← Back
BuildNYC
Office with commercial, 1-6 stories
47-11 AUSTELL PLACE
QUEENS · BIN 4000740
💬 Discuss this project
1916Year Built
5Stories
O5Building Class
M1-4Zoning
155,265 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Office with commercial, 1-6 stories · Owner of record: Maple Drake Austell Owner · 40,500 sf lot · 3.83 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCannon Hill Capital Partners12p · 1 filing · 20 docs
Floor 5Cannon Hill Capital Partners59p · 3 filings · 20 docs
Floor 4Cannon Hill Capital Partners58p · 2 filings · 20 docs
Floor 3Cannon Hill Capital Partners58p · 2 filings · 20 docs
Floor 2Cannon Hill Capital Partners61p · 2 filings · 20 docs
Floor 1Cannon Hill Capital Partners65p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Maple Drake Austell Owner6203/22/2026
Confort & Co1503/21/2026
Cannon Hill Capital Partners1407/08/2026
Normandy Realty303/22/2026
E.C. Contracting203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/05/2015$35.0M—AUSTELL TEI LLC → MAPLE DRAKE AUSTELL OWNER, LLC$225/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture706/16/2025
Florinela Muresan709/28/2023
Kimmerle Newman Architects106/25/2019
Jose L. Pena, P.E112/18/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
City Expediting2803/21/2026
Louis Striar203/21/2026
Codegreen103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cityscape BuildersGeneral Contractor407/08/2026
Z-Car-DSign hanger107/08/2026
Prime Piping & HeatingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma9168909/28/2023
Building Lifecycle
All (128)Filed (16)Permit Issued (5)Signed Off (5)Violation (60)Inspection (4)Objection (12)Special Inspection (26)
06/16/2025
Filed — No Work
Q01215837-I1
06/16/2025
Filed — No Work
Q01215844-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2023
Signed off — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-S3
10/13/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/28/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P5
09/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/27/2023
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
09/19/2023
Signed off — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-S1
09/19/2023
Signed off — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-I1
09/18/2023
Signed off — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-S2
09/14/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P4
09/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/14/2023
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
09/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/14/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
09/14/2023
Special inspection requirement — Final
Soorjbally Harilall
09/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/11/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P3
09/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
SOORJBALLY HARILALL
09/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
09/07/2023
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/07/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/07/2023
Special inspection requirement — Final
Soorjbally Harilall
09/07/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
09/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/06/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P2
09/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
09/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/05/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
09/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/17/2023
Objection raised — Admin
08/17/2023
Objection raised — Inspections
08/17/2023
Objection raised — Admin
08/17/2023
Objection raised — Other
08/16/2023
Filed — No Work
Q00905420-P1
08/16/2023
Filed — No Work
Q00905428-I1
