← Back
BuildNYC
Elevator apt, fireproof with stores
Concern Logan
467 LOGAN STREET · BIN 3430242
💬 Discuss this project
2023Year Built
9Stories
D6Building Class
R7AZoning
51,916 sfGross Floor Area
68Units
0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: Concern Logan Housing Development Fund C Orp · 7,200 sf lot · 7.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsConcern for Independent Living5 filings
RoofInstallation of Solar Panels on Existing Roof of Commercial 2p · 1 filing
BulkheadTwo-point suspended scaffold for new building construction1p · 2 filings
Floor 1Sprinkler system removal prior to demolition1p · 1 filing
CellarSprinkler system removal prior to demolition1p · 2 filings
Site & exteriorPipe scaffold installation5 filings
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2021$4.4M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning3803/21/2026
Patuxent Engineering1403/21/2026
Millennium Designs of New York103/21/2026
ECC203/21/2026
KD Designs103/21/2026
W J Professional Expediting Company203/21/2026
S R Solar Design203/21/2026
Millennium Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Penta Restorationspecialty_contractor1707/08/2026
DDS Mechanical FPSFire Protection907/08/2026
Tri Borough ScaffoldingScaffold603/21/2026
Vaya RestorationScaffold507/08/2026
MC SuperstructureScaffold507/08/2026
Major ElectricElectrical403/21/2026
RL Mechanical Servicesspecialty_contractor407/08/2026
Major ElectricGeneral Contractor403/22/2026
D.D.S. Mechanical PBG & HeatingPlumbing307/08/2026
Arsenal ScaffoldScaffold307/08/2026
Penta RestorationScaffold307/08/2026
Alba ServicesScaffold203/21/2026
MKW AssociatesGeneral Contractor103/22/2026
Accurate MechanicalFire Protection107/08/2026
770 Electricspecialty_contractor107/08/2026
Major ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins18032208/17/2026
McHenery Testing Lab9181212/04/2024
NKM Engineering6244110/31/2024
Building Lifecycle
All (194)Filed (37)Permit Issued (41)Signed Off (18)Inspection (16)Objection (52)Special Inspection (30)
08/18/2026
Special inspection requirement — Exterior lighting power
Justin Moses
08/18/2026
Special inspection requirement — Lighting in dwelling units
Justin Moses
08/18/2026
Special inspection requirement — Air barrier - visual inspection
Justin Moses
08/18/2026
Special inspection requirement — Air barrier continuity plan testing
Justin Moses
08/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Electrical motors and elevators
Justin Moses
08/18/2026
Special inspection requirement — Lighting controls
Justin Moses
08/18/2026
Special inspection requirement — Maintenance information
Justin Moses
08/18/2026
Special inspection requirement — Protection of exposed foundation insulation
Justin Moses
08/18/2026
Special inspection requirement — Interior lighting power
Justin Moses
08/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Justin Moses
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
08/18/2026
Special inspection requirement — Fenestration air leakage
Justin Moses
08/18/2026
Special inspection requirement — Metering
Justin Moses
08/18/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Vestibules
Justin Moses
08/18/2026
Special inspection requirement — Insulation placement and R values
Justin Moses
08/18/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SAMI HAJJAR P.E
08/18/2026
Special inspection requirement — Fenestration areas
Justin Moses
08/17/2026
Filed — New Building
Plumbing work per plans filed herewith.
B00614012-A6
08/06/2026
Special inspection requirement — Protection of exposed foundation insulation
Justin Moses
08/06/2026
Special inspection requirement — Air barrier - visual inspection
Justin Moses
08/06/2026
Special inspection requirement — Lighting controls
Justin Moses
08/06/2026
Special inspection requirement — Insulation placement and R values
Justin Moses
08/06/2026
Special inspection requirement — Lighting in dwelling units
Justin Moses
08/06/2026
Special inspection requirement — Fenestration air leakage
Justin Moses
08/06/2026
Special inspection requirement — Air barrier continuity plan testing
Justin Moses
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Justin Moses
08/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
07/15/2026
Filed — New Building
Plumbing work per plans filed herewith.
