ECB05/14/2025OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C/O OR DOB RECORDS. NOTED: AT TIME OF INSPECTION FRONT PREMISES LOCATED AT 47TH AVE BETWEEN 30TH ST & 30TH PL OBSERVED APPROX. 14 VEHICLES PARKED AT FRONT YARD OF PREMI$1K due
DOB02/03/2017FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB11/03/2016FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB08/03/2016FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB06/03/2013FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
ECB03/11/2016B254,46,50. B254 FAILURE TO MAINTAIN BOILER,WITNESSED; 4B-LOW WAER CUTOFF ON BOTH BOILERS INSTALLED INCORRECTLY; TOO LOW-WILL NOT SHUT DOWN BOILER WHEN WATER IS REQUIRED-WRONG WAER LEVEL; 50-MISSING THERMOSTATNothing owed — awaiting certificate of correction
ECB12/31/2007B4A,16,50A,B,C,D,E,F.50A-NO PIG TAIL ON PRESSURETROLES.50B-NO SWING CHECK ON BOILER MAKE UP WATER.50C-POP SAFETY NO PIPES DOWN TO FLOOR.50D-BACKFLOW NOT PIPED DOWN TO FLOOR.50E-BOILER FLUE PIPE NOT PROPERLY INSNothing owed — awaiting certificate of correction
ECB12/31/2007B4A,34B,38,50A,B,C.50A-HOLE IN CHIMNEY.50B-WATER PIPES NO SUPPORTED.50C-NO SWING CHECK VALVE ON BOILER MAKEUP WATER.Nothing owed — awaiting certificate of correction
ECB12/31/2007B4A,23A,50A,B,C.50A-NO COVERS ON CONTROLS.50B-NO SWING CHECK VALVE ON MAKE UP BOILER WATER.50C-NO RATING PLATE ON BOILER.Nothing owed — awaiting certificate of correction
ECB12/31/2007B4A,32A,38,50A,B.50A-NO RATING PLATE ON BOILER.50B-NO SWING CHECK ON BOILER MAKE UP WATER.Nothing owed — awaiting certificate of correction
ECB06/10/2002FAILURE TO MAINTAIN: ON S/E CORNER IN BASEMENT BOILER CEILING NOT COVER WITH FIREPROOF MATERIAL ALL BATHROOM BOILER ROOM AND OTEHR AERA AROUND PIPES NOT SEAL WITH FIREPROOF MATERIALS WHERE ITS REQUIRED FIRESTOPNothing owed — awaiting certificate of correction
ECB07/24/199873,0,02,36,L,12,15,B,07,15,D,06,15,J,01,01,M,07 15D-PROPERLY SECURE DOOR TRACKS 15B-PROVIDE PROPER DOOR ON LOADING SIDENothing owed — awaiting certificate of correction
ECB07/24/199829,B,07,05,I,11,15,X,11,73,0,02,01,,M,07,15,M,07 29-PROVIDE PROPER COUNTER WIGHT RUN BY 15-PROVIDE HOIST WAY DOOR GUIDENothing owed — awaiting certificate of correction
ECB02/17/199835O73O50YNothing owed — awaiting certificate of correction
ECB06/16/1993WORK WITHOUT A PERMIT: WORK NOTED: ERECTED PARTITION SEPERATING OFFICE AREA FROM (STORAGE OR WAREHOUSE) AREA. PARTITION IS APPROX. 8' LONG BY 9' HIGH. WITH HALLOW GORE DOOR. WORK IS AT 6TH FLOOR SOUTH SIDE. REMNothing owed — awaiting certificate of correction
ECB08/30/19913O,14M,15L,17I,35O,58O,59O,73#,3 CLEAN TOP OF CAR. 15 2ND FLOOR. 17 1ST & 5TH FLOOR 73 CONDUCT A 5 YR TEST & FILE ELEV. 3 REPORT.Nothing owed — awaiting certificate of correction