← Back
Predominantly retail with other uses
468 9 AVENUE
MANHATTAN · BIN 1082263
💬 Discuss this project
1920Year Built
4Stories
K4Building Class
C1-7AZoning
16,808 sfGross Floor Area
10Units
7 Open Violations 4 unresolved · 3 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 36TH HY LLC · 4,995 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Roof2p · 2 filings · 14 docs
Floor 41p · 1 filing · 9 docs
Floor 31p · 1 filing · 5 docs
Floor 21p · 1 filing · 9 docs
Floor 11p · 1 filing · 3 docs
Cellar2p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GORJIAN REAL ESTATE GROUP609/13/2026
36TH HY LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/08/2017$8.0M—— → —$476/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JACK GREEN ASSOCIATES307/15/2026
JASON LITTLE ARCHITECTS204/19/2024
BL CONSULTANT112/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H DESIGN STUDIO INC203/21/2026
BARNWELL CONSULTANTS403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422307/15/2026
Building Lifecycle
All (71)Filed (6)Violation (35)Objection (7)Special Inspection (23)
07/28/2026
Objection resolved — Open
07/20/2026
Objection raised — Structural
07/15/2026
Filed — Alteration
M01046663-I1
10/14/2025
Violation issued (ECB, closed)
Construction
02/04/2025
Violation issued (ECB, closed)
Construction
11/18/2024
Violation issued (ECB, closed)
Unknown
11/18/2024
Violation issued (ECB, closed)
Construction
10/21/2024
Violation issued (FDNY_ORDER, closed)
10/21/2024
Violation issued (FDNY_ORDER, closed)
05/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
05/06/2024
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
05/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
LAWRENCE GREEN
04/30/2024
Objection raised — Other
04/19/2024
Filed — Alteration CO
Legalization of Interim Multiple Dwelling #10920 in accordance with Article 7-B of the NYS Multiple Dwelling Law. No change to bulk proposed.
M01030799-I1
04/17/2024
Special inspection requirement — Insulation placement and R values
04/17/2024
Special inspection requirement — Metering
04/17/2024
Special inspection requirement — Air barrier - visual inspection
04/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
04/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/15/2024
Special inspection requirement — Lighting in dwelling units
04/15/2024
Special inspection requirement — Fenestration air leakage
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/20/2022
Objection raised — Scope
12/16/2022
Filed — Alteration
M08045238-I1
11/25/2022
Objection raised — Scope
11/25/2022
Objection raised — Scope
11/19/2022
Objection raised — Scope
11/16/2022
Filed — Alteration
General Construction modifications to existing units as per plans filed herewith. No change to use. bulk, egress or occupancy is proposed.
M08036598-I1
11/16/2022
Filed — Alteration
M08036774-I1
11/16/2022
Filed — Alteration
M08036795-I1
11/16/2022
Special inspection requirement — Tenant Protection Plan Compliance
11/16/2022
Special inspection requirement — Tenant Protection Plan Compliance
11/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
11/16/2022
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
11/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
11/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
11/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
11/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
11/10/2022
Special inspection requirement — Heating Systems
JACK GREEN
11/10/2022
Special inspection requirement — Maintenance information
JACK GREEN
11/08/2022
Special inspection requirement — Final
JACK GREEN
11/08/2022
Special inspection requirement — Mechanical Systems
JACK GREEN
02/20/2019
Violation issued (HPD, closed)
A
02/20/2019
Violation issued (HPD, closed)
C
02/20/2019
Violation issued (HPD, closed)
C
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
C
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
C
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
B
02/20/2019
Violation issued (HPD, closed)
C
02/20/2019
Violation issued (HPD, closed)
B
Latest 60 of 71 events.
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/06/2024Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
05/06/2024Sprinkler SystemsLAWRENCE GREENspecial
05/06/2024Tenant Protection Plan ComplianceLAWRENCE GREENspecial
04/17/2024Insulation placement and R values—energy_progress
04/17/2024Metering—energy_progress
04/17/2024Air barrier - visual inspection—energy_progress
04/17/2024Fenestration and door U-factor and product ratings—energy_progress
04/16/2024Tenant Protection Plan Compliance—special
04/15/2024Lighting in dwelling units—energy_progress
04/15/2024Fenestration air leakage—energy_progress
04/04/2024Fire-Resistant Penetrations and Joints—special
11/16/2022Tenant Protection Plan Compliance—special
11/16/2022Tenant Protection Plan Compliance—special
11/16/2022Fire-Resistant Penetrations and JointsJACK GREENspecial
11/16/2022Energy Code Compliance InspectionsJACK GREENprogress
11/16/2022HVAC-R and service water piping design and insulationJACK GREENenergy_progress
11/10/2022HVAC-R and service water heating equipmentJACK GREENenergy_progress
11/10/2022HVAC-R and service water piping design and insulationJACK GREENenergy_progress
11/10/2022HVAC-R and service water heating system controlsJACK GREENenergy_progress
11/10/2022Heating SystemsJACK GREENspecial
11/10/2022Maintenance informationJACK GREENenergy_progress
11/08/2022FinalJACK GREENprogress
11/08/2022Mechanical SystemsJACK GREENspecial
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026M08036795-I1Request digital key ↗
09/01/2026M08036774-I1Request digital key ↗
08/15/2026M08036598-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/14/2026M01030799-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026M08036795-I1Open ↗
09/01/2026M08036774-I1Open ↗
09/01/2026M08045238-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026M08036795-I1Open ↗
09/02/2026M08036795-I1Open ↗
08/23/2026M08036774-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M08036795-I1Open ↗
09/01/2026M01046663-I1Open ↗
08/23/2026M08036774-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWHPD-1: Anti-Harassment Area Checklist4
09/01/2026M08036774-I1Open ↗
08/15/2026M01046663-I1Open ↗
08/14/2026M01030799-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026M01030799-I1Open ↗
▸DOB NOWCertificate of No Harassment1
08/14/2026M01030799-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026M08036795-I1Open ↗
09/01/2026M08036774-I1Open ↗
08/15/2026M01046663-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/14/2026M01030799-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01030799-I1Open ↗