← Back
Primarily 1 family with 1 store or office
47-12 GREENPOINT AVENUE
QUEENS · Sunnyside · BIN 4001516
💬 Discuss this project
1924Year Built
2Stories
S1Building Class
R6AZoning
2,000 sfGross Floor Area
2Units
Primarily 1 family with 1 store or office · 1,520 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalOther
Roof3p · 2 filings · 19 docs
Floor 21p · 1 filing · 15 docs
Floor 1
Cellar2p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC110/27/2025
KENDALL ENGINEERING PC201/30/2024
LAURA HEIM ARCHITECT PLLC101/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JME BUILDING CONSULTING603/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIS RENOVATIONS CORPGeneral Contractor407/08/2026
KJK ELECTRIC INCElectrical103/22/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244110/27/2025
KENDALL ENGINEERING PC4154101/30/2024
CITY-WIDE TESTING INC416101/23/2024
Building Lifecycle
All (35)Filed (4)Permit Issued (4)Signed Off (4)Inspection (3)Special Inspection (20)
01/08/2026
Signed off — Alteration
Q01305506-I1
10/29/2025
Permit issued — Solar
Q01305506-I1-SL
10/27/2025
Filed — Alteration
Q01305506-I1
05/30/2025
Signed off — Alteration
PLUMBING RENOVATION WORK ASSOCIATED WITH GENERAL CONSTRUCTION OF TWO STORY RESIDENTIAL & COMMERCIAL BUILDING FROM THE CELLAR THROUGH THE ROOF OF BUILDING AS PER THE PLANS FILED HEREWITH.
Q00969465-I1
04/28/2025
Signed off — Alteration
PLUMBING RENOVATION WORK ASSOCIATED WITH GENERAL CONSTRUCTION OF TWO STORY RESIDENTIAL & COMMERCIAL BUILDING FROM THE CELLAR THROUGH THE ROOF OF BUILDING AS PER THE PLANS FILED HEREWITH.
Q00969465-S1
04/28/2025
Signed off — Alteration
PLUMBING RENOVATION WORK ASSOCIATED WITH GENERAL CONSTRUCTION OF TWO STORY RESIDENTIAL & COMMERCIAL BUILDING FROM THE CELLAR THROUGH THE ROOF OF BUILDING AS PER THE PLANS FILED HEREWITH.
Q00969465-S2
01/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2024
Permit issued — Plumbing
Q00969465-S1-PL
05/08/2024
Permit issued — General Construction
Q00969465-I1-GC
05/08/2024
Permit issued — Mechanical Systems
Q00969465-S2-MS
01/30/2024
Filed — Alteration
PLUMBING RENOVATION WORK ASSOCIATED WITH GENERAL CONSTRUCTION OF TWO STORY RESIDENTIAL & COMMERCIAL BUILDING FROM THE CELLAR THROUGH THE ROOF OF BUILDING AS PER THE PLANS FILED HEREWITH.
Q00969465-S1
01/30/2024
Filed — Alteration
PLUMBING RENOVATION WORK ASSOCIATED WITH GENERAL CONSTRUCTION OF TWO STORY RESIDENTIAL & COMMERCIAL BUILDING FROM THE CELLAR THROUGH THE ROOF OF BUILDING AS PER THE PLANS FILED HEREWITH.
Q00969465-S2
01/23/2024
Filed — Alteration
PLUMBING RENOVATION WORK ASSOCIATED WITH GENERAL CONSTRUCTION OF TWO STORY RESIDENTIAL & COMMERCIAL BUILDING FROM THE CELLAR THROUGH THE ROOF OF BUILDING AS PER THE PLANS FILED HEREWITH.
Q00969465-I1
01/17/2024
Special inspection requirement — Mechanical Systems
KEVIN KENDALL
01/17/2024
Special inspection requirement — Final
KEVIN KENDALL
01/17/2024
Special inspection requirement — Energy Code Compliance Inspections
KEVIN KENDALL
01/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
KEVIN KENDALL
01/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
KEVIN KENDALL
01/17/2024
Special inspection requirement — Maintenance information
KEVIN KENDALL
01/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
KEVIN KENDALL
01/17/2024
Special inspection requirement — Shutoff dampers
KEVIN KENDALL
01/17/2024
Special inspection requirement — Permanent certificate
KEVIN KENDALL
11/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
11/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
11/30/2023
Special inspection requirement — Permanent certificate
ELIAS RASABI
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
11/30/2023
Special inspection requirement — Final
ELIAS RASABI
11/30/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
11/30/2023
Special inspection requirement — Insulation placement and R values
ELIAS RASABI
11/30/2023
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
11/30/2023
Special inspection requirement — Air barrier - visual inspection
ELIAS RASABI
11/30/2023
Special inspection requirement — Metering
ELIAS RASABI
11/30/2023
Special inspection requirement — Interior lighting power
ELIAS RASABI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC10/29/2025
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC07/15/2024
DOB NOWGeneral ConstructionSigned-offAIS RENOVATIONS CORP05/08/2024
DOB NOWMechanical SystemsSigned-offAIS RENOVATIONS CORP05/08/2024
BIS—ISSUEDNEW YORK SIGN CITY06/16/2003
2 projects · most recent 10/20/2025
General Wiring
FiledStatusContractorScope
10/20/2025CompleteBROOKYLN SOLARWORKS, LLC—
12/16/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/17/2024Mechanical SystemsKEVIN KENDALLspecial
01/17/2024FinalKEVIN KENDALLprogress
01/17/2024Energy Code Compliance InspectionsKEVIN KENDALLprogress
01/17/2024HVAC-R and service water piping design and insulationKEVIN KENDALLenergy_progress
01/17/2024HVAC-R and service water heating equipmentKEVIN KENDALLenergy_progress
01/17/2024Maintenance informationKEVIN KENDALLenergy_progress
01/17/2024HVAC-R and service water heating system controlsKEVIN KENDALLenergy_progress
01/17/2024Shutoff dampersKEVIN KENDALLenergy_progress
01/17/2024Permanent certificateKEVIN KENDALLenergy_progress
11/30/2023Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
11/30/2023Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
11/30/2023Permanent certificateELIAS RASABIenergy_progress
11/30/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
11/30/2023FinalELIAS RASABIprogress
11/30/2023Energy Code Compliance InspectionsELIAS RASABIprogress
11/30/2023Insulation placement and R valuesELIAS RASABIenergy_progress
11/30/2023Fenestration air leakageELIAS RASABIenergy_progress
11/30/2023Air barrier - visual inspectionELIAS RASABIenergy_progress
11/30/2023MeteringELIAS RASABIenergy_progress
11/30/2023Interior lighting powerELIAS RASABIenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026Q00969465-I1Request digital key ↗
08/23/2026Q00969465-S1Request digital key ↗
08/23/2026Q00969465-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026Q00969465-I1Open ↗
08/23/2026Q00969465-S1Open ↗
08/23/2026Q00969465-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026Q00969465-S2Open ↗
08/29/2026Q00969465-S2Open ↗
08/22/2026Q00969465-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q00969465-S2Open ↗
08/22/2026Q00969465-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026Q00969465-S2Open ↗
08/23/2026Q00969465-I1Open ↗
08/23/2026Q00969465-S1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01305506-I1Open ↗