← Back
BuildNYC
Miscellaneous two family
468 ROBINSON AVENUE
STATEN ISLAND · BIN 5066416
💬 Discuss this project
2022Year Built
2Stories
B9Building Class
R3-2Zoning
1,707 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Miscellaneous two family · Owner of record: Culotta Realty · 2,850 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic7p · 1 filing · 4 docs
Floor 29p · 2 filings · 20 docs
Floor 1Construction fence installation33p · 3 filings · 20 docs
Basement3p · 1 filing · 20 docs
Sub-Basement7p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Valenziano Architecture612/28/2023
William Montague Engineering111/12/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maximum ContractingGeneral Contractor903/21/2026
Maximum ContractingScaffold603/21/2026
Premier PL, Heating & MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677312/28/2023
Building Lifecycle
01/26/2024
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
01/26/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
01/26/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
01/26/2024
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
59 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMaximum Contracting05/11/2023
DOB NOWEarth WorkPermit IssuedMaximum Contracting09/07/2022
DOB NOWConstruction FenceSigned-offMaximum Contracting09/07/2022
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical08/18/2022
DOB NOWFoundationPermit IssuedMaximum Contracting07/18/2022
DOB NOWConstruction FenceSigned-offMaximum Contracting11/16/2021
BIS—ISSUEDJ. Smith Construction11/18/2021
1 project · most recent 09/04/2022
General Wiring
FiledStatusContractorScope
09/04/2022CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 12/28/2023
Wood
FiledStatusContractorScope
12/28/2023Signed-offMaximum ContractingWood
1 project · most recent 12/28/2023
Earthwork
FiledStatusContractorScope
12/28/2023Signed-offMaximum ContractingEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/23/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
05/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/31/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
01/26/2024Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
01/26/2024Subgrade InspectionsWILLIAM MONTAGUEspecial
01/26/2024Wood – Prefabricated I-JoistsWILLIAM MONTAGUEspecial
01/26/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
01/26/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
01/26/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
01/26/2024Footing and FoundationWILLIAM MONTAGUEprogress
01/26/2024Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
01/26/2024Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
01/26/2024Structural Wood FrameWILLIAM MONTAGUEprogress
01/26/2024FinalWILLIAM MONTAGUEprogress
01/26/2024Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
01/26/2024Interior lighting powerWILLIAM MONTAGUEenergy_progress
01/26/2024Air barrier — testing WILLIAM MONTAGUEenergy_progress
01/26/2024Maintenance informationWILLIAM MONTAGUEenergy_progress
01/26/2024Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
01/26/2024MeteringWILLIAM MONTAGUEenergy_progress
01/26/2024Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
01/26/2024Fenestration areasWILLIAM MONTAGUEenergy_progress
01/26/2024Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
01/26/2024Permanent certificateWILLIAM MONTAGUEenergy_progress
01/26/2024Fenestration air leakageWILLIAM MONTAGUEenergy_progress
01/26/2024HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
12/28/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
12/28/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
Latest 25 of 69.
79 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account