← Back
Two family brick
469 13 STREET
BROOKLYN · Park Slope · BIN 3026451
💬 Discuss this project
1897Year Built
2Stories
B1Building Class
R6BZoning
3,012 sfGross Floor Area
2Units
Two family brick · 2,000 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 13 docs
Basement1p · 1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/13/2014$950K—Private party → Private party$315/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JON PAUL DESIGN & CONSULTING206/12/2025
ROHAN ENGINEERING, PC104/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON PAUL DESIGN & CONSULTING403/21/2026
VRD DEVELOPMENT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GARCIA HOME IMPROVEMENTGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROHAN ENGINEERING, PC2600306/12/2025
Building Lifecycle
All (22)Filed (3)Permit Issued (2)Signed Off (2)Inspection (1)Special Inspection (14)
02/12/2026
Signed off — Alteration
GENERAL CONSTRUCTION WORK TO REPAIR & RESTORE EX. 1-STORY STORAGE ROOM ENCLOSURE AT REAR OF BASEMENT FLOOR, INCLUDING COSMETIC FINISHES TO BE SELECTED BY OWNER. STRUCTURAL WORK FILED SEPARATELY BY OTHERS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00638598-I1
09/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ROHAN
06/17/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
06/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ROHAN
06/17/2025
Special inspection requirement — Fenestration air leakage
BRIAN ROHAN
06/17/2025
Special inspection requirement — Air barrier - visual inspection
BRIAN ROHAN
06/17/2025
Special inspection requirement — Fenestration areas
BRIAN ROHAN
06/17/2025
Special inspection requirement — Insulation placement and R values
BRIAN ROHAN
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ROHAN
06/12/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK TO REPAIR & RESTORE EX. 1-STORY STORAGE ROOM ENCLOSURE AT REAR OF BASEMENT FLOOR, INCLUDING COSMETIC FINISHES TO BE SELECTED BY OWNER. STRUCTURAL WORK FILED SEPARATELY BY OTHERS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00638598-P1
12/04/2024
Signed off — Alteration
Provide structural plans in conjunction with general construction application (by other) to reconstruct one story portion.
B00731669-I1
06/04/2024
Permit issued — Structural
B00731669-I1-ST
05/29/2024
Permit issued — General Construction
B00638598-I1-GC
05/01/2023
Filed — Alteration
GENERAL CONSTRUCTION WORK TO REPAIR & RESTORE EX. 1-STORY STORAGE ROOM ENCLOSURE AT REAR OF BASEMENT FLOOR, INCLUDING COSMETIC FINISHES TO BE SELECTED BY OWNER. STRUCTURAL WORK FILED SEPARATELY BY OTHERS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00638598-I1
04/27/2023
Filed — Alteration
Provide structural plans in conjunction with general construction application (by other) to reconstruct one story portion.
B00731669-I1
05/06/2022
Special inspection requirement — Structural Cold-Formed Steel
BRIAN ROHAN
05/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ROHAN
05/06/2022
Special inspection requirement — Subgrade Inspections
BRIAN ROHAN
05/06/2022
Special inspection requirement — Structural Steel - Details
BRIAN ROHAN
05/06/2022
Special inspection requirement — Concrete - Cast-In-Place
BRIAN ROHAN
05/04/2022
Special inspection requirement — Final
BRIAN ROHAN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offGARCIA HOME IMPROVEMENT06/04/2024
DOB NOWGeneral ConstructionSigned-offGARCIA HOME IMPROVEMENT05/29/2024
BISOTISSUEDBROOKLYN SOLARWORKS LLC12/04/2021
BISOTISSUEDSAB CONST02/24/2000
2 projects · most recent 12/23/2021
FiledStatusContractorScope
12/23/2021CompleteBROOKYLN SOLARWORKS, LLC—
07/31/2018CompleteDONALD MCGEACHY, INC.—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
06/17/2025Fenestration and door U-factor and product ratingsBRIAN ROHANenergy_progress
06/17/2025Energy Code Compliance InspectionsBRIAN ROHANprogress
06/17/2025Fire-Resistance Rated ConstructionBRIAN ROHANprogress
06/17/2025Fenestration air leakageBRIAN ROHANenergy_progress
06/17/2025Air barrier - visual inspectionBRIAN ROHANenergy_progress
06/17/2025Fenestration areasBRIAN ROHANenergy_progress
06/17/2025Insulation placement and R valuesBRIAN ROHANenergy_progress
06/17/2025Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
05/06/2022Structural Cold-Formed SteelBRIAN ROHANspecial
05/06/2022Structural Stability – Alterations of existing buildingsBRIAN ROHANspecial
05/06/2022Subgrade InspectionsBRIAN ROHANspecial
05/06/2022Structural Steel - DetailsBRIAN ROHANspecial
05/06/2022Concrete - Cast-In-PlaceBRIAN ROHANspecial
05/04/2022FinalBRIAN ROHANprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00731669-I1Request digital key ↗
08/27/2026B00638598-P1Request digital key ↗
08/27/2026B00638598-I1Request digital key ↗
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit3
08/13/2026B00638598-P1Open ↗
08/13/2026B00638598-I1Open ↗
08/13/2026B00731669-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/30/2021340829330Open ↗
▸BISWORK PERMIT APPLICATION1
12/04/2021340829330Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B00638598-I1Open ↗
09/02/2026B00638598-I1Open ↗
08/22/2026B00731669-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00731669-I1Open ↗
08/27/2026B00638598-I1Open ↗
08/27/2026B00638598-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B00638598-I1Open ↗
08/22/2026B00731669-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/30/2021340829330Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
12/04/2021340829330Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00731669-I1Open ↗
08/27/2026B00638598-P1Open ↗
08/27/2026B00638598-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/30/2021340829330Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/16/2022340829330Open ↗
11/30/2021340829330Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/16/2022340829330Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
02/17/2022340829330Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/30/2021340829330Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/16/2022340829330Open ↗
11/30/2021340829330Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/17/2022340829330Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/17/2022340829330Open ↗
▸BISLANDMARKS SIGNOFF1
02/17/2022340829330Open ↗
▸BISLANDMARKS APPROVAL1
11/30/2021340829330Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/16/2022340829330Open ↗
11/30/2021340829330Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/30/2021340829330Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00638598-I1Open ↗
08/13/2026B00638598-P1Open ↗