← Back
One story - permanent living quarter
4680 INDEPENDENCE AVENUE
BRONX · BIN 2085834
💬 Discuss this project
1960Year Built
2Stories
A2Building Class
R1-2Zoning
5,366 sfGross Floor Area
1Units
One story - permanent living quarter · 9,605 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Architecture
Floor 216p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING STUDIO ARCHITECTS611/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BG & ASSOCIATES1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALEKS & F., INCGeneral Contractor207/08/2026
S. TIEGER PLBG. CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING STUDIO ARCHITECT592212/16/2021
Building Lifecycle
All (35)Filed (6)Permit Issued (3)Signed Off (2)Inspection (3)Objection (6)Special Inspection (15)
11/18/2023
Filed — Alteration CO
CONVERTION OF ATTIC TO NEW THIRD FLOOR, WITH M.E.P. WORKASSOCIATED. NEW BEDROOM, BATHROOM, AND RECREATION ROOMON EXISTING ATTIC LEVEL: RELATED CONSTRUCTION/MECANICAL WORK FILED UNDER APPL # X00625219 AND PLUMBING WORK FILED UNDER APPL# X00625275.
X00625995-P3
11/16/2023
Special inspection requirement — Interior lighting power
Michael Goldblum
10/26/2023
Filed — Alteration CO
CONVERTION OF ATTIC TO NEW THIRD FLOOR, WITH M.E.P. WORKASSOCIATED. NEW BEDROOM, BATHROOM, AND RECREATION ROOMON EXISTING ATTIC LEVEL: RELATED CONSTRUCTION/MECANICAL WORK FILED UNDER APPL # X00625219 AND PLUMBING WORK FILED UNDER APPL# X00625275.
X00625995-P2
08/24/2023
Special inspection requirement — Interior lighting power
Michael Goldblum
08/16/2023
Filed — Alteration CO
CONVERTION OF ATTIC TO NEW THIRD FLOOR, WITH M.E.P. WORKASSOCIATED. NEW BEDROOM, BATHROOM, AND RECREATION ROOMON EXISTING ATTIC LEVEL: RELATED CONSTRUCTION/MECANICAL WORK FILED UNDER APPL # X00625219 AND PLUMBING WORK FILED UNDER APPL# X00625275.
X00625995-P1
06/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2023
Permit issued — General Construction
X00625995-I1-GC
12/02/2022
Signed off — Alteration
FILING FOR NEW BATHROOM IN CONJUNCTION WITH APPL # X00526219. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00625275-I1
11/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/02/2022
Signed off — Alteration
CONVERTION OF ATTIC TO NEW THIRD FLOOR, WITH M.E.P. WORKASSOCIATED. NEW BEDROOM, BATHROOM, AND RECREATION ROOM ON EXISTING ATTIC LEVEL. PLUMBING WORK IS FILED UNDER APPL # X00625275.
X00625219-I1
08/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/06/2022
Permit issued — Plumbing
X00625275-I1-PL
06/22/2022
Permit issued — General Construction
X00625219-I1-GC-CX
02/22/2022
Objection raised — Scope
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Zoning
02/22/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Mechanical
01/28/2022
Objection resolved — Addressed
12/24/2021
Filed — Alteration CO
CONVERTION OF ATTIC TO NEW THIRD FLOOR, WITH M.E.P. WORKASSOCIATED. NEW BEDROOM, BATHROOM, AND RECREATION ROOMON EXISTING ATTIC LEVEL: RELATED CONSTRUCTION/MECANICAL WORK FILED UNDER APPL # X00625219 AND PLUMBING WORK FILED UNDER APPL# X00625275.
X00625995-I1
12/16/2021
Filed — Alteration
CONVERTION OF ATTIC TO NEW THIRD FLOOR, WITH M.E.P. WORKASSOCIATED. NEW BEDROOM, BATHROOM, AND RECREATION ROOM ON EXISTING ATTIC LEVEL. PLUMBING WORK IS FILED UNDER APPL # X00625275.
X00625219-I1
11/29/2021
Filed — Alteration
FILING FOR NEW BATHROOM IN CONJUNCTION WITH APPL # X00526219. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00625275-I1
11/15/2021
Special inspection requirement — Air barrier — testing
Michael Goldblum
11/15/2021
Special inspection requirement — Heating Systems
Michael Goldblum
11/15/2021
Special inspection requirement — Energy Code Compliance Inspections
Michael Goldblum
11/15/2021
Special inspection requirement — Duct leakage testing, insulation and design
Michael Goldblum
11/15/2021
Special inspection requirement — HVAC-R and service water heating equipment
Michael Goldblum
11/15/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Goldblum
11/05/2021
Special inspection requirement — Air barrier - visual inspection
Michael Goldblum
11/05/2021
Special inspection requirement — Fenestration air leakage
Michael Goldblum
11/05/2021
Special inspection requirement — Insulation placement and R values
Michael Goldblum
11/05/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Goldblum
11/04/2021
Special inspection requirement — Mechanical Systems
Michael Goldblum
11/04/2021
Special inspection requirement — Final
Michael Goldblum
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Goldblum
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedALEKS & F., INC03/21/2023
DOB NOWPlumbingSigned-offS. TIEGER PLBG. CO., INC07/06/2022
DOB NOWGeneral ConstructionSigned-offALEKS & F., INC06/22/2022
BISMHISSUEDKEY CONSTRUCTION SERVICES, INC.04/06/1998
BISPLISSUEDCHARLES CASA & SON, INC.10/05/1994
1 project · most recent 11/21/2022
General Wiring
FiledStatusContractorScope
11/21/2022CompleteAMSTERDAM ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
11/16/2023Interior lighting powerMichael Goldblumenergy_progress
08/24/2023Interior lighting powerMichael Goldblumenergy_progress
11/15/2021Air barrier — testing Michael Goldblumenergy_progress
11/15/2021Heating SystemsMichael Goldblumspecial
11/15/2021Energy Code Compliance InspectionsMichael Goldblumprogress
11/15/2021Duct leakage testing, insulation and designMichael Goldblumenergy_progress
11/15/2021HVAC-R and service water heating equipmentMichael Goldblumenergy_progress
11/15/2021HVAC-R and service water piping design and insulationMichael Goldblumenergy_progress
11/05/2021Air barrier - visual inspectionMichael Goldblumenergy_progress
11/05/2021Fenestration air leakageMichael Goldblumenergy_progress
11/05/2021Insulation placement and R valuesMichael Goldblumenergy_progress
11/05/2021Fenestration and door U-factor and product ratingsMichael Goldblumenergy_progress
11/04/2021Mechanical SystemsMichael Goldblumspecial
11/04/2021FinalMichael Goldblumprogress
11/04/2021Fire-Resistant Penetrations and JointsMichael Goldblumspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026X00625275-I1Request digital key ↗
08/24/2026X00625219-I1Request digital key ↗
08/22/2026X00625995-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026X00625219-I1Open ↗
08/22/2026X00625995-P3Open ↗
08/22/2026X00625995-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026X00625219-I1Open ↗
09/01/2026X00625219-I1Open ↗
08/27/2026X00625995-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X00625219-I1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026X00625995-P1Open ↗
08/13/2026X00625995-P2Open ↗
08/13/2026X00625995-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00625995-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00625995-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00625995-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026X00625219-I1Open ↗
08/22/2026X00625995-P2Open ↗
08/22/2026X00625995-P3Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00625219-I1Open ↗
08/13/2026X00625995-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/22/2026X00625995-P3Open ↗
08/22/2026X00625995-P2Open ↗
08/22/2026X00625995-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X00625995-I1Open ↗