B00614012-A4
12/09/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01132037-I1
09/30/2025
Objection resolved — Addressed
09/29/2025
Objection raised — Other
09/17/2025
Signed off — Alteration
B00641125-I1
09/17/2025
Signed off — New Building
Plumbing work per plans filed herewith.
B00614012-S4
09/09/2025
Filed — New Building
Plumbing work per plans filed herewith.
B00614012-A3
08/27/2025
Filed — New Building
Plumbing work per plans filed herewith.
B00614012-A2
07/23/2025
Signed off — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# B00614012.
B00641108-I1
07/21/2025
Signed off — New Building
Plumbing work per plans filed herewith.
B00614012-S5
07/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2025
Signed off — Alteration
FILING FOR SUB-SLAB DEPRESSURIZATION SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01239332-I1
06/25/2025
Filed — New Building
Plumbing work per plans filed herewith.
B00614012-A1
06/17/2025
Permit issued — General Construction
B01239332-I1-GC
06/13/2025
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# B00614012.
B00641108-P2
06/12/2025
Filed — Alteration
FILING FOR SUB-SLAB DEPRESSURIZATION SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01239332-I1
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/23/2025
Objection resolved — Addressed
05/15/2025
Filed — New Building
Plumbing work per plans filed herewith.
B00614012-P9
05/12/2025
Permit issued — Standpipe
B00641125-I1-EW-SD
05/09/2025
Permit issued — Sprinklers
B00641108-I1-EW-SD
05/09/2025
Permit issued — General Construction
B00614012-I1-GC
05/09/2025
Permit issued — Sprinklers
B00641108-I1-EW-SP
05/09/2025
Permit issued — Plumbing
B00614012-S5-PL
04/23/2025
Objection raised — Other
04/23/2025
Objection resolved — Addressed
04/16/2025
Filed — New Building
Plumbing work per plans filed herewith.
B00614012-P7
04/07/2025
Signed off — New Building
Plumbing work per plans filed herewith.
B00614012-S3
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPenta Restoration06/17/2025
DOB NOWStandpipeSigned-offDDS Mechanical FPS05/12/2025
DOB NOWStandpipeSigned-offDDS Mechanical FPS05/09/2025
DOB NOWGeneral ConstructionPermit IssuedPenta Restoration05/09/2025
DOB NOWSprinklersSigned-offDDS Mechanical FPS05/09/2025
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating05/09/2025
DOB NOWSprinklersSigned-offAccurate Mechanical01/30/2025
DOB NOWMechanical SystemsSigned-offRL Mechanical Services01/09/2025
DOB NOWSolarSigned-off770 Electric11/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold11/07/2024
DOB NOWSupported ScaffoldSigned-offVaya Restoration09/25/2024
DOB NOWMechanical SystemsSigned-offRL Mechanical Services08/22/2024
DOB NOWFoundationSigned-offPenta Restoration07/03/2024
DOB NOWStructuralSigned-offPenta Restoration06/11/2024
DOB NOWSuspended ScaffoldSigned-offVaya Restoration05/31/2024
DOB NOWStandpipeSigned-offDDS Mechanical FPS05/31/2024
DOB NOWSuspended ScaffoldSigned-offVaya Restoration05/31/2024
DOB NOWStandpipeSigned-offDDS Mechanical FPS05/31/2024
DOB NOWSprinklersSigned-offDDS Mechanical FPS05/31/2024
DOB NOWSupport of ExcavationSigned-offPenta Restoration05/21/2024
DOB NOWConstruction FenceSigned-offPenta Restoration05/17/2024
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating05/08/2024
DOB NOWGeneral ConstructionPermit IssuedPenta Restoration05/07/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure02/23/2024
DOB NOWMechanical SystemsSigned-offRL Mechanical Services11/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold11/24/2023
DOB NOWMechanical SystemsSigned-offRL Mechanical Services10/10/2023
DOB NOWSupported ScaffoldSigned-offMC Superstructure08/11/2023
DOB NOWSidewalk ShedSigned-offMC Superstructure07/28/2023
DOB NOWFoundationSigned-offPenta Restoration07/05/2023
DOB NOWStructuralSigned-offPenta Restoration06/13/2023
DOB NOWStandpipeSigned-offDDS Mechanical FPS06/02/2023
DOB NOWSprinklersSigned-offDDS Mechanical FPS06/01/2023