08/16/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-P1
08/15/2023
Objection resolved — Addressed
08/11/2023
Objection raised — Other
08/10/2023
Filed — No Work
Q00905420-I1
08/01/2023
Permit issued — Mechanical Systems
Q00905085-S2-MS
07/31/2023
Permit issued — Sprinklers
Q00905085-S3-EW-SP
07/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/21/2023
Filed — Alteration
T.U.P. FILING FOR ASYLUM SEEKER RESPITE CENTER PURSUANT TO NO.230. SP WORK AT FLOOR 001-005 EXISTING 5 STORY BUILDING. ATTACHED COMMISISONERS OK TO FILE FOR TUP DATED 07/17/2023
Q00905085-S3
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCityscape Builders08/01/2023
DOB NOWSprinklersSigned-offAmb Mechanical07/31/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating07/21/2023
DOB NOWGeneral ConstructionSigned-offCityscape Builders07/21/2023
DOB NOWSignSigned-offZ-Car-D12/21/2018
BISPLISSUEDTristate Plumbing Services09/13/2024
BISPLISSUEDTristate Plumbing Services09/13/2024
BISPLISSUEDTristate Plumbing Services08/08/2023
BISPLISSUEDTristate Plumbing Services07/25/2023
BIS—ISSUEDSuffolk Construction Company06/15/2020
BISSDISSUEDA + Sprinkler02/26/2020
BISPLISSUEDTristate Plumbing Services02/18/2020
BISPLISSUEDTristate Plumbing Services02/18/2020
BISFSISSUEDEast Coast Petroleum07/19/2019
BIS—ISSUEDD.F. Pray07/17/2019
BISOTISSUEDD.F. Pray07/17/2019
BISOTISSUEDD.F. Pray07/17/2019
BISOTISSUEDD.F. Pray07/17/2019
BISOTISSUEDD.F. Pray07/17/2019
BISMHISSUEDD.F. Pray04/23/2019
BISOTISSUEDD.F. Pray04/22/2019
BISOTISSUEDD.F. Pray04/19/2019
BIS—ISSUEDD.F. Pray04/19/2019
BISOTISSUEDD.F. Pray04/19/2019
BISMHISSUEDD.F. Pray04/19/2019
BISOTISSUEDD.F. Pray04/12/2019
BISEQISSUEDD.F. Pray10/15/2018
BISSPISSUEDA + Sprinkler09/24/2018
BISSDISSUEDA + Sprinkler09/21/2018
BISPLISSUEDTristate Plumbing Services07/12/2018
BISPLISSUEDTristate Plumbing Services07/12/2018
BISOTISSUEDD.F. Pray06/25/2018
BISOTISSUEDD.F. Pray06/25/2018
BISOTISSUEDD.F. Pray06/25/2018
BISOTRE-ISSUEDD.F. Pray06/25/2018
BISMHISSUEDD.F. Pray06/25/2018
BISOTISSUEDD.F. Pray06/25/2018
BIS—ISSUEDD.F. Pray06/25/2018
BISOTISSUEDD.F. Pray06/25/2018
BISEQISSUEDD.F. Pray05/15/2018
+ 15 more permits on file
2 projects · most recent 09/21/2023
General Wiring
FiledStatusContractorScope
09/21/2023CompleteLightforce Electrical Contng IGeneral Wiring
03/01/2018Permit IssuedMer ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/27/2023Tenant Protection Plan Compliance—special
09/27/2023Sprinkler SystemsSOORJBALLY HARILALLspecial
09/14/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/14/2023Mechanical SystemsSOORJBALLY HARILALLspecial
09/14/2023Tenant Protection Plan Compliance—special
09/14/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
09/14/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/14/2023Shutoff dampersSoorjbally Harilallenergy_progress
09/14/2023FinalSoorjbally Harilallprogress
09/14/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
09/08/2023Tenant Protection Plan ComplianceSOORJBALLY HARILALLspecial
09/08/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/07/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
09/07/2023Mechanical SystemsSOORJBALLY HARILALLspecial
09/07/2023Fire-Resistant Penetrations and Joints—special
09/07/2023Tenant Protection Plan Compliance—special
09/07/2023FinalSoorjbally Harilallprogress
09/07/2023Shutoff dampersSoorjbally Harilallenergy_progress
09/07/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/07/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
09/05/2023Tenant Protection Plan Compliance—special
09/05/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
09/05/2023HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
09/05/2023Maintenance informationSoorjbally Harilallenergy_progress
09/05/2023HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
Latest 25 of 26.
