← Back
BRONX
Cyrus Place Condominium
4697 THIRD AVENUE · BIN 2129313
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof2p · 2 filings · 8 docs
Floor 81p · 1 filing · 6 docs
Floor 71p · 1 filing · 6 docs
Floor 61p · 1 filing · 6 docs
Floor 51p · 1 filing · 6 docs
Floor 41p · 1 filing · 6 docs
Floor 31p · 1 filing · 6 docs
Floor 21p · 1 filing · 6 docs
Floor 11p · 1 filing · 6 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP307/08/2026
HOME BUILDERS 1 L.P903/22/2026
UPTOWN CONSTRUCTION GROUP503/22/2026
TRI BOROUGH SCAFFOLDING303/22/2026
DREAMYARD CYRUS HOUSING D103/22/2026
HOUSING PRESERVATION DEVELOP1003/21/2026
DREAMYARD CYRUS AVENUE HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
GREEN STUDIO203/21/2026
INDESIGN STUDIO403/21/2026
KP CONSULTING ENGINEER403/21/2026
A1 EXPEDITING SERVICE203/21/2026
WILLIAM VITACCO ASSOCIATES303/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME BUILDERS 1 L.PGeneral Contractor1007/08/2026
M. EARLY PLBG & HTG CORPFire Protection807/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor607/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor407/08/2026
SANG CHEUNGElectrical303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor207/08/2026
CITY SIGNSScaffold207/08/2026
TRIBORO ELEC'L CONTR'G COElectrical203/22/2026
HASSAN CHANNAOUIGeneral Contractor107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMP DESIGN & ENGINEERING1630403/22/2023
AR-TECH ENGINEERING, P.C.6659106/03/2021
SKYLINE ENGINEERING, PLLC267110/03/2019
Building Lifecycle
All (159)Filed (18)Permit Issued (25)Signed Off (13)Violation (37)Inspection (6)Objection (38)Special Inspection (22)
08/13/2026
Violation issued (HPD, open)
C
08/13/2026
Violation issued (HPD, open)
B
08/13/2026
Violation issued (HPD, open)
B
03/17/2026
Violation issued (ECB, closed)
Elevators
02/05/2026
Violation issued (HPD, closed)
B
02/05/2026
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, closed)
C
10/29/2025
Violation issued (ECB, closed)
Elevators
12/27/2024
Violation issued (HPD, closed)
C
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/2024
Violation issued (HPD, closed)
C
07/04/2024
Violation issued (HPD, closed)
A
07/04/2024
Violation issued (HPD, closed)
C
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/28/2023
Signed off — Alteration
ADDITION OF NEW INTERIOR PARTITIONS, CASEWORK, FIXED FURNITURE TO CREATE AN EATING & DRINKING ESTABLISHMENT (DOMINO'S PIZZA)
X00613072-I1
04/26/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/13/2023
Signed off — Alteration
INSTALLATION OF NEW KITCHEN EQUIPMENT AND PLUMBING FIXTURES IN CONJUNCTION WITH JOB # X00613072.
X00608162-I1
04/07/2023
Signed off — Alteration
Temporary standpipe filing in conjunction with NB# 210178751
X00225789-I1
04/07/2023
Violation issued (ECB, closed)
Unknown
03/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
03/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
03/24/2023
Special inspection requirement — Lighting controls
KENNETH PHILOGENE
03/24/2023
Special inspection requirement — Interior lighting power
KENNETH PHILOGENE
03/22/2023
Filed — Alteration
ADDITION OF NEW INTERIOR PARTITIONS, CASEWORK, FIXED FURNITURE TO CREATE AN EATING & DRINKING ESTABLISHMENT (DOMINO'S PIZZA)
X00613072-P1
03/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/10/2023
Signed off — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08047845-I1
03/10/2023
Signed off — Alteration
X08047904-I1
02/21/2023
Permit issued — Sign
X08047904-I1-SG
02/21/2023
Permit issued — Sign
X08047845-I1-SG
02/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
02/17/2023
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
02/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
KENNETH PHILOGENE
02/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
KENNETH PHILOGENE
02/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
KENNETH PHILOGENE
02/11/2023
Filed — Alteration
INSTALLATION OF NEW KITCHEN EQUIPMENT AND PLUMBING FIXTURES IN CONJUNCTION WITH JOB # X00613072.
