ECB01/04/2006WORK WITHOUT A PERMIT: WORK NOTED CONSTRUCTION OF THREE PIECE BATHROOMTOILET, BASIN AND TUB IN THE CELLAR. REMEDY: OBTAIN A PERMIT IF FEASIBLE/ OR RESTORE THE CELLAR TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 4,000 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.