Two family brick
47-12 204 STREET
QUEENS · BIN 4623675
💬 Discuss this project
2023Year Built
3Stories
B1Building Class
R3-1Zoning
6,077 sfGross Floor Area
2Units
Two family brick · 8,240 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Roof1p · 1 filing · 7 docs
Floor 39p · 1 filing · 20 docs
Floor 212p · 4 filings · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar11p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/04/2022$950K—— → —— not available
11/22/2019$880K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT803/04/2024
ROHAN ENGINEERING, PC603/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VRD DEVELOPMENT1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BIN LING CONSTRUCTION LLCGeneral Contractor1407/08/2026
210 CONSTRUCTION CORPGeneral Contractor507/08/2026
DYNASTY CONTRACTING LLCGeneral Contractor303/21/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
RRP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513703/04/2024
TRIANGLE INSPECTION & TES7495310/03/2023
ROHAN ENGINEERING, PC2600303/02/2021
Building Lifecycle
All (74)Filed (14)Permit Issued (11)Signed Off (3)Inspection (6)Objection (10)Special Inspection (30)
05/20/2024
Signed off — Alteration
Q08032026-I1
05/16/2024
Signed off — Alteration
FILED PLUMBING WORK FOR A NEW 2-FAMILY HOUSE. FILED IN CONJUNCTION WITH NB #Q00743286
Q00790217-I1
04/18/2024
Permit issued — Mechanical Systems
Q08032026-I1-MS
04/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2024
Special inspection requirement — Metering
DEZHANG FANG
03/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
03/12/2024
Special inspection requirement — Interior lighting power
DEZHANG FANG
03/12/2024
Special inspection requirement — Fenestration areas
DEZHANG FANG
03/12/2024
Special inspection requirement — Permanent certificate
DEZHANG FANG
03/12/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
03/12/2024
Special inspection requirement — Protection of exposed foundation insulation
DEZHANG FANG
03/12/2024
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
03/12/2024
Special inspection requirement — Air barrier — testing
DEZHANG FANG
03/12/2024
Special inspection requirement — Electric vehicle service equipment requirements
DEZHANG FANG
03/12/2024
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
03/12/2024
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
03/12/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
03/12/2024
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
03/12/2024
Special inspection requirement — Masonry
DEZHANG FANG
03/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
03/12/2024
Special inspection requirement — Structural Steel - Details
DEZHANG FANG
03/12/2024
Special inspection requirement — Structural Steel - High Strength Bolting
DEZHANG FANG
03/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/12/2024
Special inspection requirement — Footing and Foundation
DEZHANG FANG
03/12/2024
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
03/12/2024
Special inspection requirement — Final
DEZHANG FANG
03/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
03/12/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
03/04/2024
Filed — New Building
PROPOSED A NEW DETACHED 2-FAMILY 3-STORY DWELLINGS.
Q00743286-P2
02/08/2024
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE
Q00712871-I1
01/04/2024
Permit issued — Foundation
Q00743286-I1-GC-CX
11/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/23/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/05/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
10/05/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/05/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
10/05/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
10/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
10/03/2023
Filed — Alteration
FILED PLUMBING WORK FOR A NEW 2-FAMILY HOUSE. FILED IN CONJUNCTION WITH NB #Q00743286
Q00790217-P2
09/15/2023
Filed — Alteration
Q08032026-I1
07/06/2023
Permit issued — Construction Fence
Q00712871-I1-FN
06/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2023
Filed — Alteration
FILED PLUMBING WORK FOR A NEW 2-FAMILY HOUSE. FILED IN CONJUNCTION WITH NB #Q00743286
Q00790217-P1
04/20/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/09/2023
Permit issued — Plumbing
Q00790217-I1-PL
02/20/2023
Filed — New Building
PROPOSED A NEW DETACHED 2-FAMILY 3-STORY DWELLINGS.
Q00743286-P1
01/20/2023
Filed — Alteration
FILED PLUMBING WORK FOR A NEW 2-FAMILY HOUSE. FILED IN CONJUNCTION WITH NB #Q00743286
Q00790217-I1
01/17/2023
Permit issued — Foundation
Q00743286-I1-FO-EA
01/16/2023
Permit issued — Earth Work
Q00743286-I1-GC-CX
07/22/2022
Objection raised — Zoning
07/22/2022
Objection resolved — Addressed
07/22/2022
Objection raised — Inspections
07/22/2022
Objection resolved — Addressed
07/22/2022
Objection raised — Zoning
07/22/2022
Objection resolved — Addressed
07/22/2022
Objection raised — Zoning
07/22/2022
Objection resolved — Addressed
07/22/2022
Objection raised — Energy
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBIN LING CONSTRUCTION LLC04/18/2024
DOB NOWFoundationPermit IssuedBIN LING CONSTRUCTION LLC01/04/2024
DOB NOWConstruction FenceSigned-offBIN LING CONSTRUCTION LLC07/06/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP03/09/2023
DOB NOWFoundationSigned-offDYNASTY CONTRACTING LLC01/17/2023
DOB NOWEarth WorkPermit IssuedBIN LING CONSTRUCTION LLC01/16/2023
DOB NOWConstruction FenceSigned-offBIN LING CONSTRUCTION LLC07/14/2022
DOB NOWConstruction FenceSigned-offBIN LING CONSTRUCTION LLC04/15/2022
DOB NOWConstruction FencePermit Issued210 CONSTRUCTION CORP03/30/2022
DOB NOWConstruction FencePermit Issued210 CONSTRUCTION CORP03/02/2021
DOB NOWConstruction FencePermit Issued210 CONSTRUCTION CORP02/15/2020
2 projects · most recent 03/01/2021
Storm Gas Water/Sanitary
FiledStatusContractorScope
03/01/2021——Gas, Storm, Water/Sanitary
03/01/2021——Storm
1 project · most recent 03/08/2024
General Wiring
FiledStatusContractorScope
03/08/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
4 projects · most recent 03/04/2024
