← Back
One story retail building
47-02 BELL BOULEVARD
QUEENS · BIN 4157332
💬 Discuss this project
1949Year Built
1Stories
K1Building Class
R4BZoning
17,090 sfGross Floor Area
9Units
12 Open Violations 6 unresolved · 6 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: HANSU ENTERPRISES INC · 21,760 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 14 docs
Floor 1Under Construction7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LATERNA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P GEORGOPOULOS ARCHITECT PC406/11/2026
SUNG HO SHIN ARCHITECT, PC103/02/2026
ISEED CONSTRUCTION INC412/12/2025
H G LEE ARCHITECT PC110/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IONIAN DEVELOPMENT GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISEED CONSTRUCTION INC8336412/12/2025
Building Lifecycle
All (115)Filed (10)Permit Issued (1)Violation (35)Inspection (1)Objection (38)Special Inspection (30)
07/02/2026
Objection raised — Other
07/02/2026
Objection raised — Other
07/02/2026
Objection raised — Other
06/24/2026
Objection raised — Accessibility
06/24/2026
Objection raised — Accessibility
06/24/2026
Objection raised — Accessibility
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Zoning
06/24/2026
Objection raised — Zoning
06/24/2026
Objection raised — Scope
06/24/2026
Objection raised — Scope
06/24/2026
Objection raised — Energy
06/24/2026
Objection raised — Fire_Protection
06/11/2026
Filed — No Work
Q01414579-I1
06/09/2026
Objection resolved — Addressed
04/05/2026
Objection raised — Scope
04/01/2026
Objection raised — Admin
03/30/2026
Objection raised — Admin
03/30/2026
Objection raised — Scope
03/23/2026
Filed — Alteration CO
Structural application filed in conjunction with GC application.
Q01316991-S1
03/23/2026
Filed — Alteration CO
Structural application filed in conjunction with GC application.
Q01316991-S2
03/17/2026
Special inspection requirement — Structural Steel - Details
03/17/2026
Special inspection requirement — Structural Cold-Formed Steel
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/16/2026
Special inspection requirement — Subgrade Inspections
03/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/16/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Filed — Alteration
Removal of illegal wood-frame storage shed (#47-04) and illegal canopy, post, and beam with roof (#47-20) at the rear of the premises. This application addresses ECB Violations #39120266R and #39091333H. There is no change in use, occupancy, or egress und
Q01365285-I1
01/27/2026
Special inspection requirement — Final
01/27/2026
Special inspection requirement — Footing and Foundation
01/27/2026
Special inspection requirement — Final
01/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2026
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/19/2025
Objection raised — Mechanical
12/19/2025
Objection raised — Cost
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YIPENG LUAN
12/16/2025
Objection resolved — Addressed
12/15/2025
Objection raised — Other
12/12/2025
Filed — Alteration
TO PROPOSE GAS WORK FOR EX.STORE AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01293267-P1
12/09/2025
Violation issued (FDNY_ORDER, closed)
12/09/2025
Violation issued (FDNY_ORDER, closed)
12/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YIPENG LUAN
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
12/09/2025
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
12/01/2025
Filed — Alteration
TO INSTALL NEW ELECTRIC COOKING EQUIPMENT IN EXISTING STORE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01293192-S1
11/26/2025
Objection resolved — Addressed
11/25/2025
Special inspection requirement — Mechanical Systems
YIPENG LUAN
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
YIPENG LUAN
11/25/2025
Special inspection requirement — Final
YIPENG LUAN
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YIPENG LUAN
11/21/2025
Objection raised — Admin
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.11/13/2025
BISOTISSUEDVAGGELAS CONSTRUCTION GR*11/11/2020
BISMHISSUEDDORIC BUILDERS INC07/08/2013
BISOTISSUEDNEXTCOM CONSTRUCTION, INC.06/19/2009
BISOTISSUEDWONG MAN LIC. CONTRACTOR03/24/2009
BISPLISSUEDS & L PLUMBING INC03/24/2009
BISFPISSUEDIDEAL FIRE SYSTEMS INC10/18/2006
BISFPISSUEDLUND FIRE PRODUCTS CO INC12/02/2005
BISOTISSUEDKORMAN DESIGN & BUILD08/05/2005
BISEQISSUEDKORMAN DESIGN & BUILD08/05/2005
BISOTISSUEDDBA DEZO'S GEN CONTR.07/27/2005
BISOTISSUEDHI TECH INC10/23/2003
BISPLISSUEDAVON PLBG & HTG INC10/23/2003
BISFPISSUEDIDEAL FIRE CONTROL INC.01/29/2001
BISPLISSUEDMAINLAND PLG. & HTG.06/08/2000
BISOTISSUEDHYUN DAI HI-TECHNOLOGY INC.11/20/1998
BISFBISSUEDDUAL FUEL PLUMBING & HTG07/08/1997
BISOTISSUEDSPACE SIGN & AWNING CORP.04/10/1997
BISOTISSUEDTWO TITANS FOOD CORP02/16/1996
BIS—ISSUEDTHIRTY FOUR SQUARE CORP11/04/1993
BISMHISSUEDTHIRTY FOUR SQAURE10/28/1993
BISFPISSUEDSENTINEL FIRE CONTROL.INX.07/21/1993
BISEQISSUEDTHIRTY FOUR SQUARE CORP.05/19/1993
BISOTISSUEDTHIRTY FOUR SQAURE05/03/1993
BISFPISSUEDMASTER FIRE PREVENTION11/09/1992
BISFPISSUEDIDEAL FIRE CONTROL INC.04/11/1991
BISMHISSUEDHYUN DAI HI-TECHNOLOGY INC.03/20/1991
BISMHISSUEDAIRCOMATIC AIR-CONDITIONING11/01/1990
BISMHISSUEDAIRCOMATIC AIR-CONDITIONING CORP05/25/1990
1 project · most recent 12/01/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/01/2025——Ventilation Systems
Ventilation
N/A Econair 5,400 CFM · Kitchen Exhaust ×2
Delhi BI-24RM 5,400 CFM · Kitchen Exhaust ×1
1 project · most recent 12/12/2025
Gas
FiledStatusContractorScope
12/12/2025Permit IssuedAMERICAN STANDARD P&H CORGas
1 project · most recent 03/23/2026
Steel
FiledStatusContractorScope
03/23/2026——Steel