X00608162-P1
02/09/2023
Special inspection requirement — Lighting controls
KENNETH PHILOGENE
02/09/2023
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
02/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
02/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
02/09/2023
Special inspection requirement — Interior lighting power
KENNETH PHILOGENE
02/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
KENNETH PHILOGENE
02/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
KENNETH PHILOGENE
02/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
KENNETH PHILOGENE
02/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
01/20/2023
Signed off — Alteration
X00131363-I1
01/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/04/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2022
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08047845-I1
12/12/2022
Filed — Alteration
X08047904-I1
12/02/2022
Permit issued — Plumbing
X00608162-I1-PL
11/16/2022
Permit issued — General Construction
X00613072-I1-GC
11/09/2022
Permit issued — Curb Cut
X00131363-I1-CC
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00422155-I1
06/09/2022
Signed off — Alteration
X00247222-I1
06/09/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00533023-I1
05/09/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offELMER DAWSON02/21/2023
DOB NOWSignSigned-offELMER DAWSON02/21/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/02/2022
DOB NOWGeneral ConstructionSigned-offEDUARDO CALIXTO11/16/2022
DOB NOWCurb CutSigned-offHOME BUILDERS 1 L.P11/09/2022
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP04/28/2022
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP03/11/2022
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P12/23/2021
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP11/10/2021
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/29/2021
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/15/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC09/01/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING07/15/2021
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP06/10/2021
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP04/27/2021
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP03/19/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/03/2021
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC11/23/2020
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING11/02/2020
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP10/05/2020
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P08/18/2020
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP03/25/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/18/2020
DOB NOWStandpipeSigned-offM. EARLY PLBG & HTG CORP11/04/2019
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P10/24/2019
BISSDISSUEDM. EARLY PLBG & HTG CORP09/30/2022
BIS—ISSUEDHOME BUILDERS 1 L.P03/28/2022
BISPLISSUEDM. EARLY PLBG & HTG CORP03/08/2022
BISBLISSUEDM. EARLY PLBG & HTG CORP12/23/2021
BISSDISSUEDM. EARLY PLBG & HTG CORP09/27/2021
BISOTISSUEDBEST ENERGY POWER 2015 LL09/07/2021
BISOTISSUEDTRI BOROUGH SCAFFOLDING08/23/2021
BIS—ISSUEDHOME BUILDERS 1 L.P08/20/2021
BISPLISSUEDM. EARLY PLBG & HTG CORP04/26/2021
BIS—ISSUEDHOME BUILDERS 1 L.P03/12/2021
BIS—ISSUEDHOME BUILDERS 1 L.P01/08/2021
BIS—ISSUEDHOME BUILDERS 1 L.P11/23/2020
BISSDISSUEDM. EARLY PLBG & HTG CORP10/20/2020
BISPLISSUEDM. EARLY PLBG & HTG CORP05/04/2020
BIS—ISSUEDHOME BUILDERS 1 L.P01/17/2020
+ 1 more permits on file
10 projects · most recent 06/14/2023
General Wiring
FiledStatusContractorScope
06/14/2023CompleteJOSEPH WEINSTEIN ELECTRIC—
06/13/2023CompleteJOSEPH WEINSTEIN ELECTRIC—
11/30/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
09/27/2022CompleteTRIBORO ELEC'L CONTR'G COGeneral Wiring
10/21/2021CompleteTRIBORO ELEC'L CONTR'G CO59 meters, 57 new_meters
09/22/2021CompleteRJ RUSSO ELECTRIC CO.—
08/27/2020CompleteTUXEDO ELEC'L CONTR'G INC—
08/05/2020CompleteTRIBORO ELEC'L CONTR'G CO—
03/03/2020CompleteBOROWIDE ELECT'L CONTR'S—
02/13/2020CompleteTRIBORO ELEC'L CONTR'G CO1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
01/04/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/24/2023Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
03/24/2023Fire-Resistance Rated ConstructionKENNETH PHILOGENEprogress
03/24/2023Lighting controlsKENNETH PHILOGENEenergy_progress
03/24/2023Interior lighting powerKENNETH PHILOGENEenergy_progress
02/17/2023Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
02/17/2023Energy Code Compliance InspectionsKENNETH PHILOGENEprogress
02/17/2023HVAC-R and service water piping design and insulationKENNETH PHILOGENEenergy_progress
02/17/2023HVAC-R and service water heating equipmentKENNETH PHILOGENEenergy_progress
02/17/2023HVAC-R and service water heating system controlsKENNETH PHILOGENEenergy_progress
02/09/2023Lighting controlsKENNETH PHILOGENEenergy_progress
02/09/2023Energy Code Compliance InspectionsKENNETH PHILOGENEprogress
02/09/2023Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
02/09/2023Fire-Resistance Rated ConstructionKENNETH PHILOGENEprogress
02/09/2023Interior lighting powerKENNETH PHILOGENEenergy_progress
02/09/2023HVAC-R and service water piping design and insulationKENNETH PHILOGENEenergy_progress
02/09/2023HVAC-R and service water heating equipmentKENNETH PHILOGENEenergy_progress
02/09/2023HVAC-R and service water heating system controlsKENNETH PHILOGENEenergy_progress
02/09/2023Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
08/24/2021FinalSunil Saigalprogress
04/28/2021FinalEric Fosterprogress
03/16/2020FinalJULIO SALCEDO-FERNANDEZprogress
10/16/2019FinalPaul Perdekprogress
▾Documents — 365 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch8
08/24/2026X00613072-P1Request digital key ↗
08/24/2026X00613072-I1Request digital key ↗
08/23/2026X08047845-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold6
08/26/2026X00332972-I1Request digital key ↗
08/25/2026X00422155-I1Request digital key ↗
08/25/2026X00426666-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026X00247222-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00327429-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026X00131363-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/15/2026X00225789-I1Request digital key ↗
