← Back
Two stories - detached, small or mid-size
47-24 156 STREET
QUEENS · BIN 4123984
💬 Discuss this project
1905Year Built
2.75Stories
A1Building Class
R2AZoning
2,848 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,800 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 34p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
1 job · most recent 08/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/06/2025Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
1 job · most recent 06/12/2025
FiledStatusContractorScope
06/12/2025CompleteSUNRUN SOLAR ELECTL CORP—
Building Lifecycle
All (36)Filed (6)Permit Issued (3)Signed Off (1)Inspection (2)Special Inspection (24)
01/21/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01238136-I1
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/07/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
08/07/2025
Special inspection requirement — Final
ZHENHUAN XU
08/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
08/07/2025
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
08/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ZHENHUAN XU
08/07/2025
Special inspection requirement — Fenestration areas
ZHENHUAN XU
08/07/2025
Special inspection requirement — Fenestration air leakage
ZHENHUAN XU
08/06/2025
Filed — Alteration
INSTALL (6) NEW, (6) RELOCATE, (3) REPLACE, (2) CAP AND REMOVE PLUMBING FIXTURES. CAP AND REMOVE (3) AND INSTALL (1) NEW GAS EQUIPMENT IN CONJUNCTION WITH DOBNOW # Q01174086-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01174086-P3
08/06/2025
Filed — Alteration
INSTALL (6) NEW, (6) RELOCATE, (3) REPLACE, (2) CAP AND REMOVE PLUMBING FIXTURES. CAP AND REMOVE (3) AND INSTALL (1) NEW GAS EQUIPMENT IN CONJUNCTION WITH DOBNOW # Q01174086-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01174086-P2
08/06/2025
Special inspection requirement — Fenestration areas
ZHENHUAN XU
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
08/06/2025
Special inspection requirement — Final
ZHENHUAN XU
08/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
08/06/2025
Special inspection requirement — Fenestration air leakage
ZHENHUAN XU
08/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ZHENHUAN XU
08/06/2025
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
07/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2025
Permit issued — Solar
Q01238136-I1-SL
06/12/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01238136-I1
06/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/09/2025
Special inspection requirement — Final
Walid Abdulla
06/09/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/03/2025
Filed — Alteration
INSTALL (6) NEW, (6) RELOCATE, (3) REPLACE, (2) CAP AND REMOVE PLUMBING FIXTURES. CAP AND REMOVE (3) AND INSTALL (1) NEW GAS EQUIPMENT IN CONJUNCTION WITH DOBNOW # Q01174086-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01174086-P1
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
04/25/2025
Permit issued — Plumbing
Q01174086-S1-PL
03/04/2025
Permit issued — General Construction
Q01174086-I1-GC
02/26/2025
Filed — Alteration
INSTALL (6) NEW, (6) RELOCATE, (3) REPLACE, (2) CAP AND REMOVE PLUMBING FIXTURES. CAP AND REMOVE (3) AND INSTALL (1) NEW GAS EQUIPMENT IN CONJUNCTION WITH DOBNOW # Q01174086-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01174086-S1
02/26/2025
Filed — Alteration
INSTALL (6) NEW, (6) RELOCATE, (3) REPLACE, (2) CAP AND REMOVE PLUMBING FIXTURES. CAP AND REMOVE (3) AND INSTALL (1) NEW GAS EQUIPMENT IN CONJUNCTION WITH DOBNOW # Q01174086-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01174086-I1
01/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUAN DESIGN INC.508/06/2025
PARKER AND WEST ENGINEERING, PLLC106/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669508/06/2025
PARKER AND WEST ENGINEERI5272106/12/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/24/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.04/25/2025
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN03/04/2025
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/07/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/07/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/07/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
08/07/2025FinalZHENHUAN XUprogress
08/07/2025Fire-Resistance Rated ConstructionZHENHUAN XUprogress
08/07/2025Air barrier - visual inspectionZHENHUAN XUenergy_progress
08/07/2025Fenestration and door U-factor and product ratingsZHENHUAN XUenergy_progress
08/07/2025Fenestration areasZHENHUAN XUenergy_progress
08/07/2025Fenestration air leakageZHENHUAN XUenergy_progress
08/06/2025Fenestration areasZHENHUAN XUenergy_progress
08/06/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
08/06/2025FinalZHENHUAN XUprogress
08/06/2025Fire-Resistance Rated ConstructionZHENHUAN XUprogress
08/06/2025Fenestration air leakageZHENHUAN XUenergy_progress
08/06/2025Fenestration and door U-factor and product ratingsZHENHUAN XUenergy_progress
08/06/2025Air barrier - visual inspectionZHENHUAN XUenergy_progress
08/06/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/06/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
06/09/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/09/2025Energy Code Compliance InspectionsWalid Abdullaprogress
06/09/2025FinalWalid Abdullaprogress
06/09/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
06/09/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/27/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q01174086-P3Request digital key ↗
08/20/2026Q01174086-P2Request digital key ↗
08/20/2026Q01174086-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026Q01174086-P2Open ↗
09/02/2026Q01174086-P2Open ↗
09/02/2026Q01174086-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/20/2026Q01174086-P1Open ↗
09/02/2026Q01174086-P2Open ↗
08/23/2026Q01174086-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01174086-P3Open ↗
08/20/2026Q01174086-P2Open ↗
08/20/2026Q01174086-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026Q01174086-P3Open ↗
08/20/2026Q01174086-P2Open ↗
08/20/2026Q01174086-P1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01238136-I1Open ↗