Steel Wood Masonry Concrete
FiledStatusContractorScope
03/04/2024Permit IssuedBIN LING CONSTRUCTION LLCSteel, Masonry, Wood
03/02/2021——Steel, Concrete, Wood
03/01/2021——Steel, Wood
03/01/2021——1 scope_items
1 project · most recent 12/10/2019
Fence
FiledStatusContractorScope
12/10/2019Permit Issued210 CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/23/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
03/12/2024MeteringDEZHANG FANGenergy_progress
03/12/2024Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
03/12/2024Interior lighting powerDEZHANG FANGenergy_progress
03/12/2024Fenestration areasDEZHANG FANGenergy_progress
03/12/2024Permanent certificateDEZHANG FANGenergy_progress
03/12/2024Maintenance informationDEZHANG FANGenergy_progress
03/12/2024Protection of exposed foundation insulationDEZHANG FANGenergy_progress
03/12/2024Fenestration air leakageDEZHANG FANGenergy_progress
03/12/2024Air barrier — testing DEZHANG FANGenergy_progress
03/12/2024Electric vehicle service equipment requirementsDEZHANG FANGenergy_progress
03/12/2024Insulation placement and R valuesDEZHANG FANGenergy_progress
03/12/2024Air barrier - visual inspectionDEZHANG FANGenergy_progress
03/12/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
03/12/2024Concrete - Cast-In-PlaceDEZHANG FANGspecial
03/12/2024MasonryDEZHANG FANGspecial
03/12/2024Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
03/12/2024Structural Steel - DetailsDEZHANG FANGspecial
03/12/2024Structural Steel - High Strength BoltingDEZHANG FANGspecial
03/12/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
03/12/2024Footing and FoundationDEZHANG FANGprogress
03/12/2024Structural Wood FrameDEZHANG FANGprogress
03/12/2024FinalDEZHANG FANGprogress
03/12/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
03/12/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
10/05/2023Maintenance informationDEZHANG FANGenergy_progress
Latest 25 of 60.
▾Documents — 125 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
08/27/2026Q00477767-I1Request digital key ↗
08/27/2026Q00477682-I1Request digital key ↗
08/27/2026Q00477737-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026Q00277991-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00296826-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/27/2026Q00296817-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
09/18/2023440611081Open ↗
09/18/2023440660045Open ↗
11/01/2020440611081Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
06/13/2024440805390Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/17/2023440805390Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026Q00743286-P1Open ↗
08/15/2026Q00743286-I1Open ↗
08/13/2026Q00743286-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00790217-I1Open ↗
08/13/2026Q00790217-P2Open ↗
▸BISZONING DIAGRAM1
02/22/2021440611081Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00743286-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026Q00477737-I1Open ↗
09/01/2026Q00477737-I1Open ↗
09/01/2026Q00477737-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q00477737-I1Open ↗
09/01/2026Q00477737-I1Open ↗
08/30/2026Q00477682-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00277991-I1Open ↗
08/27/2026Q00477767-I1Open ↗
08/27/2026Q00477682-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/06/2021440660045Open ↗
07/30/2020440611081Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/29/2020440611081Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/06/2021440660045Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/22/2021440611081Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/23/2026Q00743286-P1Open ↗
08/15/2026Q00743286-I1Open ↗
08/13/2026Q00743286-P2Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
02/22/2021440611081Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
02/22/2021440611081Open ↗
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist3
08/23/2026Q00743286-P1Open ↗
08/15/2026Q00743286-I1Open ↗
08/13/2026Q00743286-P2Open ↗
▸BISSTREET TREES SITE PLAN2
06/12/2024440805390Open ↗
01/19/2021440611081Open ↗
▸BISSTREET TREE CHECKLIST2
10/02/2023440805390Open ↗
02/22/2021440611081Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/17/2023440805390Open ↗
▸BISSTREET TREE SIGNOFF1
06/12/2024440805390Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00743286-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00743286-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00743286-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/30/2020440611081Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00743286-I1Open ↗
▸Inspections & Test Reports2
▸BISBPP: FIELD INSPECTION1
06/13/2024440805390Open ↗
▸BISSOIL REPORT1
01/19/2021440611081Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
11/01/2020440611081Open ↗
11/01/2020440611081Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
06/12/2024440805390Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
06/13/2024440805390Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
01/06/2021440660045Open ↗
07/29/2020440611081Open ↗
▸BISADDITIONAL INFORMATION1
01/26/2021440611081Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/17/2023440805390Open ↗
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION3
06/13/2024440805390Open ↗
10/17/2023440805390Open ↗
10/02/2023440805390Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026Q00743286-I1Open ↗
08/13/2026Q00743286-P1Open ↗
08/13/2026Q00743286-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/23/2026Q00743286-P1Open ↗
08/15/2026Q00743286-I1Open ↗
08/13/2026Q00743286-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00743286-P1Open ↗
08/15/2026Q00743286-I1Open ↗
08/13/2026Q00743286-P2Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
06/13/2024440805390Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/22/2021440611081Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
06/13/2024440805390Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
06/13/2024440805390Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00743286-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00743286-I1Open ↗