DOB NOWStandpipeSigned-offDDS Mechanical FPS06/01/2023
DOB NOWConstruction FenceSigned-offPenta Restoration05/30/2023
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating05/25/2023
DOB NOWGeneral ConstructionPermit IssuedPenta Restoration05/22/2023
DOB NOWSupport of ExcavationSigned-offPenta Restoration05/22/2023
DOB NOWConstruction FenceSigned-offAlba Services02/01/2023
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding01/19/2023
+ 1 more permits on file
1 project · most recent 08/17/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedPenta RestorationAir Conditioning Systems
Cooling
Lg ARUM096BTE5 8 tons · Vrf Outdoor ×26
ARUM121BTE5 10 tons · Vrf Outdoor ×6
ARUM144BTE5 12 tons · Vrf Outdoor ×3
ARUM96BTE5 8 tons · Vrf Outdoor ×1
ARUN038GSS4 4 tons · Vrf Outdoor ×3
ARUN072BTE5 6 tons · Vrf Outdoor ×1
LSU181HSV5 2 tons · Condensing Unit ×3
LSU243HLV3 2 tons · Condensing Unit ×3
ARUM072BTE5 6 tons · Vrf Outdoor ×2
Mitsubishi Electric PURY-P96TNU-A 8 tons · Vrf Outdoor ×9
PURY-P120TNU-A 10 tons · Vrf Outdoor ×2
PUMY-P96NKMU3 4 tons · Vrf Outdoor ×1
PURY-P144TNU-A 12 tons · Vrf Outdoor ×1
PURY-P72TNU-A 6 tons · Vrf Outdoor ×1
PUZ-A18NHA7 2 tons · Condensing Unit ×1
PUZ-A24NHA7 2 tons · Condensing Unit ×1
1 project · most recent 08/17/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/17/2026Signed-offD.D.S. Mechanical PBG & HeatingGas, Storm, Water/Sanitary
7 projects · most recent 08/08/2025
General Wiring
FiledStatusContractorScope
08/08/2025CompleteMajor ElectricGeneral Wiring
03/27/2025CompleteGrid City Electric47 meters, 1 new_meters
05/09/2024CompleteTuxedo Electrical Contracting—
04/17/2024CompleteMajor Electric—
04/09/2024CompleteNash Electric Services—
11/27/2023CompleteNash Electric Services—
01/16/2023CompleteNash Electric Services—
1 project · most recent 08/17/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/17/2026Permit IssuedPenta RestorationSteel, Concrete, Masonry
1 project · most recent 04/23/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/23/2024——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/12/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/25/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/01/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/18/2026Fenestration air leakageJustin Mosesenergy_progress
08/18/2026VestibulesJustin Mosesenergy_progress
08/18/2026MasonrySAMI HAJJAR P.Especial
08/18/2026Wall Panels, Curtain Walls, and VeneersSAMI HAJJAR P.Especial
08/18/2026Exterior Insulation and Finish Systems (EIFS)SAMI HAJJAR P.Especial
08/18/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
08/18/2026Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
08/18/2026Energy Code Compliance InspectionsJustin Mosesprogress
08/18/2026Electrical motors and elevatorsJustin Mosesenergy_progress
08/18/2026Lighting controlsJustin Mosesenergy_progress
08/18/2026Insulation placement and R valuesJustin Mosesenergy_progress
08/18/2026Maintenance informationJustin Mosesenergy_progress
08/18/2026Air barrier - visual inspectionJustin Mosesenergy_progress
08/18/2026Protection of exposed foundation insulationJustin Mosesenergy_progress
08/18/2026Fenestration areasJustin Mosesenergy_progress
08/18/2026Lighting in dwelling unitsJustin Mosesenergy_progress
08/18/2026Interior lighting powerJustin Mosesenergy_progress
08/18/2026Air barrier continuity plan testingJustin Mosesenergy_progress
08/18/2026Exterior lighting powerJustin Mosesenergy_progress
08/18/2026MeteringJustin Mosesenergy_progress
08/18/2026Fenestration and door U-factor and product ratingsJustin Mosesenergy_progress
08/06/2026Fenestration air leakageJustin Mosesenergy_progress
08/06/2026Lighting controlsJustin Mosesenergy_progress
08/06/2026Maintenance informationJustin Mosesenergy_progress
08/06/2026Fenestration areasJustin Mosesenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Concern for Independent LivingResidentialCellar, Floors 1–9, Roof
