47-27 LITTLE NECK PARKWAY
QUEENS · BIN 4171647
💬 Discuss this project
1961Year Built
6Stories
D4Building Class
R1-2Zoning
47,040 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized15 Active Violations 12 unresolved · 3 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: Country Neck · 47,475 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofVZW gas piping system upgradeUnder Construction27p · 10 filings · 20 docs
BulkheadIndependent protected bulkhead wraps2p · 1 filing · 2 docs
Floor 3LS-6 Generator Set UpgradeUnder Construction3p · 1 filing · 5 docs
Floor 2
Floor 1Heavy duty sidewalk shed installation8p · 3 filings · 20 docs
CellarVZW gas piping system upgrade4p · 2 filings · 20 docs
BasementVerizon telecommunications site installation1p · 1 filing · 4 docs
Sub-BasementSprint rooftop antenna removal19p · 2 filings · 20 docs
Site & exteriorFairfield Properties41p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fairfield Properties803/22/2026
Country Neck603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rimkus106/18/2025
Magnum Opus Architecture206/17/2025
Grant305/24/2024
William F. Collins Architects512/02/2022
FL&M Engineering Design & Inspection206/09/2022
Azimuth Engineering103/05/2021
Maser Consulting P.A702/25/2021
Maser Consulting PA202/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services1803/21/2026
Skyline Access103/21/2026
Codegreen203/21/2026
Rigid Structural Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Relaince-TechGeneral Contractor607/08/2026
Tri Borough ScaffoldingScaffold407/08/2026
TristruxGeneral Contractor403/21/2026
Aura PlumbingPlumbing307/08/2026
Gurnoor ConstructionGeneral Contractor203/21/2026
Watch Hill Wireless SolutionsGeneral Contractor107/08/2026
Gurnoor ConstructionScaffold104/09/2026
Alliance Elevator CompanyElectrical103/22/2026
Tidal Plumbing & HeatingPlumbing107/08/2026
Communication Component SGeneral Contractor107/08/2026
Fast Track Electricspecialty_contractor104/09/2026
Himalaya TowersGeneral Contractor107/08/2026
Penta Restorationspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Magnum Opus Architecture1206206/17/2025
Grant Engineering Consulting3512305/24/2024
Crosscheck Inspection Services544512/02/2022
AA Building & Inspection1519101/21/2022
Jeremy K McKeon, P.E7263103/05/2021
R Marsac Consulting329802/25/2021
William F. Collins, AIA A1420108/15/2019
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/08/2026
Elevator Category 1 inspection report filed
08/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
256 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTidal Plumbing & Heating01/15/2026
DOB NOWMechanical SystemsPermit IssuedFast Track Electric12/11/2025
DOB NOWGeneral ConstructionSigned-offGurnoor Construction06/24/2025
DOB NOWSidewalk ShedSigned-offGurnoor Construction06/18/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration07/10/2024
DOB NOWAntennaSigned-offTristrux01/19/2023
DOB NOWGeneral ConstructionPermit IssuedTristrux01/19/2023
DOB NOWSidewalk ShedPermit IssuedTri Borough Scaffolding05/10/2022
DOB NOWSidewalk ShedPermit IssuedTri Borough Scaffolding05/10/2022
DOB NOWGeneral ConstructionSigned-offPenta Restoration05/03/2022
DOB NOWAntennaSigned-offWatch Hill Wireless Solutions03/30/2022
DOB NOWAntennaSigned-offHimalaya Towers04/09/2021
DOB NOWPlumbingSigned-offAura Plumbing01/25/2021
DOB NOWAntennaSigned-offRelaince-Tech12/22/2020
DOB NOWMechanical SystemsSigned-offRelaince-Tech12/22/2020
DOB NOWAntennaSigned-offRelaince-Tech04/28/2020
DOB NOWPlumbingSigned-offAura Plumbing04/17/2020
DOB NOWMechanical SystemsSigned-offRelaince-Tech04/17/2020
DOB NOWPlumbingSigned-offAura Plumbing03/26/2020
DOB NOWAntennaPermit IssuedCommunication Component S02/14/2020
BISPLISSUEDAce-Atlas Plbing & Heating06/15/2020
BISMHISSUEDCommunication Component S03/16/2020
BISOTISSUEDCommunication Component S01/24/2013
BISOTISSUEDOdyssia Global Commercial12/04/2012
BISBLISSUEDGee Cee Mechanical Service10/03/2012
BISFBISSUEDGee Cee Mechanical Service09/27/2012
BISPLISSUEDService Tech Mechanical & Plumbing09/27/2012
BISOTISSUEDBci Communications08/27/2010
BISOTISSUEDAntelex Wireless02/12/2008
BISOTISSUEDJava Contracting11/21/2006
BISEQISSUEDMBR Contracting11/17/2006
BISOTISSUEDBeta Mechanical, Inc./Better Engineering10/21/1998
6 projects · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026Permit IssuedTrincity Electric—
05/11/2022Permit IssuedSolas Electrical—
02/12/2021Permit IssuedUtell & Son Electrical ContGeneral Wiring
03/19/2020CompleteBay ElectricGeneral Wiring
08/16/2019CompleteJ.A. Lee Electric ServicesGeneral Wiring
05/06/2018Permit IssuedAlliance Elevator Company—
1 project · most recent 06/09/2022
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/09/2022Permit IssuedTri Borough ScaffoldingScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/05/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/22/2022FinalEUGENE BIFULCOprogress
11/21/2022Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
11/15/2022Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
11/11/2022Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
09/22/2022FinalEUGENE BIFULCOprogress
09/22/2022Mechanical SystemsEUGENE BIFULCOspecial
03/18/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/20/2021MasonryMARCIANO STANCOspecial
08/20/2021FinalMARCIANO STANCOprogress
08/20/2021Energy Code Compliance InspectionsMARCIANO STANCOprogress
04/22/2021Fire-Resistant Penetrations and JointsRobert Marsacspecial
02/18/2021Fire-Resistant Penetrations and JointsRobert Marsacspecial
12/21/2020Fire-Resistant Penetrations and JointsRobert Marsacspecial
07/28/2020Mechanical SystemsRobert Marsacspecial
07/28/2020FinalRobert Marsacprogress
07/28/2020Fire-Resistant Penetrations and JointsRobert Marsacspecial
07/15/2020Fire-Resistant Penetrations and JointsRobert Marsacspecial
07/15/2020Fire-Resistant Penetrations and JointsRobert Marsacspecial
07/15/2020FinalRobert Marsacprogress
07/15/2020Mechanical SystemsRobert Marsacspecial
02/19/2020Fire-Resistant Penetrations and Joints—special
02/19/2020Mechanical Systems—special
02/19/2020Final—progress
183 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account