← Back
Two family brick
468 HERZL STREET
BROOKLYN · Brownsville · BIN 3082464
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R6Zoning
2,080 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · Owner of record: HSBC BANK USA, N.A. · 3,000 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATOMIC CONTRACTING604/09/2026
SION304/09/2026
MAUREEN ST HILAIV3103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2025$500K—Private party → EQUITY 555 INC.$240/sf building
06/09/2025$741K—Private party → HSBC BANK USA, N.A.$356/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC504/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor104/09/2026
RENEW PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108504/08/2026
Building Lifecycle
All (69)Filed (5)Permit Issued (2)Signed Off (1)Violation (24)Inspection (7)Special Inspection (30)
06/17/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2026
Signed off — Alteration
THIS APPLICATION IS FILED FOR THE INSTALLATION OF (5) LAVATORY, (5) TOILET (4) BATH, (1) SHOWER ,(2) KITCHEN SINK , (2) DISHWASHER ,(3) WASHER ,(3) ELECTRIC DRYER (2) NON-GAS HOT WATER HEATER IN CONJUNCTION WITH ALTERATION APPLICATION #B01325679-I1
B01325679-S1
04/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
04/10/2026
Special inspection requirement — Insulation placement and R values
sion hourizadeh
04/10/2026
Special inspection requirement — Permanent certificate
04/10/2026
Special inspection requirement — Interior lighting power
sion hourizadeh
04/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/10/2026
Special inspection requirement — Maintenance information
04/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
04/10/2026
Special inspection requirement — Mechanical Systems
sion hourizadeh
04/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
04/10/2026
Special inspection requirement — Final
sion hourizadeh
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
04/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
04/09/2026
Special inspection requirement — Permanent certificate
sion hourizadeh
04/09/2026
Special inspection requirement — Maintenance information
sion hourizadeh
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
04/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
04/08/2026
Filed — Alteration
THIS APPLICATION IS FILED FOR THE INSTALLATION OF (5) LAVATORY, (5) TOILET (4) BATH, (1) SHOWER ,(2) KITCHEN SINK , (2) DISHWASHER ,(3) WASHER ,(3) ELECTRIC DRYER (2) NON-GAS HOT WATER HEATER IN CONJUNCTION WITH ALTERATION APPLICATION #B01325679-I1
B01325679-P2
04/07/2026
Filed — Alteration
THIS APPLICATION IS FILED FOR THE INSTALLATION OF (5) LAVATORY, (5) TOILET (4) BATH, (1) SHOWER ,(2) KITCHEN SINK , (2) DISHWASHER ,(3) WASHER ,(3) ELECTRIC DRYER (2) NON-GAS HOT WATER HEATER IN CONJUNCTION WITH ALTERATION APPLICATION #B01325679-I1
B01325679-P3
03/26/2026
Special inspection requirement — Permanent certificate
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
03/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/26/2026
Special inspection requirement — Maintenance information
03/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
03/20/2026
Special inspection requirement — Mechanical Systems
sion hourizadeh
03/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
03/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/26/2026
Permit issued — Plumbing
B01325679-S1-PL
12/12/2025
Filed — Alteration
THIS APPLICATION IS FILED FOR THE INSTALLATION OF (5) LAVATORY, (5) TOILET (4) BATH, (1) SHOWER ,(2) KITCHEN SINK , (2) DISHWASHER ,(3) WASHER ,(3) ELECTRIC DRYER (2) NON-GAS HOT WATER HEATER IN CONJUNCTION WITH ALTERATION APPLICATION #B01325679-I1
B01325679-S1
12/11/2025
Permit issued — General Construction
B01325679-I1-GC-CX
11/26/2025
Filed — Alteration
This Application filed for interior renovation of a exist. 2 Story ,2 Family Bldg ,new partition, reinforced damage wood joist as needed, address violation #35124343Y ,35124344X ,35225906L, 35114029R ,35256013X No Change in Use , Egress or Occupancy
B01323660-I1
11/26/2025
Filed — Alteration