▸Applications & Permits72
▸BISPLAN / WORK APPROVAL APPLICATION53
03/24/2023210178751Open ↗
12/22/2022210178751Open ↗
12/21/2022210178751Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION16
03/29/2022210178751Open ↗
12/23/2021220678292Open ↗
09/07/2021240308742Open ↗
Showing 3 of 16 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
11/04/2021220677042Open ↗
Showing 1 of 3 on file for this type
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM3
05/18/2021210178751Open ↗
03/04/2021210178751Open ↗
Showing 2 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
07/27/2021220212623Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
07/27/2021220212623Open ↗
Showing 1 of 2 on file for this type
▸BISVERIFY TAX LOT1
08/29/2023210178751Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/27/2021220212623Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/22/2022210178751Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026X00131363-I1Open ↗
08/26/2026X00247222-I1Open ↗
08/26/2026X00327429-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026X00608162-I1Open ↗
09/01/2026X00608162-I1Open ↗
09/01/2026X00608162-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
05/10/2023210178751Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00608162-I1Open ↗
08/26/2026X00613072-P1Open ↗
08/25/2026X00608162-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/01/2021240308742Open ↗
08/20/2021240305718Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/01/2021240308742Open ↗
08/20/2021240305718Open ↗
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING14
10/18/2022210178751Open ↗
10/13/2022210178751Open ↗
07/26/2022210178751Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS3
05/10/2023210178751Open ↗
05/10/2023210178751Open ↗
05/01/2023210178751Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
05/10/2023210178751Open ↗
05/10/2023210178751Open ↗
05/01/2023210178751Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
12/08/2022220678292Open ↗
03/31/2022210178751Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHEATING SYSTEMS2
12/05/2022220678292Open ↗
02/10/2022210178751Open ↗
▸BISSPRINKLER SYSTEMS1
02/15/2022220678899Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
05/18/2021210178751Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
08/01/2022220677042Open ↗
05/06/2022210178751Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/03/2022240308742Open ↗
09/27/2022240308742Open ↗
09/19/2022240308742Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/08/2022220678292Open ↗
09/19/2022240308742Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/03/2022240308742Open ↗
09/27/2022240308742Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
12/08/2022220678292Open ↗
04/04/2022210178751Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00608162-I1Open ↗
08/13/2026X00613072-I1Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/01/2021240308742Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
09/27/2022240308742Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/31/2022210178751Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/31/2022210178751Open ↗
▸BISELECTRIC MOTORS1
03/31/2022210178751Open ↗
▸BISLIGHTING CONTROLS1
03/31/2022210178751Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/31/2022210178751Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY15
10/03/2022240308742Open ↗
09/27/2022240308742Open ↗
09/19/2022240308742Open ↗
Showing 3 of 15 on file for this type
▸BISPOST-INSTALLED ANCHORS2
02/15/2022220678899Open ↗
02/10/2022210178751Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONCRETE - PRESTRESSED1
02/09/2022210178751Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/09/2022210178751Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
02/09/2022210178751Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
05/19/2022210178751Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/09/2022210178751Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs39
▸BISLETTERS - SUPPORTING DOCUMENTATION14
11/04/2021220677042Open ↗
08/26/2021210178751Open ↗
06/23/2021220677042Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
12/22/2022210178751Open ↗
04/20/2022210178751Open ↗
12/09/2021210178751Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/13/2023220678899Open ↗
12/23/2022240305718Open ↗
12/13/2022220678292Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026X00131363-I1Open ↗
08/13/2026X00247222-I1Open ↗
08/13/2026X00225789-I1Open ↗
▸BISSUPERSEDING LETTER2
03/29/2022210178751Open ↗
01/11/2021210178751Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026X00225789-I1Open ↗
08/13/2026X00247222-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00225789-I1Open ↗
▸DOB NOWOther Documents - Prior to Approval1
08/13/2026X00225789-I1Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT (FINAL): PW35
11/17/2022240305718Open ↗
11/17/2022220678899Open ↗
11/17/2022220678292Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT2
09/01/2021240308742Open ↗
08/20/2021240305718Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
01/11/2021210178751Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms32
▸BISADDITIONAL INFORMATION17
09/13/2023210178751Open ↗
09/12/2023210178751Open ↗
04/17/2023210178751Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
03/29/2022210178751Open ↗
03/18/2021210178751Open ↗
Showing 2 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/01/2021240308742Open ↗
08/20/2021240305718Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/06/2022210178751Open ↗
08/10/2021220212623Open ↗
07/27/2021220212623Open ↗
▸BISMAINTENANCE INFORMATION2
12/12/2022220678292Open ↗
03/31/2022210178751Open ↗
▸BISTax Abatement Miscellaneous2
10/05/2022240308742Open ↗
10/05/2022240308742Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
02/09/2022210178751Open ↗
▸BISVESTIBULES1
03/31/2022210178751Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
01/27/2022210178751Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/31/2022210178751Open ↗