▾Documents — 699 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch10
08/28/2026Q00104070-I1Request digital key ↗
08/24/2026Q00905085-P1Request digital key ↗
08/24/2026Q00905085-S3Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly6
08/24/2026Q00905420-I1Request digital key ↗
08/24/2026Q00905428-I1Request digital key ↗
08/20/2026Q01215837-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits181
▸BISPLAN / WORK APPROVAL APPLICATION104
10/16/2023420658577Open ↗
10/16/2023421380696Open ↗
09/12/2023420658577Open ↗
Showing 3 of 104 on file for this type
▸BISWORK PERMIT APPLICATION76
10/24/2023420658577Open ↗
10/11/2023421380696Open ↗
06/22/2020420658577Open ↗
Showing 3 of 76 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
08/22/2023420658577Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/21/2023420658577Open ↗
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications111
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
11/05/2020421543949Open ↗
11/05/2020421543949Open ↗
06/29/2020421454795Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00104070-I1Open ↗
08/28/2026Q00184157-I1Open ↗
08/24/2026Q00905428-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00905085-P4Open ↗
09/01/2026Q00905085-P4Open ↗
08/30/2026Q00905085-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00905085-P4Open ↗
08/31/2026Q00905085-S1Open ↗
08/31/2026Q00905085-S1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment36
▸BISSCHEDULE B - PLUMBING20
09/12/2023420658577Open ↗
08/23/2023421380696Open ↗
08/21/2023421380696Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS5
06/09/2025421380696Open ↗
12/04/2024421380696Open ↗
09/07/2022420658577Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
06/09/2025421380696Open ↗
06/09/2025421380696Open ↗
09/06/2022420658577Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/21/2023420658577Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
09/23/2021420658577Open ↗
12/21/2020421373864Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026Q00104070-I1Open ↗
08/24/2026Q00905085-S3Open ↗
08/24/2026Q00905085-S2Open ↗
Showing 3 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
10/07/2021421393003Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
06/29/2020421454795Open ↗
09/11/2019421358257Open ↗
09/11/2019421358257Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/25/2020420658577Open ↗
08/25/2020420658577Open ↗
07/09/2020421380696Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
08/15/2020421543949Open ↗
06/29/2020421454795Open ↗
09/11/2019421358257Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
07/09/2020421380696Open ↗
07/09/2020420658577Open ↗
06/10/2020421932564Open ↗
▸Inspections & Test Reports57
▸BISTECHNICAL REPORT: RESPONSIBILITY32
08/27/2020421543949Open ↗
08/25/2020421543949Open ↗
08/15/2020421543949Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER10
09/23/2021420658577Open ↗
09/23/2021420658577Open ↗
09/23/2021420658577Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE2
07/13/2020420658577Open ↗
06/29/2020420658577Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
09/21/2023421380696Open ↗
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
12/06/2024421380696Open ↗
10/07/2021421393003Open ↗
01/26/2021420658577Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/24/2026Q00905085-P1Open ↗
08/24/2026Q00905085-S3Open ↗
08/24/2026Q00905085-S2Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
03/09/2020420658577Open ↗
Showing 1 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
12/21/2020421373864Open ↗
02/18/2020440348134Open ↗
Showing 2 of 10 on file for this type
▸BISSUPERSEDING LETTER9
06/22/2020420658577Open ↗
06/22/2020420658577Open ↗
Showing 2 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT30
09/28/2021420658577Open ↗
08/27/2020421543949Open ↗
06/29/2020421454795Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
08/23/2023421455981Open ↗
08/23/2023421380696Open ↗
10/01/2021421393003Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
08/01/2019420658577Open ↗
Showing 1 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: ENGINEERS AFFIDAVIT1
12/21/2020421373864Open ↗
▸Filing & Intake Forms91
▸BISADDITIONAL INFORMATION51
09/28/2023420658577Open ↗
09/13/2023421380696Open ↗
01/25/2021421380696Open ↗
Showing 3 of 51 on file for this type
▸BISEFILING COVER SHEET24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISBOROUGH INTAKE FORM12
10/24/2023420658577Open ↗
06/29/2020420658577Open ↗
06/22/2020420658577Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
09/23/2021420658577Open ↗
09/23/2021420658577Open ↗
Showing 2 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/21/2020421373864Open ↗
12/21/2020421373864Open ↗
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
12/21/2020421373864Open ↗