THIS APPLICATION IS FILED FOR THE INSTALLATION OF (5) LAVATORY, (5) TOILET (4) BATH, (1) SHOWER ,(2) KITCHEN SINK , (2) DISHWASHER ,(3) WASHER ,(3) ELECTRIC DRYER (2) NON-GAS HOT WATER HEATER IN CONJUNCTION WITH ALTERATION APPLICATION #B01325679-I1
B01325679-I1
11/24/2025
Violation issued (HPD, closed)
I
12/03/2024
Violation issued (HPD, closed)
I
11/28/2023
Violation issued (HPD, closed)
I
11/17/2022
Violation issued (HPD, closed)
I
03/16/2022
Violation issued (HPD, closed)
I
04/21/2021
Violation issued (HPD, closed)
I
11/07/2019
Violation issued (HPD, closed)
I
11/01/2018
Violation issued (HPD, closed)
I
05/16/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/20/2018
Violation issued (ECB, open)
Construction
06/28/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2017
Violation issued (ECB, closed)
Construction
04/07/2017
Violation issued (ECB, closed)
Construction
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP02/26/2026
DOB NOWGeneral ConstructionSigned-offJ&J DESIGNS INC12/11/2025
2 projects · most recent 04/08/2026
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2026Signed-offJ&J DESIGNS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter CH-R28MES-230VO , CH-12MOLVWM-230VI 81,000 BTU · Split System ×6
Ventilation
Panasonic FV11VQ5 & FV-15VQ5 800 CFM · Exhaust Fan ×14
11/26/2025——Ventilation Systems
Ventilation
1 project · most recent 04/08/2026
Water/Sanitary
FiledStatusContractorScope
04/08/2026Signed-offRENEW PLUMBING CORPWater/Sanitary
1 project · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
2 projects · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026Signed-offRENEW PLUMBING CORP2 scope_items
11/26/2025——2 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
04/10/2026HVAC-R and service water heating equipment—energy_progress
04/10/2026Fire-Resistance Rated Constructionsion hourizadehprogress
04/10/2026Insulation placement and R valuession hourizadehenergy_progress
04/10/2026Permanent certificate—energy_progress
04/10/2026Interior lighting powersion hourizadehenergy_progress
04/10/2026HVAC-R and service water heating system controls—energy_progress
04/10/2026Maintenance information—energy_progress
04/10/2026HVAC-R and service water piping design and insulation—energy_progress
04/10/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
04/10/2026Mechanical Systemssion hourizadehspecial
04/10/2026Structural Stability – Alterations of existing buildingssion hourizadehspecial
04/10/2026Finalsion hourizadehprogress
04/10/2026Energy Code Compliance Inspections—progress
04/09/2026Energy Code Compliance Inspectionssion hourizadehprogress
04/09/2026Permanent certificatesion hourizadehenergy_progress
04/09/2026Maintenance informationsion hourizadehenergy_progress
04/09/2026HVAC-R and service water heating system controlssion hourizadehenergy_progress
04/09/2026HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
04/09/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
04/09/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
03/26/2026Permanent certificate—energy_progress
03/26/2026Energy Code Compliance Inspections—progress
03/26/2026HVAC-R and service water heating system controls—energy_progress
03/26/2026HVAC-R and service water piping design and insulation—energy_progress
03/26/2026Maintenance information—energy_progress
Latest 25 of 40.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026B01323660-I1Request digital key ↗
08/19/2026B01325679-I1Request digital key ↗
08/19/2026B01325679-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/19/2026B01325679-I1Open ↗
08/19/2026B01325679-P3Open ↗
08/19/2026B01325679-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B01325679-P3Open ↗
08/28/2026B01325679-P3Open ↗
08/28/2026B01325679-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026B01323660-I1Open ↗
08/19/2026B01325679-I1Open ↗
08/19/2026B01325679-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B01325679-S1Open ↗
08/28/2026B01325679-P3Open ↗
08/26/2026B01325679-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026B01323660-I1Open ↗
08/19/2026B01325679-I1Open ↗
08/19/2026B01325679-P2Open ↗
Showing 3 of 5 on file for this type