↗
08/13/2026B01018185-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature29
08/29/2026B01018185-S1Open ↗
08/29/2026B01018185-S1Open ↗
08/29/2026B01018185-S1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026B01018185-S1Open ↗
08/25/2026B01018185-P2Open ↗
08/25/2026B01018185-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026B01018185-P3Open ↗
08/18/2026B01018185-P1Open ↗
08/18/2026B01018185-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026B01018185-P1Open ↗
08/18/2026B01018185-I1Open ↗
08/14/2026B01018185-P3Open ↗
Showing 3 of 5 on file for this type
▸Other Documents12
▸DOB NOWSite Survey: Initial4
08/18/2026B01018185-P1Open ↗
08/18/2026B01018185-I1Open ↗
08/14/2026B01018185-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/18/2026B01018185-I1Open ↗
08/18/2026B01018185-P1Open ↗
08/14/2026B01018185-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/18/2026B01018185-P1Open ↗
08/18/2026B01018185-I1Open ↗
08/14/2026B01018185-P3Open ↗
Showing 3 of 4 on file for this type