← Back
Cape Cod
47-15 194 STREET
QUEENS · Auburndale · BIN 4126905
💬 Discuss this project
1925Year Built
1.5Stories
A0Building Class
R2AZoning
1,350 sfGross Floor Area
1Units
Cape Cod · 4,000 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 29p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar8p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/17/2021$860K—— → —$637/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC608/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ZHENG ASSOCIATE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor404/09/2026
XH RC PLBG HTGGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330508/09/2022
Building Lifecycle
All (83)Filed (6)Permit Issued (2)Signed Off (3)Inspection (4)Objection (38)Special Inspection (30)
03/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/22/2023
Signed off — Alteration CO
ENLARGEMENT OF EXISTING ONE FAMILY DWELLING UNIT. OBTAIN C OF O.
Q00587132-I1
01/24/2023
Signed off — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH ALT1 JOB.
Q00586434-I1
12/28/2022
Signed off — Alteration
Q00584707-I1
12/06/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/22/2022
Special inspection requirement — Metering
Jinfar Liu
08/22/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Jinfar Liu
08/22/2022
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
08/22/2022
Special inspection requirement — Final
Jinfar Liu
08/22/2022
Special inspection requirement — Footing and Foundation
Jinfar Liu
08/22/2022
Special inspection requirement — Permanent certificate
Jinfar Liu
08/22/2022
Special inspection requirement — Shutoff dampers
Jinfar Liu
08/22/2022
Special inspection requirement — Insulation placement and R values
Jinfar Liu
08/22/2022
Special inspection requirement — Fenestration areas
Jinfar Liu
08/22/2022
Special inspection requirement — Protection of exposed foundation insulation
Jinfar Liu
08/22/2022
Special inspection requirement — Ventilation and air distribution system
Jinfar Liu
08/22/2022
Special inspection requirement — Maintenance information
Jinfar Liu
08/22/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jinfar Liu
08/22/2022
Special inspection requirement — Interior lighting power
Jinfar Liu
08/22/2022
Special inspection requirement — Air barrier - visual inspection
Jinfar Liu
08/22/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jinfar Liu
08/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
08/22/2022
Special inspection requirement — Concrete – Prestressed
Jinfar Liu
08/22/2022
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Jinfar Liu
08/22/2022
Special inspection requirement — Mechanical Systems
Jinfar Liu
08/22/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/22/2022
Special inspection requirement — Structural Steel - Details
Jinfar Liu
08/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jinfar Liu
08/19/2022
Objection resolved — Addressed
08/17/2022
Objection raised — Zoning
08/09/2022
Filed — Alteration CO
ENLARGEMENT OF EXISTING ONE FAMILY DWELLING UNIT. OBTAIN C OF O.
Q00587132-P9
08/05/2022
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH ALT1 JOB.
Q00586434-P2
08/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
08/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
08/05/2022
Special inspection requirement — Metering
Jinfar Liu
08/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
08/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
08/05/2022
Special inspection requirement — Maintenance information
Jinfar Liu
08/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
05/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/28/2022
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH ALT1 JOB.
Q00586434-P1
01/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2021
Permit issued — General Construction
Q00587132-I1-GC-CX
11/05/2021
Permit issued — Construction Fence
Q00584707-I1-FN
09/15/2021
Objection raised — Zoning
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Zoning
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Zoning
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Other
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Zoning
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Zoning
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Zoning
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection raised — Zoning
09/15/2021
Objection resolved — Addressed
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSPLEN CONSTRUCTION INC11/16/2021
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC11/05/2021
1 project · most recent 08/09/2022
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/09/2022Permit IssuedSPLEN CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUZ-GL 18NA 120,000 BTU · Heat Pump Outdoor ×4
MUZ-GL09NA 120,000 BTU · Heat Pump Outdoor ×4
Lg LG 120,000 BTU · Split System ×4
Ventilation
Broan HRVH100 20 CFM · Erv ×8
1 project · most recent 10/04/2022
General Wiring
FiledStatusContractorScope
10/04/2022CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 08/09/2022
Steel Wood
FiledStatusContractorScope
08/09/2022Permit IssuedSPLEN CONSTRUCTION INCSteel, Wood
1 project · most recent 08/09/2022
Earthwork
FiledStatusContractorScope
08/09/2022Permit IssuedSPLEN CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/22/2022MeteringJinfar Liuenergy_progress
08/22/2022Structural Steel - High Strength BoltingJinfar Liuspecial
08/22/2022Concrete - Cast-In-PlaceJinfar Liuspecial
08/22/2022FinalJinfar Liuprogress
08/22/2022Footing and FoundationJinfar Liuprogress
08/22/2022Permanent certificateJinfar Liuenergy_progress
08/22/2022Shutoff dampersJinfar Liuenergy_progress
08/22/2022Insulation placement and R valuesJinfar Liuenergy_progress
08/22/2022Fenestration areasJinfar Liuenergy_progress
08/22/2022Protection of exposed foundation insulationJinfar Liuenergy_progress
08/22/2022Ventilation and air distribution systemJinfar Liuenergy_progress
08/22/2022Maintenance informationJinfar Liuenergy_progress
08/22/2022Fenestration and door U-factor and product ratingsJinfar Liuenergy_progress
08/22/2022Interior lighting powerJinfar Liuenergy_progress
08/22/2022Air barrier - visual inspectionJinfar Liuenergy_progress
08/22/2022Excavations - Sheeting, Shoring, and BracingJinfar Liuspecial
08/22/2022Fire-Resistant Penetrations and JointsJinfar Liuspecial
08/22/2022Concrete – PrestressedJinfar Liuspecial
08/22/2022Wood – Metal-Plate-Connected TrussesJinfar Liuspecial
08/22/2022Mechanical SystemsJinfar Liuspecial
08/22/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/22/2022Structural Steel - DetailsJinfar Liuspecial
08/22/2022Structural Stability – Alterations of existing buildingsJinfar Liuspecial
08/05/2022Energy Code Compliance InspectionsJinfar Liuprogress
08/05/2022HVAC-R and service water heating system controlsJinfar Liuenergy_progress
Latest 25 of 37.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00584707-I1Request digital key ↗
08/27/2026Q00586434-I1Request digital key ↗
08/27/2026Q00586434-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00587132-I1Open ↗
08/13/2026Q00587132-P9Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00587132-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026Q00587132-I1Open ↗
09/02/2026Q00587132-I1Open ↗
09/02/2026Q00587132-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026Q00587132-I1Open ↗
09/02/2026Q00587132-I1Open ↗
09/02/2026Q00587132-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00586434-I1Open ↗
08/26/2026Q00587132-P9Open ↗
08/26/2026Q00587132-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00587132-I1Open ↗
08/13/2026Q00587132-P9Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00586434-I1Open ↗
08/27/2026Q00586434-P1Open ↗
08/15/2026Q00587132-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00586434-I1Open ↗
08/13/2026Q00587132-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00587132-P9Open ↗
08/13/2026Q00587132-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00587132-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00587132-I1Open ↗
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00587132-I1Open ↗
08/13/2026Q00587132-P9Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00587132-I1Open ↗
08/13/2026Q00587132-P9Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026Q00587132-I1Open ↗
08/15/2026Q00587132-P9Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00587132-P9Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00587132-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00587132-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00587132-I1Open ↗