Project B00641125 Alteration · LOC Issued · 05/19/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch37
08/31/2026B00641108-I1Request digital key ↗
08/31/2026B00641108-P2Request digital key ↗
08/31/2026B00641108-P1Request digital key ↗
Showing 3 of 37 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
01/18/2024340866030Open ↗
09/22/2022340866030Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/31/2023340866030Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/31/2023340866030Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026B00614012-I1Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/21/2026B00614012-A4Open ↗
08/19/2026B00614012-A6Open ↗
08/13/2026B00614012-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/21/2026B00614012-A4Open ↗
08/19/2026B00614012-A6Open ↗
08/13/2026B00614012-A1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00614012-I1Open ↗
▸Seals & Professional Certifications89
▸DOB NOWDPL-1: Design Professional Seal & Signature37
08/31/2026B00641108-P2Open ↗
08/31/2026B00641108-I1Open ↗
08/31/2026B00641108-P1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
10/05/2026B01239332-I1Open ↗
09/02/2026B00614012-I1Open ↗
09/02/2026B00614012-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
10/05/2026B01239332-I1Open ↗
09/02/2026B00614012-I1Open ↗
09/02/2026B00614012-I1Open ↗
Showing 3 of 23 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2022340866030Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00614012-I1Open ↗
08/13/2026B00614012-A3Open ↗
08/13/2026B00614012-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings2
08/15/2026B00614012-I1—
08/15/2026B00920948-I1—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist6
08/21/2026B00614012-A1Open ↗
08/21/2026B00614012-A4Open ↗
08/19/2026B00614012-A6Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
01/31/2023340866030Open ↗
▸BISSTREET TREE CHECKLIST1
01/31/2023340866030Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00614012-I1Open ↗
▸Environmental & Asbestos28
▸DOB NOWOER: Notice to Proceed15
08/21/2026B00614012-A4Open ↗
08/19/2026B00614012-A6Open ↗
08/13/2026B00920948-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
08/13/2026B00614012-S5Open ↗
08/13/2026B00614012-S2Open ↗
08/13/2026B00614012-S3Open ↗
Showing 3 of 10 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
09/04/2025340866030Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/31/2023340866030Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00823118-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00614012-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWConcrete Testing Exception Report2
08/13/2026B00614012-S1Open ↗
08/13/2026B00614012-S3Open ↗
▸DOB NOWTR5 Test Report2
08/13/2026B00614012-S1Open ↗
08/13/2026B00614012-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs2
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01132037-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026B01132037-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
02/21/2025340866030Open ↗
02/22/2024340866030Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2022340866030Open ↗
▸Other Documents32
▸DOB NOWSite Survey: Initial6
08/21/2026B00614012-A4Open ↗
08/19/2026B00614012-A6Open ↗
08/13/2026B00614012-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/21/2026B00614012-A4Open ↗
08/19/2026B00614012-A6Open ↗
08/13/2026B00614012-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/21/2026B00614012-A1Open ↗
08/21/2026B00614012-A4Open ↗
08/19/2026B00614012-A6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCalculations5
08/13/2026B01057367-I1Open ↗
08/13/2026B01057430-I1Open ↗
08/13/2026B01057430-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications5
08/13/2026B01057367-I1Open ↗
08/13/2026B01057430-I1Open ↗
08/13/2026B01057430-P1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/31/2023340866030Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00614012-S2Open ↗