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
03/17/2026Structural Steel - Details—special
03/17/2026Structural Cold-Formed Steel—special
03/17/2026Structural Stability – Alterations of existing buildings—special
03/16/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/16/2026Subgrade Inspections—special
03/16/2026Excavations - Sheeting, Shoring, and Bracing—special
03/16/2026Structural Stability – Alterations of existing buildings—special
03/16/2026Subsurface Conditions – Fill Placement & In-Place Density—special
01/27/2026Final—progress
01/27/2026Footing and Foundation—progress
01/27/2026Final—progress
12/19/2025Fire-Resistant Penetrations and JointsYIPENG LUANspecial
12/19/2025Energy Code Compliance InspectionsYIPENG LUANprogress
12/19/2025HVAC-R and service water piping design and insulationYIPENG LUANenergy_progress
12/09/2025HVAC-R and service water piping design and insulationYIPENG LUANenergy_progress
12/09/2025Fire-Resistant Penetrations and JointsYIPENG LUANspecial
12/09/2025Energy Code Compliance InspectionsYIPENG LUANprogress
11/25/2025Mechanical SystemsYIPENG LUANspecial
11/25/2025Energy Code Compliance InspectionsYIPENG LUANprogress
11/25/2025FinalYIPENG LUANprogress
11/25/2025Fire-Resistant Penetrations and JointsYIPENG LUANspecial
11/11/2025Interior lighting power—energy_progress
11/11/2025Air barrier - visual inspection—energy_progress
11/11/2025Fenestration air leakage—energy_progress
11/11/2025Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 35.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/21/2026Q01102394-I1Request digital key ↗
08/18/2026Q01293267-P1Request digital key ↗
08/18/2026Q01293267-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026Q01414579-I1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION5
11/11/2020440638142Open ↗
07/11/2013420854962Open ↗
06/22/2009420033975Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
10/15/2020440638142Open ↗
06/11/2013420854962Open ↗
06/19/2009420033975Open ↗
Showing 3 of 5 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/04/2013420854962Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01316991-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026Q01102394-I1Open ↗
08/18/2026Q01293267-P1Open ↗
08/18/2026Q01293267-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026Q01293192-S1Open ↗
08/29/2026Q01293192-S1Open ↗
08/25/2026Q01293192-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01316991-S1Open ↗
08/29/2026Q01293192-S1Open ↗
08/29/2026Q01293192-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/04/2013420854962Open ↗
06/14/2013420854962Open ↗
05/28/2009410237382Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/14/2013420854962Open ↗
06/19/2009420033975Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/14/2013420854962Open ↗
06/19/2009420033975Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/15/2020440638142Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/15/2020440638142Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/15/2020440638142Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
04/27/2009410237382Open ↗
03/18/2009410237382Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/27/2009410237382Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/04/2013420854962Open ↗
▸BISEQUIPMENT USE PERMITS1
09/04/2013420854962Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/19/2009420033975Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/18/2026Q01293267-P1Open ↗
08/18/2026Q01293267-I1Open ↗
08/18/2026Q01293192-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/19/2009420033975Open ↗
03/18/2009410237382Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2020440638142Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/11/2020440638142Open ↗
10/15/2020440638142Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/04/2013420854962Open ↗
06/14/2013420854962Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/15/2020440638142Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/03/2021440638142Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/03/2021440638142Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/04/2013420854962Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/03/2021440638142Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/03/2021440638142Open ↗
▸BISFENESTRATION AREAS1
12/03/2021440638142Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/11/2020440638142Open ↗
10/15/2020440638142Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/03/2021440638142Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
12/03/2021440638142Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/03/2021440638142Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026Q01316991-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026Q01316991-S1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/06/2021440638142Open ↗
09/04/2013420854962Open ↗
08/11/2009420033975Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/19/2009420033975Open ↗
03/19/2009410237382Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/11/2009420033975Open ↗
05/28/2009410237382Open ↗
▸BISFINAL1
12/03/2021440638142Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
10/15/2020440638142Open ↗
09/04/2013420854962Open ↗
06/14/2013420854962Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/03/2021440638142Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
06/11/2013420854962Open ↗
06/19/2009420033975Open ↗
03/18/2009410237382Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/15/2020440638142Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/17/2026Q01316991-I1Open ↗
▸DOB NOWPlot Diagram1
08/17/2026Q01316991-S1Open ↗